Project

General

Profile

Calendar

Filters

« October | December »

Apply Clear

Sunday Monday Tuesday Wednesday Thursday Friday Saturday
44

26

27

ShinDengen(Thailand)Co.,Ltd - Parent project #3015: [PJ250090] Operation monito... Parent project #3015: [PJ250090] Operation monitoring system for ShinDengen Customization fee

Project: ShinDengen(Thailand)Co.,Ltd
Status: In Progress
Start date: 27 Oct 2025
Due date: 30 Jan 2026
Assignee: Nattapol Poeam
Priority: Normal

28

29

THAI INABA FOODS COMPANY LIMITED - Project progress work #2863: [Coding] HT Pegasus fix iss... Project progress work #2863: [Coding] HT Pegasus fix issue after on site

Project: THAI INABA FOODS COMPANY LIMITED
Status: In Progress
Start date: 18 Oct 2025
Due date: 29 Oct 2025
Assignee: Taweesak Prumvised
Priority: Normal
THAI ASAHI DENSO CO., LTD - Project progress work #2726: [Installation&On-site support] Project progress work #2726: [Installation&On-site support]

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 29 Oct 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal
THAI ASAHI DENSO CO., LTD - Project progress work #2725: [Coding] Project progress work #2725: [Coding]

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 29 Oct 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal
THAI ASAHI DENSO CO., LTD - Project progress work #2724: [Internal Design] Project progress work #2724: [Internal Design]

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 29 Oct 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal
THAI ASAHI DENSO CO., LTD - Project progress work #2723: [Requirement definition] Project progress work #2723: [Requirement definition]

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 29 Oct 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal
THAI ASAHI DENSO CO., LTD - Parent project #2722: [PJ250068] IoT system for T... Parent project #2722: [PJ250068] IoT system for THAI ASAHI DENSO CO., LTD additional cost

Project: THAI ASAHI DENSO CO., LTD
Status: In Progress
Start date: 29 Oct 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal

30

Keyence (Thailand) Co., Ltd. - Parent project #2750: [PJ250073] License 100% Parent project #2750: [PJ250073] License 100%

Project: Keyence (Thailand) Co., Ltd.
Status: In Progress
Start date: 30 Oct 2025
Due date: 30 Oct 2025
Assignee: Ryo Nozaki
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #2804: [Coding] Delivery Project progress work #2804: [Coding] Delivery

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 30 Oct 2025
Due date: 16 Dec 2025
Assignee: Surat Duangchiaw
Priority: Normal

31

Keyence (Thailand) Co., Ltd. - Parent project #2745: [PJ250072] License 100% Parent project #2745: [PJ250072] License 100%

Project: Keyence (Thailand) Co., Ltd.
Status: In Progress
Start date: 31 Oct 2025
Due date: 31 Oct 2025
Assignee: Ryo Nozaki
Priority: Normal

1

Mitsui Precision Thai Co.,Ltd - Project progress work #2820: [Coding] Print Purchase Ord... Project progress work #2820: [Coding] Print Purchase Order International -WH

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 01 Nov 2025
Due date: 04 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
45

2

3

ShinDengen(Thailand)Co.,Ltd - Project progress work #3303: [Internal Design] Project progress work #3303: [Internal Design]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 03 Nov 2025
Due date: 30 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2984: [Installation&On-site suppo... Project progress work #2984: [Installation&On-site support] Install WebSocket controller Panel

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Nov 2025
Due date: 04 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2968: [Installation&On-site suppo... Project progress work #2968: [Installation&On-site support] Install WebSocket controller Trim

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Nov 2025
Due date: 04 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2967: [Installation&On-site suppo... Project progress work #2967: [Installation&On-site support] Panel

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Nov 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2966: [Installation&On-site suppo... Project progress work #2966: [Installation&On-site support] Trim

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Nov 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
THAI INABA FOODS COMPANY LIMITED - Project progress work #2865: [Installation&On-site suppo... Project progress work #2865: [Installation&On-site support] Go live

Project: THAI INABA FOODS COMPANY LIMITED
Status: In Progress
Start date: 03 Nov 2025
Due date:
Assignee: Taweesak Prumvised
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #1067: [Installation&On-site support] Project progress work #1067: [Installation&On-site support]

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Nov 2025
Due date: 05 Dec 2025
Assignee: Kittisak Isarapongporn
Priority: Normal

4

A.N.I. LOGISTICS, LTD. - Project progress work #2985: [Installation&On-site suppo... Project progress work #2985: [Installation&On-site support] Create Table Master

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 04 Nov 2025
Due date: 04 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2984: [Installation&On-site suppo... Project progress work #2984: [Installation&On-site support] Install WebSocket controller Panel

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Nov 2025
Due date: 04 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2969: [Installation&On-site suppo... Project progress work #2969: [Installation&On-site support] Create Table Master

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 04 Nov 2025
Due date: 04 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2968: [Installation&On-site suppo... Project progress work #2968: [Installation&On-site support] Install WebSocket controller Trim

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Nov 2025
Due date: 04 Nov 2025
Assignee:
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2820: [Coding] Print Purchase Ord... Project progress work #2820: [Coding] Print Purchase Order International -WH

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 01 Nov 2025
Due date: 04 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2970: [Installation&On-site suppo... Project progress work #2970: [Installation&On-site support] Handy Set IP and Install APK 41 devices

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 04 Nov 2025
Due date: 05 Nov 2025
Assignee:
Priority: Normal

5

A.N.I. LOGISTICS, LTD. - Project progress work #2970: [Installation&On-site suppo... Project progress work #2970: [Installation&On-site support] Handy Set IP and Install APK 41 devices

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 04 Nov 2025
Due date: 05 Nov 2025
Assignee:
Priority: Normal
NKT NIPPON KONPO (THAILAND) CO., LTD - Project progress work #1418: [Coding] Check duplicated o... Project progress work #1418: [Coding] Check duplicated on scan

Project: NKT NIPPON KONPO (THAILAND) CO., LTD
Status: New
Start date: 05 Nov 2025
Due date: 05 Nov 2025
Assignee: Taweesak Prumvised
Priority: Normal
NKT NIPPON KONPO (THAILAND) CO., LTD - Project progress work #1413: [Coding] Issue found Project progress work #1413: [Coding] Issue found

Project: NKT NIPPON KONPO (THAILAND) CO., LTD
Status: New
Start date: 05 Nov 2025
Due date: 05 Nov 2025
Assignee: Taweesak Prumvised
Priority: Normal
NKT NIPPON KONPO (THAILAND) CO., LTD - Parent project #827: [PJ240059] Warehouse system... Parent project #827: [PJ240059] Warehouse system for business improvement for NKT

Project: NKT NIPPON KONPO (THAILAND) CO., LTD
Status: In Progress
Start date: 28 Dec 2024
Due date: 05 Nov 2025
Assignee: Kittisak Isarapongporn
Priority: High
A.N.I. LOGISTICS, LTD. - Project progress work #2986: [Installation&On-site suppo... Project progress work #2986: [Installation&On-site support] Handy Set IP and Install APK 22 devices

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 05 Nov 2025
Due date: 06 Nov 2025
Assignee:
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2821: [Coding] IQC Material Page -WH Project progress work #2821: [Coding] IQC Material Page -WH

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 05 Nov 2025
Due date: 06 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal

6

A.N.I. LOGISTICS, LTD. - Project progress work #2987: [Installation&On-site suppo... Project progress work #2987: [Installation&On-site support] Import master Ocr-Qpoint check

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 06 Nov 2025
Due date: 06 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2986: [Installation&On-site suppo... Project progress work #2986: [Installation&On-site support] Handy Set IP and Install APK 22 devices

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 05 Nov 2025
Due date: 06 Nov 2025
Assignee:
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2821: [Coding] IQC Material Page -WH Project progress work #2821: [Coding] IQC Material Page -WH

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 05 Nov 2025
Due date: 06 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2972: [Installation&On-site suppo... Project progress work #2972: [Installation&On-site support] UAT Inner packing Process PC with Handy

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 06 Nov 2025
Due date: 12 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2971: [Installation&On-site suppo... Project progress work #2971: [Installation&On-site support] Import master Ocr-Qpoint check

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 06 Nov 2025
Due date: 07 Nov 2025
Assignee:
Priority: Normal
THAI INABA FOODS COMPANY LIMITED - Project progress work #2867: [Coding] HT Pegasus add re-... Project progress work #2867: [Coding] HT Pegasus add re-check function

Project: THAI INABA FOODS COMPANY LIMITED
Status: New
Start date: 06 Nov 2025
Due date: 08 Nov 2025
Assignee: Taweesak Prumvised
Priority: Normal

7

A.N.I. LOGISTICS, LTD. - Project progress work #2971: [Installation&On-site suppo... Project progress work #2971: [Installation&On-site support] Import master Ocr-Qpoint check

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 06 Nov 2025
Due date: 07 Nov 2025
Assignee:
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2822: [Coding] Import Schedule Ra... Project progress work #2822: [Coding] Import Schedule Raw Material Request (Plan) -WH,PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 07 Nov 2025
Due date: 07 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #2808: [Requirement definition] Project progress work #2808: [Requirement definition]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 07 Nov 2025
Due date: 07 Nov 2025
Assignee: Nattapol Poeam
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #1580: [Coding] BOM Designer and R... Project progress work #1580: [Coding] BOM Designer and Revision control

Project: THAI MATTO NS CO.,LTD.
Status: In Progress
Start date: 16 Oct 2025
Due date: 07 Nov 2025
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
FTS AUTOMOTIVE (THAILAND) CO.,LTD - Parent project #2807: [PJ250079] Traceability sys... Parent project #2807: [PJ250079] Traceability system for WA640

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: In Progress
Start date: 07 Nov 2025
Due date: 16 Jan 2026
Assignee: Ryo Nozaki
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #2803: [Coding] Packing Project progress work #2803: [Coding] Packing

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 07 Nov 2025
Due date: 16 Dec 2025
Assignee: Surat Duangchiaw
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #2802: [Coding] Extruding WIP Return Project progress work #2802: [Coding] Extruding WIP Return

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 07 Nov 2025
Due date: 18 Dec 2025
Assignee: Surat Duangchiaw
Priority: Normal

8

THAI INABA FOODS COMPANY LIMITED - Project progress work #2867: [Coding] HT Pegasus add re-... Project progress work #2867: [Coding] HT Pegasus add re-check function

Project: THAI INABA FOODS COMPANY LIMITED
Status: New
Start date: 06 Nov 2025
Due date: 08 Nov 2025
Assignee: Taweesak Prumvised
Priority: Normal
THAI INABA FOODS COMPANY LIMITED - Parent project #908: [PJ250007] Warehouse Manage... Parent project #908: [PJ250007] Warehouse Management System

Project: THAI INABA FOODS COMPANY LIMITED
Status: In Progress
Start date: 10 Feb 2025
Due date: 08 Nov 2025
Assignee: Kittisak Isarapongporn
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #2884: [Coding] Production Schedul... Project progress work #2884: [Coding] Production Schedule - Backend

Project: THAI MATTO NS CO.,LTD.
Status: In Progress
Start date: 08 Nov 2025
Due date: 18 Nov 2025
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2823: [Coding] Raw Material Reque... Project progress work #2823: [Coding] Raw Material Request Page -WH,PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 08 Nov 2025
Due date: 11 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
46

9

10

FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #3205: [Internal Design] Specifica... Project progress work #3205: [Internal Design] Specification design

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 10 Nov 2025
Due date: 16 Nov 2025
Assignee: Nattapol Poeam
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3142: [Installation&Onsite support] Project progress work #3142: [Installation&Onsite support]

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 10 Nov 2025
Due date: 15 Dec 2025
Assignee: Yutthapong Sricha
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3141: [Installation&On-site suppo... Project progress work #3141: [Installation&On-site support]

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 10 Nov 2025
Due date: 15 Dec 2025
Assignee: Tanong Amnuaypornsri
Priority: Normal
FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #2809: [Internal Design] Project progress work #2809: [Internal Design]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 10 Nov 2025
Due date: 22 Nov 2025
Assignee:
Priority: Normal

11

A.N.I. LOGISTICS, LTD. - Project progress work #2977: [Installation&On-site suppo... Project progress work #2977: [Installation&On-site support] Modify web socket

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 11 Nov 2025
Due date: 11 Nov 2025
Assignee:
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2823: [Coding] Raw Material Reque... Project progress work #2823: [Coding] Raw Material Request Page -WH,PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 08 Nov 2025
Due date: 11 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #3208: [Coding] Mechanical Project progress work #3208: [Coding] Mechanical

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 11 Nov 2025
Due date: 08 Dec 2025
Assignee: Nattawat Hannok
Priority: Normal
FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #3207: [Coding] Electrical Project progress work #3207: [Coding] Electrical

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 11 Nov 2025
Due date: 12 Dec 2025
Assignee: Taweesak Suriyon
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #1706: [Coding] Dashboard report –... Project progress work #1706: [Coding] Dashboard report – Production monitoring

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 11 Nov 2025
Due date: 18 Dec 2025
Assignee: Thiraporn Amornsirinukorh
Priority: Normal

12

A.N.I. LOGISTICS, LTD. - Project progress work #2972: [Installation&On-site suppo... Project progress work #2972: [Installation&On-site support] UAT Inner packing Process PC with Handy

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 06 Nov 2025
Due date: 12 Nov 2025
Assignee:
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2824: [Coding] Print Raw Material... Project progress work #2824: [Coding] Print Raw Material Request -WH,PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 12 Nov 2025
Due date: 13 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #2797: [Coding] Pre-Blend Project progress work #2797: [Coding] Pre-Blend

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 12 Nov 2025
Due date: 18 Dec 2025
Assignee: Surat Duangchiaw
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #2796: [Coding] OM-Mixer Project progress work #2796: [Coding] OM-Mixer

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 12 Nov 2025
Due date: 18 Dec 2025
Assignee: Surat Duangchiaw
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #1681: [Coding] Weighing Project progress work #1681: [Coding] Weighing

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 12 Nov 2025
Due date: 13 Nov 2025
Assignee: Surat Duangchiaw
Priority: Normal

13

Mitsui Precision Thai Co.,Ltd - Project progress work #2824: [Coding] Print Raw Material... Project progress work #2824: [Coding] Print Raw Material Request -WH,PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 12 Nov 2025
Due date: 13 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #1681: [Coding] Weighing Project progress work #1681: [Coding] Weighing

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 12 Nov 2025
Due date: 13 Nov 2025
Assignee: Surat Duangchiaw
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2989: [Installation&On-site suppo... Project progress work #2989: [Installation&On-site support] Modify Label Tag Receive (Test)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2988: [Installation&On-site suppo... Project progress work #2988: [Installation&On-site support] Training User

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2979: [Installation&On-site suppo... Project progress work #2979: [Installation&On-site support] Modify Label Tag Receive (Test)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2978: [Installation&On-site suppo... Project progress work #2978: [Installation&On-site support] Internal Test IV/IM

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2976: [Installation&On-site suppo... Project progress work #2976: [Installation&On-site support] Training User

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2975: [Installation&On-site suppo... Project progress work #2975: [Installation&On-site support] Import master weight data

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2974: [Installation&On-site suppo... Project progress work #2974: [Installation&On-site support] Import master program IM data / UAT IM Process

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2973: [Installation&On-site suppo... Project progress work #2973: [Installation&On-site support] Import master program IV data / UAT IV Process

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal

14

A.N.I. LOGISTICS, LTD. - Project progress work #2989: [Installation&On-site suppo... Project progress work #2989: [Installation&On-site support] Modify Label Tag Receive (Test)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2979: [Installation&On-site suppo... Project progress work #2979: [Installation&On-site support] Modify Label Tag Receive (Test)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2978: [Installation&On-site suppo... Project progress work #2978: [Installation&On-site support] Internal Test IV/IM

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2975: [Installation&On-site suppo... Project progress work #2975: [Installation&On-site support] Import master weight data

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2974: [Installation&On-site suppo... Project progress work #2974: [Installation&On-site support] Import master program IM data / UAT IM Process

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2973: [Installation&On-site suppo... Project progress work #2973: [Installation&On-site support] Import master program IV data / UAT IV Process

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 14 Nov 2025
Assignee:
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2825: [Coding] Import Schedule FG... Project progress work #2825: [Coding] Import Schedule FG Production (Plan) -PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 14 Nov 2025
Due date: 14 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal

15

Mitsui Precision Thai Co.,Ltd - Project progress work #2826: [Coding] Inbound Production... Project progress work #2826: [Coding] Inbound Production Page -PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 15 Nov 2025
Due date: 21 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
47

16

FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #3205: [Internal Design] Specifica... Project progress work #3205: [Internal Design] Specification design

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 10 Nov 2025
Due date: 16 Nov 2025
Assignee: Nattapol Poeam
Priority: Normal

17

NIPPN (Thailand) Co.,Ltd. - Project progress work #2697: [Coding] System integrate Test Project progress work #2697: [Coding] System integrate Test

Project: NIPPN (Thailand) Co.,Ltd.
Status: New
Start date: 22 Oct 2025
Due date: 17 Nov 2025
Assignee: Surasak Atchanawat
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3029: [Internal Design] Hardware ... Project progress work #3029: [Internal Design] Hardware system design

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 17 Nov 2025
Due date: 23 Nov 2025
Assignee: Konlawat Saechee
Priority: Normal
Isuzu Engine Manufacturing Co.,(Thailand) Ltd. - Project progress work #3003: [Internal Design] Project progress work #3003: [Internal Design]

Project: Isuzu Engine Manufacturing Co.,(Thailand) Ltd.
Status: New
Start date: 17 Nov 2025
Due date: 16 Dec 2025
Assignee: Anek Sanohkham
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #2785: [Internal Design] Project progress work #2785: [Internal Design]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 17 Nov 2025
Due date: 14 Dec 2025
Assignee:
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #2784: [Requirement definition] Project progress work #2784: [Requirement definition]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 17 Nov 2025
Due date: 30 Nov 2025
Assignee: Konlawat Saechee
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Parent project #2783: [PJ250078] Operation monito... Parent project #2783: [PJ250078] Operation monitoring system for ShinDengen 100% (DAIICHI JITSUGYO (THAILAND) CO., LTD)

Project: ShinDengen(Thailand)Co.,Ltd
Status: In Progress
Start date: 17 Nov 2025
Due date: 30 Jan 2026
Assignee: Nattapol Poeam
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #1594: [Coding] i-Reporter develop... Project progress work #1594: [Coding] i-Reporter development

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 17 Nov 2025
Due date: 18 Nov 2025
Assignee: Arunwit Isarapongporn
Priority: Normal
THAI ASAHI DENSO CO., LTD - Project progress work #1288: [Installation&On-site suppo... Project progress work #1288: [Installation&On-site support] Software installation

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 17 Nov 2025
Due date: 28 Dec 2025
Assignee:
Priority: Normal

18

THAI MATTO NS CO.,LTD. - Project progress work #2884: [Coding] Production Schedul... Project progress work #2884: [Coding] Production Schedule - Backend

Project: THAI MATTO NS CO.,LTD.
Status: In Progress
Start date: 08 Nov 2025
Due date: 18 Nov 2025
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #1594: [Coding] i-Reporter develop... Project progress work #1594: [Coding] i-Reporter development

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 17 Nov 2025
Due date: 18 Nov 2025
Assignee: Arunwit Isarapongporn
Priority: Normal

19

THAI MATTO NS CO.,LTD. - Project progress work #2997: [Coding] Production Plannin... Project progress work #2997: [Coding] Production Planning (Work Instruction Sheet)

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 19 Nov 2025
Due date: 22 Nov 2025
Assignee: Thiraporn Amornsirinukorh
Priority: Normal

20

21

Mitsui Precision Thai Co.,Ltd - Project progress work #2826: [Coding] Inbound Production... Project progress work #2826: [Coding] Inbound Production Page -PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 15 Nov 2025
Due date: 21 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
THAI INABA FOODS COMPANY LIMITED - Project progress work #2878: [installation&On-site suppo... Project progress work #2878: [installation&On-site support] Support Onsite

Project: THAI INABA FOODS COMPANY LIMITED
Status: In Progress
Start date: 21 Nov 2025
Due date:
Assignee: Nattaporn Chaiya
Priority: Normal

22

FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #3206: [Internal Design] Backup so... Project progress work #3206: [Internal Design] Backup software / Parameter / HMI Machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 22 Nov 2025
Due date: 22 Nov 2025
Assignee: Nattapong Sukcharoen
Priority: Normal
Isuzu Engine Manufacturing Co.,(Thailand) Ltd. - Project progress work #3002: [Requirement definition] Project progress work #3002: [Requirement definition]

Project: Isuzu Engine Manufacturing Co.,(Thailand) Ltd.
Status: New
Start date: 24 Oct 2025
Due date: 22 Nov 2025
Assignee: Anek Sanohkham
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #2997: [Coding] Production Plannin... Project progress work #2997: [Coding] Production Planning (Work Instruction Sheet)

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 19 Nov 2025
Due date: 22 Nov 2025
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2990: Installation&On-site suppor... Project progress work #2990: Installation&On-site support] Install Hardware weight scale (1 Set)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 22 Nov 2025
Due date: 22 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2980: [Installation&On-site suppo... Project progress work #2980: [Installation&On-site support] Install Hardware weight scale (1 Set)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 22 Nov 2025
Due date: 22 Nov 2025
Assignee:
Priority: Normal
FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #2809: [Internal Design] Project progress work #2809: [Internal Design]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 10 Nov 2025
Due date: 22 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2982: [Installation&On-site suppo... Project progress work #2982: [Installation&On-site support] Install Hardware weight scale (9 Set)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 22 Nov 2025
Due date: 30 Nov 2025
Assignee:
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2827: [Coding] Outbound Material ... Project progress work #2827: [Coding] Outbound Material Usage Page -PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 22 Nov 2025
Due date: 26 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
48

23

ShinDengen(Thailand)Co.,Ltd - Project progress work #3029: [Internal Design] Hardware ... Project progress work #3029: [Internal Design] Hardware system design

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 17 Nov 2025
Due date: 23 Nov 2025
Assignee: Konlawat Saechee
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3305: [Installation&On-site suppo... Project progress work #3305: [Installation&On-site support]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 23 Nov 2025
Due date: 30 Jan 2026
Assignee:
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3031: [Installation&On-site suppo... Project progress work #3031: [Installation&On-site support] Software Machine data collection & Configuration Line 2

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 23 Nov 2025
Due date: 24 Nov 2025
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2991: [Installation&On-site suppo... Project progress work #2991: [Installation&On-site support] UAT of weight scale (1 Set)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 23 Nov 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2981: [Installation&On-site suppo... Project progress work #2981: [Installation&On-site support] UAT of weight scale (1 Set)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 23 Nov 2025
Due date: 28 Nov 2025
Assignee:
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #2787: [Installation&On-site support] Project progress work #2787: [Installation&On-site support]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 23 Nov 2025
Due date: 30 Jan 2026
Assignee:
Priority: Normal

24

ShinDengen(Thailand)Co.,Ltd - Project progress work #3031: [Installation&On-site suppo... Project progress work #3031: [Installation&On-site support] Software Machine data collection & Configuration Line 2

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 23 Nov 2025
Due date: 24 Nov 2025
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
NIPPN (Thailand) Co.,Ltd. - Project progress work #3182: [Installation&IOn-site supp... Project progress work #3182: [Installation&IOn-site support]

Project: NIPPN (Thailand) Co.,Ltd.
Status: New
Start date: 24 Nov 2025
Due date: 12 Jan 2026
Assignee: Surasak Atchanawat
Priority: Normal
NIPPN (Thailand) Co.,Ltd. - Project progress work #3181: [Installation&On-site support] Project progress work #3181: [Installation&On-site support]

Project: NIPPN (Thailand) Co.,Ltd.
Status: New
Start date: 24 Nov 2025
Due date: 12 Jan 2026
Assignee: Supatnchai Hempolchom
Priority: Normal
NIPPN (Thailand) Co.,Ltd. - Project progress work #3180: [Installation&On-site support] Project progress work #3180: [Installation&On-site support]

Project: NIPPN (Thailand) Co.,Ltd.
Status: New
Start date: 24 Nov 2025
Due date: 12 Jan 2026
Assignee: Nattikorn Srisadet
Priority: Normal
Nidec Techno Motor (Thailand) Co.,Ltd. - Parent project #2992: [PJ250083] Handy terminal app Parent project #2992: [PJ250083] Handy terminal app

Project: Nidec Techno Motor (Thailand) Co.,Ltd.
Status: In Progress
Start date: 24 Nov 2025
Due date: 27 Nov 2025
Assignee: Soraya Norasing
Priority: Normal
THAI ASAHI DENSO CO., LTD - Project progress work #2949: [Installation&On-site suppo... Project progress work #2949: [Installation&On-site support] Utility monitoring

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 24 Nov 2025
Due date: 25 Nov 2025
Assignee: Panupong Raksakit
Priority: Normal
THAI ASAHI DENSO CO., LTD - Project progress work #2933: [Installation&On-site suppo... Project progress work #2933: [Installation&On-site support] SIT Utility system

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 24 Nov 2025
Due date: 28 Dec 2025
Assignee:
Priority: Normal
NIPPN (Thailand) Co.,Ltd. - Project progress work #1629: [Installation&On-site support] Project progress work #1629: [Installation&On-site support]

Project: NIPPN (Thailand) Co.,Ltd.
Status: New
Start date: 24 Nov 2025
Due date: 12 Jan 2026
Assignee:
Priority: Normal

25

THAI ASAHI DENSO CO., LTD - Project progress work #2949: [Installation&On-site suppo... Project progress work #2949: [Installation&On-site support] Utility monitoring

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 24 Nov 2025
Due date: 25 Nov 2025
Assignee: Panupong Raksakit
Priority: Normal
Nidec Techno Motor (Thailand) Co.,Ltd. - Project progress work #3012: [Coding] Stocktaking Project progress work #3012: [Coding] Stocktaking

Project: Nidec Techno Motor (Thailand) Co.,Ltd.
Status: New
Start date: 25 Nov 2025
Due date: 26 Nov 2025
Assignee: Watcharin Arnnok
Priority: Normal
Okaya (Thailand) Co., Ltd. (Bangna Branch) - Parent project #3001: [PJ250087] Product Distribu... Parent project #3001: [PJ250087] Product Distribution System - CPF

Project: Okaya (Thailand) Co., Ltd. (Bangna Branch)
Status: In Progress
Start date: 25 Nov 2025
Due date:
Assignee: Anek Sanohkham
Priority: Normal
AH BRAKE (THAILAND) CO., LTD. - Parent project #2996: [PJ250088] MOC IoT system f... Parent project #2996: [PJ250088] MOC IoT system for wiring work AHT

Project: AH BRAKE (THAILAND) CO., LTD.
Status: In Progress
Start date: 25 Nov 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal

26

Nidec Techno Motor (Thailand) Co.,Ltd. - Project progress work #3012: [Coding] Stocktaking Project progress work #3012: [Coding] Stocktaking

Project: Nidec Techno Motor (Thailand) Co.,Ltd.
Status: New
Start date: 25 Nov 2025
Due date: 26 Nov 2025
Assignee: Watcharin Arnnok
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2827: [Coding] Outbound Material ... Project progress work #2827: [Coding] Outbound Material Usage Page -PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 22 Nov 2025
Due date: 26 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3304: [Coding] Project progress work #3304: [Coding]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 26 Nov 2025
Due date: 05 Jan 2026
Assignee:
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #3162: [Coding] Work Outbound Project progress work #3162: [Coding] Work Outbound

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 26 Nov 2025
Due date: 01 Dec 2025
Assignee: Soraya Norasing
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #3153: [Coding] Project progress work #3153: [Coding]

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 26 Nov 2025
Due date: 22 Dec 2025
Assignee: Soraya Norasing
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Parent project #3044: [PJ250095] Label Parent project #3044: [PJ250095] Label

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: In Progress
Start date: 26 Nov 2025
Due date:
Assignee: Ryo Nozaki
Priority: Normal
Aisan Corporation Asia Pacific Limited. - Parent project #3041: [PJ250092] Hardware unit sets Parent project #3041: [PJ250092] Hardware unit sets

Project: Aisan Corporation Asia Pacific Limited.
Status: In Progress
Start date: 26 Nov 2025
Due date:
Assignee: Ryosuke Hiroki
Priority: Normal
Maersk Logistics & Services (Thailand) Co., Ltd. - Parent project #3040: [PJ250091] Handy terminal Parent project #3040: [PJ250091] Handy terminal

Project: Maersk Logistics & Services (Thailand) Co., Ltd.
Status: In Progress
Start date: 26 Nov 2025
Due date:
Assignee:
Priority: Normal
THAI ASAHI DENSO CO., LTD - Project progress work #2950: [Installation&On-site suppo... Project progress work #2950: [Installation&On-site support] Utility data monitoring

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 26 Nov 2025
Due date: 27 Nov 2025
Assignee: Panupong Raksakit
Priority: Normal

27

Nidec Techno Motor (Thailand) Co.,Ltd. - Project progress work #3014: [Installation&On-site suppo... Project progress work #3014: [Installation&On-site support] Software installation 2 (Stocktaking)

Project: Nidec Techno Motor (Thailand) Co.,Ltd.
Status: New
Start date: 27 Nov 2025
Due date: 27 Nov 2025
Assignee: Watcharin Arnnok
Priority: Normal
Nidec Techno Motor (Thailand) Co.,Ltd. - Parent project #2992: [PJ250083] Handy terminal app Parent project #2992: [PJ250083] Handy terminal app

Project: Nidec Techno Motor (Thailand) Co.,Ltd.
Status: In Progress
Start date: 24 Nov 2025
Due date: 27 Nov 2025
Assignee: Soraya Norasing
Priority: Normal
THAI ASAHI DENSO CO., LTD - Project progress work #2950: [Installation&On-site suppo... Project progress work #2950: [Installation&On-site support] Utility data monitoring

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 26 Nov 2025
Due date: 27 Nov 2025
Assignee: Panupong Raksakit
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #3155: [Coding] Inbound Schedule (... Project progress work #3155: [Coding] Inbound Schedule (No rank)

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 03 Dec 2025
Assignee: Soraya Norasing
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3027: [Coding] Addition time to u... Project progress work #3027: [Coding] Addition time to used and auto end

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3026: [Coding] Addition plan NO O... Project progress work #3026: [Coding] Addition plan NO OT, Plan Machine Stop, Other

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3025: [Coding] Add Import/Export ... Project progress work #3025: [Coding] Add Import/Export to File CSV

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3024: [Coding] Change "OEE, Plan ... Project progress work #3024: [Coding] Change "OEE, Plan delay time; Plan shutdown" lot by lot day per time

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3023: [Coding] Notification OEE b... Project progress work #3023: [Coding] Notification OEE by E-Mail or Smartwatch

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3022: [Coding] Manual to Edit Act... Project progress work #3022: [Coding] Manual to Edit Actual (Quantity and Color)

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3021: [Coding] Change color Gray ... Project progress work #3021: [Coding] Change color Gray for Breakdown Actual

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3020: [Coding] Add target setting Project progress work #3020: [Coding] Add target setting

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3019: [Coding] Add Color OEE (Red... Project progress work #3019: [Coding] Add Color OEE (Red, Green)

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3018: [Coding] Addition detail "P... Project progress work #3018: [Coding] Addition detail "Plan delay, Planned shutdown overtime, OEE" Product by product

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3017: [Coding] Addition estimate ... Project progress work #3017: [Coding] Addition estimate time follow plan

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3016: [Coding] Add Scale Project progress work #3016: [Coding] Add Scale

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee: Thiraporn Amornsirinukorh
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2828: [Coding] IQC FG Page -PD Project progress work #2828: [Coding] IQC FG Page -PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 30 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #2786: [Coding] Project progress work #2786: [Coding]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 05 Jan 2026
Assignee:
Priority: Normal

28

A.N.I. LOGISTICS, LTD. - Project progress work #2981: [Installation&On-site suppo... Project progress work #2981: [Installation&On-site support] UAT of weight scale (1 Set)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 23 Nov 2025
Due date: 28 Nov 2025
Assignee:
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #1596: [Coding] Software test Project progress work #1596: [Coding] Software test

Project: THAI MATTO NS CO.,LTD.
Status: In Progress
Start date: 01 Aug 2025
Due date: 28 Nov 2025
Assignee: Kittisak Isarapongporn
Priority: Normal

29

49

30

ShinDengen(Thailand)Co.,Ltd - Project progress work #3303: [Internal Design] Project progress work #3303: [Internal Design]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 03 Nov 2025
Due date: 30 Nov 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2982: [Installation&On-site suppo... Project progress work #2982: [Installation&On-site support] Install Hardware weight scale (9 Set)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 22 Nov 2025
Due date: 30 Nov 2025
Assignee:
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #2828: [Coding] IQC FG Page -PD Project progress work #2828: [Coding] IQC FG Page -PD

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 30 Nov 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #2784: [Requirement definition] Project progress work #2784: [Requirement definition]

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 17 Nov 2025
Due date: 30 Nov 2025
Assignee: Konlawat Saechee
Priority: Normal

1

Mitsui Precision Thai Co.,Ltd - Project progress work #3162: [Coding] Work Outbound Project progress work #3162: [Coding] Work Outbound

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 26 Nov 2025
Due date: 01 Dec 2025
Assignee: Soraya Norasing
Priority: Normal
FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #1283: [Installation&On-site support] Project progress work #1283: [Installation&On-site support]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 06 Sep 2025
Due date: 01 Dec 2025
Assignee:
Priority: Normal
FTS AUTOMOTIVE (THAILAND) CO.,LTD - Parent project #1279: [PJ250040] FTS TH Blow Mold... Parent project #1279: [PJ250040] FTS TH Blow Mold#2 IoT system 100%

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: In Progress
Start date: 13 Aug 2025
Due date: 01 Dec 2025
Assignee: Nattapol Poeam
Priority: Normal
FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #3185: [Coding] Development Project progress work #3185: [Coding] Development

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 01 Dec 2025
Due date: 20 Dec 2025
Assignee: Sermsak Prowee
Priority: Normal
ShinDengen(Thailand)Co.,Ltd - Project progress work #3028: [Internal Design] Software ... Project progress work #3028: [Internal Design] Software System Design

Project: ShinDengen(Thailand)Co.,Ltd
Status: New
Start date: 01 Dec 2025
Due date: 14 Dec 2025
Assignee:
Priority: Normal
Isuzu Engine Manufacturing Co.,(Thailand) Ltd. - Project progress work #3004: [Coding] Project progress work #3004: [Coding]

Project: Isuzu Engine Manufacturing Co.,(Thailand) Ltd.
Status: New
Start date: 01 Dec 2025
Due date: 14 Jan 2026
Assignee: Anek Sanohkham
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2983: [Installation&On-site suppo... Project progress work #2983: [Installation&On-site support] UAT of weight scale (9 Set)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 01 Dec 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
THAI ASAHI DENSO CO., LTD - Project progress work #2934: [Installation&On-site suppo... Project progress work #2934: [Installation&On-site support] UAT

Project: THAI ASAHI DENSO CO., LTD
Status: New
Start date: 01 Dec 2025
Due date: 26 Dec 2025
Assignee:
Priority: Normal
AIKAI LOGISTICS (THAILAND) CO., LTD - Project progress work #2901: [Coding] Software development Project progress work #2901: [Coding] Software development

Project: AIKAI LOGISTICS (THAILAND) CO., LTD
Status: New
Start date: 01 Dec 2025
Due date: 08 Feb 2026
Assignee:
Priority: Normal
AIKAI LOGISTICS (THAILAND) CO., LTD - Project progress work #2899: [Internal Design] Software ... Project progress work #2899: [Internal Design] Software system design

Project: AIKAI LOGISTICS (THAILAND) CO., LTD
Status: New
Start date: 01 Dec 2025
Due date: 29 Jan 2026
Assignee:
Priority: Normal
FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #2810: [Coding] Master PLC Project progress work #2810: [Coding] Master PLC

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 01 Dec 2025
Due date: 11 Jan 2026
Assignee: Sermsak Prowee
Priority: Normal
AIKAI LOGISTICS (THAILAND) CO., LTD - Project progress work #1035: [Coding] Project progress work #1035: [Coding]

Project: AIKAI LOGISTICS (THAILAND) CO., LTD
Status: New
Start date: 01 Dec 2025
Due date: 08 Feb 2026
Assignee: Anek Sanohkham
Priority: Normal
AIKAI LOGISTICS (THAILAND) CO., LTD - Project progress work #1034: [Internal Design] Project progress work #1034: [Internal Design]

Project: AIKAI LOGISTICS (THAILAND) CO., LTD
Status: New
Start date: 01 Dec 2025
Due date: 29 Jan 2026
Assignee: Anek Sanohkham
Priority: Normal

2

A.N.I. LOGISTICS, LTD. - Project progress work #3091: [Coding] Manual Inbound Project progress work #3091: [Coding] Manual Inbound

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 02 Dec 2025
Due date: 02 Dec 2025
Assignee: Tanong Amnuaypornsri
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3054: [Coding] Handy UI Script Project progress work #3054: [Coding] Handy UI Script

Project: A.N.I. LOGISTICS, LTD.
Status: In Progress
Start date: 01 Oct 2025
Due date: 02 Dec 2025
Assignee: Tanong Amnuaypornsri
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #3163: [Coding] Delivery Outbound Project progress work #3163: [Coding] Delivery Outbound

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 02 Dec 2025
Due date: 04 Dec 2025
Assignee: Soraya Norasing
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3138: [Coding] Trouble Report Project progress work #3138: [Coding] Trouble Report

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 02 Dec 2025
Due date: 04 Dec 2025
Assignee: Yutthapong Sricha
Priority: Normal

3

Mitsui Precision Thai Co.,Ltd - Project progress work #3155: [Coding] Inbound Schedule (... Project progress work #3155: [Coding] Inbound Schedule (No rank)

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 27 Nov 2025
Due date: 03 Dec 2025
Assignee: Soraya Norasing
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3092: [Coding] Manual Outbound Project progress work #3092: [Coding] Manual Outbound

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Dec 2025
Due date: 03 Dec 2025
Assignee: Tanong Amnuaypornsri
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3072: [Coding] WS api and fronten... Project progress work #3072: [Coding] WS api and frontend script fixing

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 01 Oct 2025
Due date: 03 Dec 2025
Assignee:
Priority: Normal

4

Mitsui Precision Thai Co.,Ltd - Project progress work #3163: [Coding] Delivery Outbound Project progress work #3163: [Coding] Delivery Outbound

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 02 Dec 2025
Due date: 04 Dec 2025
Assignee: Soraya Norasing
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3138: [Coding] Trouble Report Project progress work #3138: [Coding] Trouble Report

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 02 Dec 2025
Due date: 04 Dec 2025
Assignee: Yutthapong Sricha
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3135: [Coding] Reprint Case mark ... Project progress work #3135: [Coding] Reprint Case mark document

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 04 Dec 2025
Due date: 04 Dec 2025
Assignee: Yutthapong Sricha
Priority: Normal
Mitsui Precision Thai Co.,Ltd - Project progress work #3156: [Coding] Inbound Schedule (... Project progress work #3156: [Coding] Inbound Schedule (Rank A B)

Project: Mitsui Precision Thai Co.,Ltd
Status: New
Start date: 04 Dec 2025
Due date: 09 Dec 2025
Assignee: Soraya Norasing
Priority: Normal

5

A.N.I. LOGISTICS, LTD. - Project progress work #3101: [Coding] Web Development Project progress work #3101: [Coding] Web Development

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 26 Jun 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2991: [Installation&On-site suppo... Project progress work #2991: [Installation&On-site support] UAT of weight scale (1 Set)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 23 Nov 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2988: [Installation&On-site suppo... Project progress work #2988: [Installation&On-site support] Training User

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2983: [Installation&On-site suppo... Project progress work #2983: [Installation&On-site support] UAT of weight scale (9 Set)

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 01 Dec 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2976: [Installation&On-site suppo... Project progress work #2976: [Installation&On-site support] Training User

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 13 Nov 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2967: [Installation&On-site suppo... Project progress work #2967: [Installation&On-site support] Panel

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Nov 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #2966: [Installation&On-site suppo... Project progress work #2966: [Installation&On-site support] Trim

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Nov 2025
Due date: 05 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #1067: [Installation&On-site support] Project progress work #1067: [Installation&On-site support]

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 03 Nov 2025
Due date: 05 Dec 2025
Assignee: Kittisak Isarapongporn
Priority: Normal
A.N.I. LOGISTICS, LTD. - Parent project #1058: [PJ250037] CKD system Phase 06 Parent project #1058: [PJ250037] CKD system Phase 06

Project: A.N.I. LOGISTICS, LTD.
Status: In Progress
Start date: 01 Aug 2025
Due date: 05 Dec 2025
Assignee: Kittisak Isarapongporn
Priority: Normal

6

issue beginning this day issue ending this day issue beginning and ending this day