25 Dec 2025

11:17 THAI ASAHI DENSO CO., LTD. Project progress work #2932 (Closed): [Installation&On-site support] SIT Production system
Siriwilai Chaiwattanaphon
09:37 THAI ASAHI DENSO CO., LTD. Project progress work #2948 (Closed): [Installation&On-site support] Calling system
Siriwilai Chaiwattanaphon
09:37 THAI ASAHI DENSO CO., LTD. Project progress work #2947 (Closed): [Installation&On-site support] Alarm monitoring
Siriwilai Chaiwattanaphon
09:36 THAI ASAHI DENSO CO., LTD. Project progress work #2950 (Closed): [Installation&On-site support] Utility data monitoring
Siriwilai Chaiwattanaphon
09:36 THAI ASAHI DENSO CO., LTD. Project progress work #2949 (Closed): [Installation&On-site support] Utility monitoring
Siriwilai Chaiwattanaphon
09:35 THAI ASAHI DENSO CO., LTD. Project progress work #1287 (Closed): [Coding] Web application
Siriwilai Chaiwattanaphon
09:35 THAI ASAHI DENSO CO., LTD. Project progress work #3184 (Closed): [Coding] Update line name and map lamp in 3D Production Monitoring
Siriwilai Chaiwattanaphon

24 Dec 2025

17:28 A.N.I. LOGISTICS, LTD. Project progress work #3349: [Installation&On-site support] UAT/Fix Issue/Go live
today
-UAT Test Weight scale process
tomorrow
-UAT Test Weight scale process
Priroj Neamjarn
17:11 THAI MATTO NS CO., LTD. Project progress work #3392 (New): [Coding] Image master for stamping
Siriwilai Chaiwattanaphon
17:08 THAI MATTO NS CO., LTD. Project progress work #3391 (Closed): [Coding] PO Material (Manual)
Siriwilai Chaiwattanaphon
15:20 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Parent project #3390: [PJ2500107] Traceability system for NTMT RFID concept
Traceability system for NTMT RFID concept
1. Hardware
1.1 RFID Reader units SID-RDT-U816-SRIP Q'ty 4 sets
1.2 R...
Siriwilai Chaiwattanaphon
15:10 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Parent project #3390 (In Progress): [PJ2500107] Traceability system for NTMT RFID concept
Siriwilai Chaiwattanaphon
14:54 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1006 (Closed): [Change requirement] Meeting get new requirement
Siriwilai Chaiwattanaphon
14:54 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1006 (Interruption): [Change requirement] Meeting get new requirement
Siriwilai Chaiwattanaphon
14:53 YAMATO ELECTRIC (THAILAND) CO., LTD. Parent project #3389 (Closed): [PJ2500106] Label for WS Printer
LABEL FOR WS PRINTER SIZE 85*55 MM 560PCS/ROLL Q'TY 30 SET Siriwilai Chaiwattanaphon
13:52 THAI MATTO NS CO., LTD. Project progress work #3388 (New): [Installation&On-site support] WS controller installation
Siriwilai Chaiwattanaphon
13:49 THAI MATTO NS CO., LTD. Project progress work #3387 (New): [Coding] Process control
Siriwilai Chaiwattanaphon
13:47 THAI MATTO NS CO., LTD. Project progress work #3386 (New): [Coding] WH/Picking Plan(Others) FIX
Siriwilai Chaiwattanaphon
13:46 THAI MATTO NS CO., LTD. Project progress work #3385 (New): [Coding] WH/Picking Plan(Packaging) FIX
Siriwilai Chaiwattanaphon
13:46 THAI MATTO NS CO., LTD. Project progress work #3384 (New): [Coding] WH/Picking Plan(Pigment/Additive) FIX
Siriwilai Chaiwattanaphon
13:45 THAI MATTO NS CO., LTD. Project progress work #3383 (New): [Coding] WH/Picking Plan(Resin) FIX
Siriwilai Chaiwattanaphon
13:44 THAI MATTO NS CO., LTD. Project progress work #3382 (New): [Coding] WH/RM Receive (OCR)
Siriwilai Chaiwattanaphon
13:31 THAI MATTO NS CO., LTD. Project progress work #3381 (New): [Coding] Color matching Backend
Siriwilai Chaiwattanaphon
13:30 THAI MATTO NS CO., LTD. Project progress work #3380 (New): [Coding] Color matching Frontend
Siriwilai Chaiwattanaphon
13:17 THAI MATTO NS CO., LTD. Project progress work #3284 (Closed): [Coding] Quotation Master
Siriwilai Chaiwattanaphon
13:15 THAI MATTO NS CO., LTD. Project progress work #3283 (Closed): [Coding] PO Merchandize Order FIX
Siriwilai Chaiwattanaphon
13:15 THAI MATTO NS CO., LTD. Project progress work #3282 (Closed): [Coding] PO Stock Order FIX
Siriwilai Chaiwattanaphon
13:15 THAI MATTO NS CO., LTD. Project progress work #3281 (Closed): [Coding] PO Order FIX
Siriwilai Chaiwattanaphon
13:15 THAI MATTO NS CO., LTD. Project progress work #3379 (New): [Coding] Production Planning (Work Instruction Sheet) FIX Image
Siriwilai Chaiwattanaphon
13:12 THAI MATTO NS CO., LTD. Project progress work #3378 (New): [Coding] Outbound Schedule Detail FIX
Siriwilai Chaiwattanaphon
13:12 THAI MATTO NS CO., LTD. Project progress work #3377 (New): [Codin] Inbound Schedule Detail Fix
Siriwilai Chaiwattanaphon
13:10 THAI MATTO NS CO., LTD. Project progress work #1537 (In Progress): [Coding] Outbound
Siriwilai Chaiwattanaphon
13:10 THAI MATTO NS CO., LTD. Project progress work #1530 (In Progress): [Coding] Inbound
Siriwilai Chaiwattanaphon

23 Dec 2025

16:56 A.N.I. LOGISTICS, LTD. Project progress work #3349: [Installation&On-site support] UAT/Fix Issue/Go live
today
-fix issue weight scale process
tomorrow
-Install update apk on site
Priroj Neamjarn
16:29 A.N.I. LOGISTICS, LTD. Project progress work #3371 (Closed): [Installation&On-site support] Modification: Inner packing & Q-Gate take photo(PANEL)
Siriwilai Chaiwattanaphon
16:04 A.N.I. LOGISTICS, LTD. Project progress work #3371 (Closed): [Installation&On-site support] Modification: Inner packing & Q-Gate take photo(PANEL)
Siriwilai Chaiwattanaphon
16:29 A.N.I. LOGISTICS, LTD. Project progress work #3369 (Closed): [Installation&On-site support] Modification: Inner packing multiple device scan add issue (PANEL)
Siriwilai Chaiwattanaphon
16:01 A.N.I. LOGISTICS, LTD. Project progress work #3369 (Closed): [Installation&On-site support] Modification: Inner packing multiple device scan add issue (PANEL)
Siriwilai Chaiwattanaphon
16:29 A.N.I. LOGISTICS, LTD. Project progress work #3370 (Closed): [Installation&On-site support]
Siriwilai Chaiwattanaphon
16:02 A.N.I. LOGISTICS, LTD. Project progress work #3370 (Closed): [Installation&On-site support]
Siriwilai Chaiwattanaphon
16:28 A.N.I. LOGISTICS, LTD. Project progress work #3368 (Closed): [Installation&On-site sdupport] Modification: Inner packing multiple device scan(PANEL)
Siriwilai Chaiwattanaphon
16:00 A.N.I. LOGISTICS, LTD. Project progress work #3368 (Closed): [Installation&On-site sdupport] Modification: Inner packing multiple device scan(PANEL)
Siriwilai Chaiwattanaphon
16:28 A.N.I. LOGISTICS, LTD. Project progress work #3356 (Closed): [Installation&On-site support] Weight scale installation & wiring
Siriwilai Chaiwattanaphon
14:14 A.N.I. LOGISTICS, LTD. Project progress work #3356 (Closed): [Installation&On-site support] Weight scale installation & wiring
Siriwilai Chaiwattanaphon
16:28 A.N.I. LOGISTICS, LTD. Project progress work #3357 (Closed): [Installation&On-site support] Weight scale installation 2 units
Siriwilai Chaiwattanaphon
14:15 A.N.I. LOGISTICS, LTD. Project progress work #3357 (Closed): [Installation&On-site support] Weight scale installation 2 units
Siriwilai Chaiwattanaphon
16:28 A.N.I. LOGISTICS, LTD. Project progress work #3367 (Closed): [Installation&Onsite support] Modification: Switch table
Siriwilai Chaiwattanaphon
16:00 A.N.I. LOGISTICS, LTD. Project progress work #3367 (Closed): [Installation&Onsite support] Modification: Switch table
Siriwilai Chaiwattanaphon
16:17 A.N.I. LOGISTICS, LTD. Project progress work #3376 (New): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
16:07 A.N.I. LOGISTICS, LTD. Project progress work #3375 (New): [Installation&Onsite support] Monitoring program install
Siriwilai Chaiwattanaphon
16:06 A.N.I. LOGISTICS, LTD. Project progress work #3374 (New): [Installation&Onsite support] On-line program modification
Siriwilai Chaiwattanaphon
16:05 A.N.I. LOGISTICS, LTD. Project progress work #3373 (New): [Installation&On-site support] Pre-Go live for 1line
Siriwilai Chaiwattanaphon
16:04 A.N.I. LOGISTICS, LTD. Project progress work #3372 (New): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
15:59 A.N.I. LOGISTICS, LTD. Project progress work #3366 (New): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
14:27 A.N.I. LOGISTICS, LTD. Project progress work #3365 (New): [Installation&On-site support] User Testing & Trial (WC)
Siriwilai Chaiwattanaphon
14:21 A.N.I. LOGISTICS, LTD. Project progress work #3363 (Closed): [Installation&On-site support] SD card installation 7units testing
Siriwilai Chaiwattanaphon
14:18 A.N.I. LOGISTICS, LTD. Project progress work #3363 (Closed): [Installation&On-site support] SD card installation 7units testing
Siriwilai Chaiwattanaphon
14:21 A.N.I. LOGISTICS, LTD. Project progress work #2991 (Closed): [Installation&On-site support] UAT of weight scale (1 Set)
Siriwilai Chaiwattanaphon
14:07 A.N.I. LOGISTICS, LTD. Project progress work #2991 (In Progress): [Installation&On-site support] UAT of weight scale (1 Set)
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2991 (Closed): [Installation&On-site support] UAT of weight scale (1 Set)
Siriwilai Chaiwattanaphon
14:20 A.N.I. LOGISTICS, LTD. Project progress work #2975 (Closed): [Installation&On-site support] Import master weight data
Siriwilai Chaiwattanaphon
14:04 A.N.I. LOGISTICS, LTD. Project progress work #2975 (In Progress): [Installation&On-site support] Import master weight data
Siriwilai Chaiwattanaphon
13:35 A.N.I. LOGISTICS, LTD. Project progress work #2975 (Closed): [Installation&On-site support] Import master weight data
Siriwilai Chaiwattanaphon
14:20 A.N.I. LOGISTICS, LTD. Project progress work #2967 (In Progress): [Installation&On-site support] Panel
Siriwilai Chaiwattanaphon
14:20 A.N.I. LOGISTICS, LTD. Project progress work #2967 (Close request): [Installation&On-site support] Panel
Siriwilai Chaiwattanaphon
14:20 A.N.I. LOGISTICS, LTD. Project progress work #2983 (Closed): [Installation&On-site support] UAT of weight scale (9 Set)
Siriwilai Chaiwattanaphon
14:06 A.N.I. LOGISTICS, LTD. Project progress work #2983 (In Progress): [Installation&On-site support] UAT of weight scale (9 Set)
Siriwilai Chaiwattanaphon
13:38 A.N.I. LOGISTICS, LTD. Project progress work #2983 (Closed): [Installation&On-site support] UAT of weight scale (9 Set)
Siriwilai Chaiwattanaphon
14:19 A.N.I. LOGISTICS, LTD. Project progress work #3362 (Closed): [Installation&On-site support] SD card installation 7units
Siriwilai Chaiwattanaphon
14:18 A.N.I. LOGISTICS, LTD. Project progress work #3362 (Closed): [Installation&On-site support] SD card installation 7units
Siriwilai Chaiwattanaphon
14:19 A.N.I. LOGISTICS, LTD. Project progress work #3360 (Closed): [Installation&On-site support] Weight scale installation 7 units
Siriwilai Chaiwattanaphon
14:17 A.N.I. LOGISTICS, LTD. Project progress work #3360 (Closed): [Installation&On-site support] Weight scale installation 7 units
Siriwilai Chaiwattanaphon
14:19 A.N.I. LOGISTICS, LTD. Project progress work #3364 (New): [Installation&On-site support] SD card installation 8units
Siriwilai Chaiwattanaphon
14:17 A.N.I. LOGISTICS, LTD. Project progress work #3361 (New): [Installation&On-site support] Weight scale config&testing 7 units
Siriwilai Chaiwattanaphon
14:16 A.N.I. LOGISTICS, LTD. Project progress work #3359 (New): [Installation&On-site support] Weight scale config&testing 2 units
Siriwilai Chaiwattanaphon
14:15 A.N.I. LOGISTICS, LTD. Project progress work #3358 (New): [Installation&On-site support] Weight scale config&testing 2 units
Siriwilai Chaiwattanaphon
14:13 A.N.I. LOGISTICS, LTD. Project progress work #3355 (New): [Installation&On-site support] User Testing & Trial
Siriwilai Chaiwattanaphon
14:13 A.N.I. LOGISTICS, LTD. Project progress work #3354 (New): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2990 (Closed): Installation&On-site support] Install Hardware weight scale (1 Set)
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2989 (Closed): [Installation&On-site support] Modify Label Tag Receive (Test)
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2988 (Closed): [Installation&On-site support] Training User
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2987 (Closed): [Installation&On-site support] Import master Ocr-Qpoint check
Siriwilai Chaiwattanaphon
13:44 A.N.I. LOGISTICS, LTD. Project progress work #2986 (Closed): [Installation&On-site support] Handy Set IP and Install APK 22 devices
Siriwilai Chaiwattanaphon
13:39 A.N.I. LOGISTICS, LTD. Project progress work #2985 (Closed): [Installation&On-site support] Create Table Master
Siriwilai Chaiwattanaphon
13:38 A.N.I. LOGISTICS, LTD. Project progress work #2984 (Closed): [Installation&On-site support] Install WebSocket controller Panel
Siriwilai Chaiwattanaphon
13:38 A.N.I. LOGISTICS, LTD. Project progress work #2982 (Closed): [Installation&On-site support] Install Hardware weight scale (9 Set)
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2981 (Closed): [Installation&On-site support] UAT of weight scale (1 Set)
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2980 (Closed): [Installation&On-site support] Install Hardware weight scale (1 Set)
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2978 (Closed): [Installation&On-site support] Internal Test IV/IM
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2979 (Closed): [Installation&On-site support] Modify Label Tag Receive (Test)
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #1066 (Closed): [Coding] Handy development
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2977 (Closed): [Installation&On-site support] Modify web socket
Siriwilai Chaiwattanaphon
13:37 A.N.I. LOGISTICS, LTD. Project progress work #2976 (Closed): [Installation&On-site support] Training User
Siriwilai Chaiwattanaphon
13:35 A.N.I. LOGISTICS, LTD. Project progress work #2974 (Closed): [Installation&On-site support] Import master program IM data / UAT IM Process
Siriwilai Chaiwattanaphon
13:34 A.N.I. LOGISTICS, LTD. Project progress work #2973 (Closed): [Installation&On-site support] Import master program IV data / UAT IV Process
Siriwilai Chaiwattanaphon
13:34 A.N.I. LOGISTICS, LTD. Project progress work #2972 (Closed): [Installation&On-site support] UAT Inner packing Process PC with Handy
Siriwilai Chaiwattanaphon
13:34 A.N.I. LOGISTICS, LTD. Project progress work #2971 (Closed): [Installation&On-site support] Import master Ocr-Qpoint check
Siriwilai Chaiwattanaphon
13:34 A.N.I. LOGISTICS, LTD. Project progress work #2970 (Closed): [Installation&On-site support] Handy Set IP and Install APK 41 devices
Siriwilai Chaiwattanaphon
10:04 THAI MATTO NS CO., LTD. Project progress work #3353 (New): [Installation&On-site support] Onsite support
Siriwilai Chaiwattanaphon
10:04 THAI MATTO NS CO., LTD. Project progress work #3352 (New): [Installation&On-site support] Onsite support
Siriwilai Chaiwattanaphon
10:03 THAI MATTO NS CO., LTD. Project progress work #3351 (New): [Installation&On-site support] Onsite support
Siriwilai Chaiwattanaphon
09:57 PROSPIRA THAILAND CO., LTD. Project progress work #3350 (In Progress): [Installation&On-site support] Onsite support issue and request
Siriwilai Chaiwattanaphon
09:57 PROSPIRA THAILAND CO., LTD. Project progress work #3350 (In Progress): [Installation&On-site support] Onsite support issue and request
Siriwilai Chaiwattanaphon

22 Dec 2025

18:02 A.N.I. LOGISTICS, LTD. Project progress work #3349: [Installation&On-site support] UAT/Fix Issue/Go live
today
UAT Test Weight Scale on site
tomorrow
Fix issue
Priroj Neamjarn
16:10 A.N.I. LOGISTICS, LTD. Project progress work #3349 (In Progress): [Installation&On-site support] UAT/Fix Issue/Go live
Siriwilai Chaiwattanaphon
16:10 A.N.I. LOGISTICS, LTD. Project progress work #3349 (Confirmation request): [Installation&On-site support] UAT/Fix Issue/Go live
Siriwilai Chaiwattanaphon
16:10 A.N.I. LOGISTICS, LTD. Project progress work #2969 (Closed): [Installation&On-site support] Create Table Master
Siriwilai Chaiwattanaphon
16:10 A.N.I. LOGISTICS, LTD. Project progress work #2968 (Closed): [Installation&On-site support] Install WebSocket controller Trim
Siriwilai Chaiwattanaphon

19 Dec 2025

13:31 UNIMICRON (THAILAND) CO., LTD. Parent project #3347: [PJ2500104] IoT system for Unimicron(Thailand)Co., Ltd Phase02
1. Software
1.1 Software development fee 1 job
2. Internal Installation
2.1 Drawing design 1 job
2.2 Assembly...
Siriwilai Chaiwattanaphon
11:45 UNIMICRON (THAILAND) CO., LTD. Parent project #3347 (In Progress): [PJ2500104] IoT system for Unimicron(Thailand)Co., Ltd Phase02
Siriwilai Chaiwattanaphon
11:57 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Parent project #3348: [PJ250105] Label & Ribbon
1. CARBON RIBBON WAX T102H 21.5 x 300mm. Q'ty 10 Rolls
2. LABEL 60.33x210 mm. 80G Non-Glue Q'ty 20 Rolls
Siriwilai Chaiwattanaphon
11:50 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Parent project #3348 (Closed): [PJ250105] Label & Ribbon
Siriwilai Chaiwattanaphon
11:44 UNIMICRON (THAILAND) CO., LTD. Parent project #3346 (In Progress): [PJ2500104] IoT system for Unimicron(Thailand)Co., Ltd Phase01
Siriwilai Chaiwattanaphon
10:51 AH BRAKE (THAILAND) CO., LTD. Project progress work #3345 (New): [Installation&On-site support]
Siriwilai Chaiwattanaphon
10:51 AH BRAKE (THAILAND) CO., LTD. Project progress work #3344 (New): [Coding]
Siriwilai Chaiwattanaphon
10:50 AH BRAKE (THAILAND) CO., LTD. Project progress work #3343 (New): [Internal Design]
Siriwilai Chaiwattanaphon
10:50 AH BRAKE (THAILAND) CO., LTD. Project progress work #3342 (New): [Requirement definition]
Siriwilai Chaiwattanaphon
10:49 AH BRAKE (THAILAND) CO., LTD. Parent project #3341 (In Progress): [PJ250103] MOC packing system for AHT modification fee Convert to picking list
Siriwilai Chaiwattanaphon
10:47 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3340 (In Progress): [Installation&On-site support]
Siriwilai Chaiwattanaphon
10:47 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3339 (Closed): [Coding] EDI New Label
Siriwilai Chaiwattanaphon
10:46 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3338 (Closed): [Internal Design]
Siriwilai Chaiwattanaphon
10:46 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #3337 (Closed): [Requirement definition]
Siriwilai Chaiwattanaphon
10:45 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Parent project #3336 (In Progress): [PJ250102] Web EDI system customize Request label print of Nov.2025
Software
Web EDI system customizes development fee 1 Job
Siriwilai Chaiwattanaphon
10:39 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3335 (New): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
10:38 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3334 (New): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
10:37 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3333 (New): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
10:36 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3332 (New): [Installation&Onsite support] User Testing & Trial
Siriwilai Chaiwattanaphon
10:36 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3331 (New): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
10:34 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3330 (New): [Installation&On-site support] Software installation
Siriwilai Chaiwattanaphon
10:33 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3329 (New): [Installation&On-site support] Line 5: Installation / Wiring / Config / IO Check
Siriwilai Chaiwattanaphon
10:32 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3328 (New): [Installation&On-site support] Line 4: Installation / Wiring / Config / IO Check
Siriwilai Chaiwattanaphon
10:31 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3326 (Closed): [Installation&On-site support] Line 2: Installation / Wiring / Config / IO Check
Siriwilai Chaiwattanaphon
09:31 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3326 (Closed): [Installation&On-site support] Line 2: Installation / Wiring / Config / IO Check
Siriwilai Chaiwattanaphon
10:31 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3327 (New): [Installation&On-site support] Line 3: Installation / Wiring / Config / IO Check
Siriwilai Chaiwattanaphon
09:29 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3325 (New): [Coding] Web application installation Line 3,4,5
Siriwilai Chaiwattanaphon
09:28 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3324 (New): [Coding] DB Setup and modification Line 3,4,5
Siriwilai Chaiwattanaphon
09:27 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3323 (New): [Coding] Web application installation Line 2
Siriwilai Chaiwattanaphon
09:26 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3322 (New): [Coding] DB Seteup and modification Line 2
Siriwilai Chaiwattanaphon
09:22 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3321 (New): [Coding] Validation check Signal & Information
Siriwilai Chaiwattanaphon
09:22 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3320 (New): [Coding] WDT Configuration Line 5
Siriwilai Chaiwattanaphon
09:21 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3319 (New): [Coding] Validation check Signal & Information Line 4
Siriwilai Chaiwattanaphon
09:21 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3318 (New): [Coding] WDT Configuration Line 4
Siriwilai Chaiwattanaphon
09:20 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3314 (Closed): [Coding] WDT Configuration Line 2
Siriwilai Chaiwattanaphon
09:17 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3314 (Closed): [Coding] WDT Configuration Line 2
Siriwilai Chaiwattanaphon
09:20 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3315 (Closed): [Coding] Validation check Signal & Information Line 2
Siriwilai Chaiwattanaphon
09:18 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3315 (Closed): [Coding] Validation check Signal & Information Line 2
Siriwilai Chaiwattanaphon
09:20 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3317 (New): [Coding] Validation check Signal & Information Line 3
Siriwilai Chaiwattanaphon
09:19 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3316 (New): [Coding] WDT Configuration Line 3
Siriwilai Chaiwattanaphon
09:14 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3313 (Closed): [Internal Design] Hardware Assembly
Siriwilai Chaiwattanaphon
09:14 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3313 (Closed): [Internal Design] Hardware Assembly
Siriwilai Chaiwattanaphon
09:14 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3312 (Closed): [Internal Design] Hardware pre-shipment confirmation
Siriwilai Chaiwattanaphon
09:12 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3312 (Closed): [Internal Design] Hardware pre-shipment confirmation
Siriwilai Chaiwattanaphon
09:14 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3311 (Closed): [Internal Design] Hardware procurement
Siriwilai Chaiwattanaphon
09:11 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3311 (Closed): [Internal Design] Hardware procurement
Siriwilai Chaiwattanaphon
09:10 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3310 (Closed): [Internal Design] Drawing Desing
Siriwilai Chaiwattanaphon
09:10 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3310 (Closed): [Internal Design] Drawing Desing
Siriwilai Chaiwattanaphon
09:07 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3302 (Closed): [Requirement definition]
Siriwilai Chaiwattanaphon
08:54 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3302 (Closed): [Requirement definition]
Siriwilai Chaiwattanaphon
09:07 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3309 (Closed): [Internal Design] System design
Siriwilai Chaiwattanaphon
09:07 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3309 (Closed): [Internal Design] System design
Siriwilai Chaiwattanaphon
09:06 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3308 (Closed): [Requirement definition] Data organization/confirmation
Siriwilai Chaiwattanaphon
09:06 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3308 (Closed): [Requirement definition] Data organization/confirmation
Siriwilai Chaiwattanaphon
09:05 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3307 (Closed): [Requirement definition] Requirements confirmation
Siriwilai Chaiwattanaphon
09:04 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3307 (Closed): [Requirement definition] Requirements confirmation
Siriwilai Chaiwattanaphon
09:05 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3306 (Closed): [Requirement definition] Kick-off meeting after PO
Siriwilai Chaiwattanaphon
09:03 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3306 (Closed): [Requirement definition] Kick-off meeting after PO
Siriwilai Chaiwattanaphon
08:55 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3305 (New): [Installation&On-site support]
Siriwilai Chaiwattanaphon
08:55 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3304 (New): [Coding]
Siriwilai Chaiwattanaphon
08:54 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3303 (New): [Internal Design]
Siriwilai Chaiwattanaphon

18 Dec 2025

15:56 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2918 (Closed): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
15:56 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2917 (Closed): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
15:56 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2916 (Closed): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
15:56 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2915 (Closed): [Installation&On-site support] User Testing & Trial
Siriwilai Chaiwattanaphon
15:56 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2914 (Closed): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
14:37 PORITE CORPORATION Project progress work #3288 (Closed): [Coding]
Siriwilai Chaiwattanaphon
13:43 PORITE CORPORATION Project progress work #3288 (Closed): [Coding]
Siriwilai Chaiwattanaphon
14:37 PORITE CORPORATION Project progress work #3300 (Closed): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
13:59 PORITE CORPORATION Project progress work #3300 (Closed): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
14:37 PORITE CORPORATION Project progress work #3298 (Closed): [Installation&On-site support] User Testing & Trial
Siriwilai Chaiwattanaphon
13:56 PORITE CORPORATION Project progress work #3298 (Closed): [Installation&On-site support] User Testing & Trial
Siriwilai Chaiwattanaphon
14:37 PORITE CORPORATION Project progress work #3297 (Closed): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
13:55 PORITE CORPORATION Project progress work #3297 (Closed): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
14:36 PORITE CORPORATION Project progress work #3296 (Closed): [Installation&On-site support] Hardware installation
Siriwilai Chaiwattanaphon
13:54 PORITE CORPORATION Project progress work #3296 (Closed): [Installation&On-site support] Hardware installation
Siriwilai Chaiwattanaphon
14:36 PORITE CORPORATION Project progress work #3295 (Closed): [Installation&On-site suppoort] Software installation
Siriwilai Chaiwattanaphon
13:53 PORITE CORPORATION Project progress work #3295 (Closed): [Installation&On-site suppoort] Software installation
Siriwilai Chaiwattanaphon
14:36 PORITE CORPORATION Project progress work #1182 (Closed): [Internal Design]
Siriwilai Chaiwattanaphon
14:36 PORITE CORPORATION Project progress work #1181 (Closed): [Requirement definition]
Siriwilai Chaiwattanaphon
14:36 PORITE CORPORATION Project progress work #3294 (Closed): [Coding] Hardware
Siriwilai Chaiwattanaphon
13:52 PORITE CORPORATION Project progress work #3294 (Closed): [Coding] Hardware
Siriwilai Chaiwattanaphon
14:36 PORITE CORPORATION Project progress work #3293 (Closed): [Coding] Remote test with PLC
Siriwilai Chaiwattanaphon
13:51 PORITE CORPORATION Project progress work #3293 (Closed): [Coding] Remote test with PLC
Siriwilai Chaiwattanaphon
14:36 PORITE CORPORATION Project progress work #3292 (Closed): [Coding] Server Remote setup
Siriwilai Chaiwattanaphon
13:50 PORITE CORPORATION Project progress work #3292 (Closed): [Coding] Server Remote setup
Siriwilai Chaiwattanaphon
14:36 PORITE CORPORATION Project progress work #3291 (Closed): [Coding] Internal final test
Siriwilai Chaiwattanaphon
13:49 PORITE CORPORATION Project progress work #3291 (Closed): [Coding] Internal final test
Siriwilai Chaiwattanaphon
14:36 PORITE CORPORATION Project progress work #3290 (Closed): [Coding] Software test
Siriwilai Chaiwattanaphon
13:48 PORITE CORPORATION Project progress work #3290 (Closed): [Coding] Software test
Siriwilai Chaiwattanaphon
14:36 PORITE CORPORATION Project progress work #3289 (Closed): [Coding] Software Develop
Siriwilai Chaiwattanaphon
13:47 PORITE CORPORATION Project progress work #3289 (Closed): [Coding] Software Develop
Siriwilai Chaiwattanaphon
14:35 PORITE CORPORATION Project progress work #3299 (Closed): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
13:57 PORITE CORPORATION Project progress work #3299 (Closed): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
14:34 PORITE CORPORATION Project progress work #3301 (In Progress): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
14:13 PORITE CORPORATION Project progress work #3301 (Closed): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
14:33 THAI ASAHI DENSO CO., LTD. Project progress work #2944 (Closed): [Installation&On-site support] Production monitoring System / OEE / Report
Siriwilai Chaiwattanaphon
14:33 THAI ASAHI DENSO CO., LTD. Project progress work #2946 (Closed): [Installation&On-site support] 3D Production monitoring
Siriwilai Chaiwattanaphon
14:32 THAI ASAHI DENSO CO., LTD. Project progress work #2943 (Closed): [Installation&On-site support] ANDON System / Production Overview
Siriwilai Chaiwattanaphon
14:32 THAI ASAHI DENSO CO., LTD. Project progress work #2945 (Closed): [Installation&On-site support] 3D Facility Monitoring
Siriwilai Chaiwattanaphon
14:31 THAI ASAHI DENSO CO., LTD. Project progress work #2931 (Closed): [Installation&On-site support] Production software installation
Siriwilai Chaiwattanaphon
14:31 THAI ASAHI DENSO CO., LTD. Project progress work #2942 (Closed): [Installation&On-site support] PLC Production group 4 [ 15 Machine ]
Siriwilai Chaiwattanaphon
14:31 THAI ASAHI DENSO CO., LTD. Project progress work #2922 (Closed): [Installation&On-site support] Utility software installation
Siriwilai Chaiwattanaphon
14:30 THAI ASAHI DENSO CO., LTD. Project progress work #2930 (Closed): [Installation&On-site support] Air jet fan monitoring & Control
Siriwilai Chaiwattanaphon
14:30 THAI ASAHI DENSO CO., LTD. Project progress work #2929 (Closed): [Installation&On-site support] Blower exhaust 5 monitoring & Control
Siriwilai Chaiwattanaphon
14:30 THAI ASAHI DENSO CO., LTD. Project progress work #2928 (Closed): [Installation&On-site support] Blower exhaust 1-4 monitoring & Control
Siriwilai Chaiwattanaphon
14:30 THAI ASAHI DENSO CO., LTD. Project progress work #2927 (Closed): [Installation&On-site support] Valve Air dryer monitoring & Control
Siriwilai Chaiwattanaphon
14:30 THAI ASAHI DENSO CO., LTD. Project progress work #2926 (Closed): [Installation&On-site support] Valve Air compressor monitoring & Control
Siriwilai Chaiwattanaphon
14:30 THAI ASAHI DENSO CO., LTD. Project progress work #2925 (Closed): [Installation&On-site support] Air Dryer monitoring & Control
Siriwilai Chaiwattanaphon
14:30 THAI ASAHI DENSO CO., LTD. Project progress work #2924 (Closed): [Installation&On-site support] Air compressor monitoring & Control
Siriwilai Chaiwattanaphon
14:30 THAI ASAHI DENSO CO., LTD. Project progress work #2923 (Closed): [Installation&On-site support] PLC Software installation
Siriwilai Chaiwattanaphon
14:30 THAI ASAHI DENSO CO., LTD. Project progress work #2941 (Closed): [Installation&On-site support] PLC Production group 3 [ 15 Machine ]
Siriwilai Chaiwattanaphon
14:29 THAI ASAHI DENSO CO., LTD. Project progress work #2940 (Closed): [Installation&On-site support] PLC Production group 2 [ 15 Machine ]
Siriwilai Chaiwattanaphon
14:29 THAI ASAHI DENSO CO., LTD. Project progress work #2939 (Closed): [Installation&On-site support] PLC Production group 1 [ 15 Machine ]
Siriwilai Chaiwattanaphon
14:29 THAI ASAHI DENSO CO., LTD. Project progress work #2938 (Closed): [Installation&On-site support] PLC Production configuration & UAT Line 9/7
Siriwilai Chaiwattanaphon
14:29 THAI ASAHI DENSO CO., LTD. Project progress work #2937 (Closed): [Installation&On-site support] PLC Main system installation
Siriwilai Chaiwattanaphon
14:29 THAI ASAHI DENSO CO., LTD. Project progress work #2936 (Closed): [Installation&On-site support] Configuration / Setup master
Siriwilai Chaiwattanaphon
14:29 THAI ASAHI DENSO CO., LTD. Project progress work #2935 (Closed): [Installation&On-site support] Server software installation
Siriwilai Chaiwattanaphon
14:29 THAI ASAHI DENSO CO., LTD. Project progress work #2954 (Closed): [Installation&On-site support] Hardware installation
Siriwilai Chaiwattanaphon
14:28 THAI ASAHI DENSO CO., LTD. Project progress work #2952 (Closed): [Installation&On-site support] Utility system UAT
Siriwilai Chaiwattanaphon
14:28 THAI ASAHI DENSO CO., LTD. Project progress work #2960 (Closed): [Installation&On-site support] Blower Exhaust cabinets old.
Siriwilai Chaiwattanaphon
14:28 THAI ASAHI DENSO CO., LTD. Project progress work #2961 (Closed): [Installation&On-site support] Installation and wiring Air flow sensor
Siriwilai Chaiwattanaphon
14:25 THAI ASAHI DENSO CO., LTD. Project progress work #2962 (Closed): [Installation&On-site support] Connect and field test system
Siriwilai Chaiwattanaphon
14:25 THAI ASAHI DENSO CO., LTD. Project progress work #2963 (Closed): [Installation&On-site support] Connect and field test system
Siriwilai Chaiwattanaphon
14:25 THAI ASAHI DENSO CO., LTD. Project progress work #2964 (Closed): [Installation&On-site support] System utility integration test
Siriwilai Chaiwattanaphon
14:25 THAI ASAHI DENSO CO., LTD. Project progress work #2959 (Closed): [Installation&On-site support] Installation and wiring cabinet Blower Exhaust new
Siriwilai Chaiwattanaphon
14:25 THAI ASAHI DENSO CO., LTD. Project progress work #2958 (Closed): [Installation&On-site support] Air Dryer 2 Units
Siriwilai Chaiwattanaphon
14:24 THAI ASAHI DENSO CO., LTD. Project progress work #2957 (Closed): [Installation&On-site support] Installation and wiring cabinet Utility Air compressor, Dryer
Siriwilai Chaiwattanaphon
14:24 THAI ASAHI DENSO CO., LTD. Project progress work #2956 (Closed): [Installation&On-site support] Installation and wiring cabinet PLC (server room)
Siriwilai Chaiwattanaphon
14:24 THAI ASAHI DENSO CO., LTD. Project progress work #2955 (Closed): [Installation&On-site support] Installation and wiring LAN cables and RS485 cable of Utility
Siriwilai Chaiwattanaphon
14:18 THAI ASAHI DENSO CO., LTD. Project progress work #2965 (Closed): [Installation&On-site support] Installation and Configuration Production system
Siriwilai Chaiwattanaphon
13:42 PORITE CORPORATION Project progress work #823 (Closed): [Colding] Back-End Web dashboard application PHP
Siriwilai Chaiwattanaphon
13:42 PORITE CORPORATION Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP
Siriwilai Chaiwattanaphon

17 Dec 2025

16:16 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Parent project #1439 (Closed): [PJ250058] Web EDI system customize Request of Jul.2025
Siriwilai Chaiwattanaphon
16:14 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #1444 (Closed): [Installation&On-site support] Golive
Siriwilai Chaiwattanaphon
16:14 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #1443 (Closed): [Installation&On-site support] Software Update function
Siriwilai Chaiwattanaphon
16:11 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Parent project #2994 (Closed): [PJ250085] Change monitor display content development fee
Siriwilai Chaiwattanaphon
 