Project progress work #8

closed

Parent project #560: [PJ230033]Label printing system concept1

Support installation for power supply and LAN cable for 50 points

Added by Arunwit Isarapongporn about 2 years ago. Updated over 1 year ago.

Status:
Closed
Priority:
Normal
Start date:
01 Nov 2023
Due date:
01 Nov 2023
% Done:

100%

Estimated time:
120.00 h
Spent time:
Finish date:
24 Oct 2023
Programming skills:
DB skills:
OS skills:

Description

Support installation for power supply and LAN cable for 50 points
- Control and coordinate between wiring or LAN installers and site supervisors at the installation plant.
- Config IP address of label printer and install in chip room
- Config access point for 4 points
- Install and config server of label print system


Files

DESIGN DRAWING R3.pdf (967 KB) DESIGN DRAWING R3.pdf Arunwit Isarapongporn, 06 Oct 2023 08:50
Infrastructure settings list_R1.xlsx (34.8 KB) Infrastructure settings list_R1.xlsx Arunwit Isarapongporn, 27 Oct 2023 09:51
Actions #1

Updated by Arunwit Isarapongporn about 2 years ago

  • Status changed from New to In Progress
  • % Done changed from 0 to 30

today install 10 position

and tomorrow install 10point

Actions #2

Updated by Arunwit Isarapongporn about 2 years ago

  • Subject changed from Support installation for power supply and LAN cable for 70 points to Support installation for power supply and LAN cable for 50 points
  • Description updated (diff)
  • % Done changed from 30 to 40

Install power plugs and LAN connections in chip room for 50 point

Actions #3

Updated by Arunwit Isarapongporn about 2 years ago

- Install the electrical cabinet and electrical rail in the Chip room and connect the wires.
- Install the LAN cable connection point and powerplug with wires, complete 35 points
- Wiring the power cable and LAN cable above the ceiling to the powerplug point and LAN connection point.
- Config IP address for 10 label printers

Actions #4

Updated by Arunwit Isarapongporn about 2 years ago

- Install the electrical cabinet and electrical rail in the Chip room and connect the wires.
- Install the LAN cabinet and LAN rail in the Chip room and connect the LAN cable.
- Install the LAN cable connection point and powerplug with wires, complete 15 points
- Wiring the power cable and LAN cable above the ceiling to the powerplug point and LAN connection point.

Actions #5

Updated by Ryo Nozaki about 2 years ago

Actions #6

Updated by Arunwit Isarapongporn about 2 years ago

19/10/2023
- The power distribution cabinet and lag hub cabinet have been installed and connected to the Network.
- Electrical wires and LAN cable connections are complete at every point of the machine.
- Completed installation and config of 32 printers, remaining 18 to install.
- Labels have been attached to all LAN cables and printers.
- Keep all wires and LAN cables from the ceiling down.

20/20/2023
- Today I will install 18 more printers and finish configuring all printers.
- Config Handy with Access point

Actions #7

Updated by Arunwit Isarapongporn about 2 years ago

  • Finish date changed from 16 Oct 2023 to 24 Oct 2023

[24/10/23]
-Setup IP address and setting application for all remaining Handy terminal devices.
-The setup printer name and IP address is complete on all machines.
-Label the names of all printers.
-Silicone to keep the gaps on the side of the power cabinet and LAN cabinet.
-Test the operation of the entire system.

Today
-Test & User training

Actions #8

Updated by Arunwit Isarapongporn about 2 years ago

Add document Infrastructure settings list_R1.xlsx

Actions #9

Updated by Ryo Nozaki over 1 year ago

  • Status changed from In Progress to Closed
Actions #10

Updated by Ryo Nozaki over 1 year ago

  • Project changed from 30 to Asian Stanley. International Limited
  • Parent task set to #560
Actions

Also available in: Atom PDF