Added by Siriwilai Chaiwattanaphon 21 days ago. Updated 9 days ago.
Files
Subtasks 11 (8 open — 3 closed)
1 Mechanical cost1.1 Sensor Jig Stand 2 set
2 Electrical cost2.1 Control Box 2 set
3 Mechanical labore cost3.1 Drawing Design3.2 Assembly and Test3.3 Installation, Test3.4 Transportation
4 Electrical labore cost4.1 Assembly + Wiring4.2 AutoID Configuration
Also available in: Atom PDF