Sales support #67
closedAutomatic label pasting machine Concept proposal
Added by Ryo Nozaki about 2 years ago. Updated over 1 year ago.
Files
Updated by Nattapol Poeam about 2 years ago
- File Material Received Report - 2023-10-17.xlsx Material Received Report - 2023-10-17.xlsx added
- File 1_MRU-F5100US_spec sheet.pdf 1_MRU-F5100US_spec sheet.pdf added
- File MRU1000U.pdf MRU1000U.pdf added
- Status changed from New to In Progress
- Material Received Data
- RFID equipment spec
Updated by Nattapol Poeam about 2 years ago
- File Assembly 01-ATT.zip Assembly 01-ATT.zip added
- File Estimate cost panasonic_R1.xlsx Estimate cost panasonic_R1.xlsx added
- File Keyence.zip Keyence.zip added
- File Q-ATT-2311-004 (Tomas Tech).pdf Q-ATT-2311-004 (Tomas Tech).pdf added
- % Done changed from 0 to 30
- Quotation equipment keyence
- Quotation ATT
Updated by Nattapol Poeam about 2 years ago
- File Process flow.PNG Process flow.PNG added
- File Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R1.pdf Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R1.pdf added
- % Done changed from 30 to 50
[ Today ]
Meeting agenda
1. Packet material
2. Layout machine
3. Process flow
[ Requiment from customer ]
1. Modify the concept point 1 for reading Supplier information. Using SR-Reader to read data and adjust the position automatically. And if it's a large workpiece, you can use Handy to read the data instead of SR.
2. SR-Reader must automatically adjust height according to Supplier information model.
3. The customer wants to know how to send supplier information to the server. What method is used?
4. The customer wants to know if they want to add a set of automatic workloads to the box, how many additional courses will be required and what is the concept like?
5. The customer wants to finalize the price and concept by the 24th of this month.
ุ6. The customer wants to know information about the Tack time and Cycle time of all machines.
[ Next Action ]
1. Modify the concept of point 1 and consult with the Keyence team to test the readability of all models of customer workpieces.
2. Design mechanics to be able to read information for all models of customer work pieces.
3. Design a concept for data transmission between the Barcode server and the machine.
4. Design a concept for Phase 2. This phase must be able to continue work from Phase 1. Phase 2 is to automatically place workpieces into boxes or trays.
5. Design and calculate machine cycle time
6. Revised prices and concepts sent to customers within the 24th.
Updated by Nattapol Poeam about 2 years ago
- File Estimate cost Auto labeling machine for panasonic_R2.xlsx Estimate cost Auto labeling machine for panasonic_R2.xlsx added
- File Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R2.pdf Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R2.pdf added
- File Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R2.pptx Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R2.pptx added
- File Assembly 02 (PDF-3D) Rev 2.pdf Assembly 02 (PDF-3D) Rev 2.pdf added
- File Assembly 02-ATT Rev02.zip Assembly 02-ATT Rev02.zip added
- % Done changed from 50 to 80
[ To day ] Meeting about
- Update
► Packet material
► Layout machine
► Process flow
► Operation flow
Quotation
[ Next Action ]
- Concept detail 03/67
- Add vendor code 03/67
- Do a test on reading Supplier code with SR-X300W.
- Borrowed the Nachi robot to do a test on receiving values from the camera and applying stickers.
Updated by Ryo Nozaki about 2 years ago
- Due date changed from 27 Oct 2023 to 15 Mar 2024
Meeting with k.boy 18th Dec
We will prepare demo unit for customer within March 2024
Updated by Ryo Nozaki over 1 year ago
- Due date changed from 15 Mar 2024 to 31 May 2024
Updated by Nattapol Poeam over 1 year ago
- % Done changed from 80 to 100
- Finish date set to 31 May 2024
Updated by Nattapol Poeam over 1 year ago
- Status changed from In Progress to Confirmation request
Updated by Kittisak Isarapongporn over 1 year ago
- Status changed from Confirmation request to Close request
Updated by Ryo Nozaki over 1 year ago
- Status changed from Close request to Closed