Project

General

Profile

Actions

Sales support #67

closed

Automatic label pasting machine Concept proposal

Added by Ryo Nozaki about 2 years ago. Updated over 1 year ago.

Status:
Closed
Priority:
Normal
Start date:
18 Oct 2023
Due date:
31 May 2024
% Done:

100%

Estimated time:
30.00 h
Spent time:
Finish date:
31 May 2024

Files

1_MRU-F5100US_spec sheet.pdf (246 KB) 1_MRU-F5100US_spec sheet.pdf Nattapol Poeam, 19 Oct 2023 21:57
MRU1000U.pdf (164 KB) MRU1000U.pdf Nattapol Poeam, 19 Oct 2023 21:57
Material Received Report - 2023-10-17.xlsx (11.6 MB) Material Received Report - 2023-10-17.xlsx Nattapol Poeam, 19 Oct 2023 21:57
Estimate cost panasonic_R1.xlsx (193 KB) Estimate cost panasonic_R1.xlsx Summarize price Nattapol Poeam, 06 Nov 2023 17:22
Assembly 01-ATT.zip (8.85 MB) Assembly 01-ATT.zip 3D Design Nattapol Poeam, 06 Nov 2023 17:22
Keyence.zip (238 KB) Keyence.zip Quote Nattapol Poeam, 06 Nov 2023 17:22
Q-ATT-2311-004 (Tomas Tech).pdf (294 KB) Q-ATT-2311-004 (Tomas Tech).pdf Quote Nattapol Poeam, 06 Nov 2023 17:22
Process flow.PNG (200 KB) Process flow.PNG Nattapol Poeam, 10 Nov 2023 15:30
Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R1.pdf (1.65 MB) Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R1.pdf Nattapol Poeam, 10 Nov 2023 15:30
Estimate cost Auto labeling machine for panasonic_R2.xlsx (193 KB) Estimate cost Auto labeling machine for panasonic_R2.xlsx Nattapol Poeam, 06 Dec 2023 11:45
Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R2.pdf (1.78 MB) Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R2.pdf Nattapol Poeam, 06 Dec 2023 11:45
Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R2.pptx (19.1 MB) Automatic label pasting machine for PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD._R2.pptx Nattapol Poeam, 06 Dec 2023 11:46
Assembly 02 (PDF-3D) Rev 2.pdf (5.96 MB) Assembly 02 (PDF-3D) Rev 2.pdf Nattapol Poeam, 06 Dec 2023 11:46
Assembly 02-ATT Rev02.zip (9.19 MB) Assembly 02-ATT Rev02.zip Nattapol Poeam, 06 Dec 2023 11:47
Actions #1

Updated by Ryo Nozaki about 2 years ago

  • Assignee set to Nattapol Poeam
Actions #2

Updated by Nattapol Poeam about 2 years ago

- Material Received Data
- RFID equipment spec

Actions #3

Updated by Nattapol Poeam about 2 years ago

- Quotation equipment keyence
- Quotation ATT

Actions #4

Updated by Nattapol Poeam about 2 years ago

[ Today ]
Meeting agenda
1. Packet material
2. Layout machine
3. Process flow
[ Requiment from customer ]
1. Modify the concept point 1 for reading Supplier information. Using SR-Reader to read data and adjust the position automatically. And if it's a large workpiece, you can use Handy to read the data instead of SR.
2. SR-Reader must automatically adjust height according to Supplier information model.
3. The customer wants to know how to send supplier information to the server. What method is used?
4. The customer wants to know if they want to add a set of automatic workloads to the box, how many additional courses will be required and what is the concept like?
5. The customer wants to finalize the price and concept by the 24th of this month.
ุ6. The customer wants to know information about the Tack time and Cycle time of all machines.
[ Next Action ]
1. Modify the concept of point 1 and consult with the Keyence team to test the readability of all models of customer workpieces.
2. Design mechanics to be able to read information for all models of customer work pieces.
3. Design a concept for data transmission between the Barcode server and the machine.
4. Design a concept for Phase 2. This phase must be able to continue work from Phase 1. Phase 2 is to automatically place workpieces into boxes or trays.
5. Design and calculate machine cycle time
6. Revised prices and concepts sent to customers within the 24th.

Actions #5

Updated by Nattapol Poeam about 2 years ago

[ To day ] Meeting about
- Update
► Packet material
► Layout machine
► Process flow
► Operation flow
Quotation
[ Next Action ]
- Concept detail 03/67
- Add vendor code 03/67
- Do a test on reading Supplier code with SR-X300W.
- Borrowed the Nachi robot to do a test on receiving values ​​from the camera and applying stickers.

Actions #6

Updated by Ryo Nozaki about 2 years ago

  • Due date changed from 27 Oct 2023 to 15 Mar 2024

Meeting with k.boy 18th Dec

We will prepare demo unit for customer within March 2024

Actions #7

Updated by Ryo Nozaki over 1 year ago

  • Due date changed from 15 Mar 2024 to 31 May 2024
Actions #8

Updated by Nattapol Poeam over 1 year ago

  • % Done changed from 80 to 100
  • Finish date set to 31 May 2024
Actions #9

Updated by Nattapol Poeam over 1 year ago

  • Status changed from In Progress to Confirmation request
Actions #10

Updated by Kittisak Isarapongporn over 1 year ago

  • Status changed from Confirmation request to Close request
Actions #11

Updated by Ryo Nozaki over 1 year ago

  • Status changed from Close request to Closed
Actions

Also available in: Atom PDF