Activity
From 06 Aug 2025 to 15 Aug 2025
14 Aug 2025
- 17:31 Prospira Thailand Co., Ltd. Project progress work #1010: Warehouse management system
- today
-UAT TEST ON SITE
tomorrow
-Fix and New Requirement
-Pokayoke Process - 14:43 DAIFUKU (THAILAND) LTD. Project progress work #1208 (Closed): [Installation&On-site support] FTP Test
- 14:37 DAIFUKU (THAILAND) LTD. Project progress work #1207 (Closed): [Installation&On-site support] Installation Camera and Stand
- 14:05 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1206 (Closed): [Installation&On-site support] Compare Data
13 Aug 2025
- 17:22 Prospira Thailand Co., Ltd. Project progress work #1010: Warehouse management system
- today
-Fix and New Requirement
-Pokayoke Process
tomorrow
-UAT TEST ON SITE - 15:18 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1205 (In Progress): [Coding] Add Language menu english to japanese
- 15:18 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1204 (Close request): [Coding] Add Setting hide show column (Stock Inquiry/Report, Stock Inventory Report)
- 15:17 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1203 (Close request): [Coding] Add new page Report QC Page
- 15:16 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1202 (Close request): [Coding] Purchase instructions 3 months change to 4 months
- 15:15 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1201 (Close request): [Coding] Add new Report stockcard (open,rec,issue,stock) Page
- 15:14 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1200 (Close request): [Coding] Add new page Report delivery (monthly delivery report) Page
- 15:13 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1199 (Close request): [Coding] Gen pdf Assembly Order Sheet Report (Assy,Press,Inj)
- 15:12 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1198 (Close request): [Coding] Add new page & Implement QC process for production (Assy, Inj, Press)
- 15:11 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1197 (Close request): [Coding] Modify generate production schedule
- 15:10 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1196 (Close request): [Coding] Add new page master data ng detail
- 15:09 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1195 (Close request): [Coding] Add new page Schedule QC material
- 15:08 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1194 (Close request): [Coding] Implement QC process for purchase orders (Po, Pr) *wait AQL data
- 15:07 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1193 (Close request): [Coding] Add new page Report warehouse (monthly inventory report) Page
- 15:06 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1192 (Close request): [Coding] Add new page Report delivery (weekly delivery report) Page
- 15:04 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1191 (Close request): [Coding] Add new master data page (machine)
- 15:03 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1190 (Close request): [Coding] Add new master data page (line)
- 15:02 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1189 (Close request): [Coding] Search by part_name on page (stock inventory report) Search By part_name page stock_inquiry_report
- 15:01 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1188 (Close request): [Coding] Import schedule production (assy, press, inj) and delivery for 1 months to 4 months
- 13:52 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1185 (Close request): [Installation&On-site support]
- 13:51 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1184 (In Progress): [Coding] Software development (Web)
12 Aug 2025
- 12:37 PORITE CORPORATION Project progress work #1183 (New): [Installation&On-site support]
- 12:37 PORITE CORPORATION Project progress work #1182 (Closed): [Internal Design]
- 12:37 PORITE CORPORATION Project progress work #1181 (Closed): [Requirement definition]
- 12:35 Toyota Boshoku Filtration System (Thailand) Co.,Ltd Project progress work #1180 (Closed): [Installation&On-site support]
- 12:34 Toyota Boshoku Filtration System (Thailand) Co.,Ltd Project progress work #1179 (Closed): [Internal Design]
- 12:34 Toyota Boshoku Filtration System (Thailand) Co.,Ltd Project progress work #1178 (Closed): [Requirement definition]
- 12:30 KOITO MANUFACTURING CO., LTD. Project progress work #1177 (Closed): [Installation&On-site support]
- 12:29 KOITO MANUFACTURING CO., LTD. Project progress work #1176 (Closed): [Internal Design]
- 12:29 KOITO MANUFACTURING CO., LTD. Project progress work #1175 (Closed): [Requirement definition]
- 11:44 Prospira Thailand Co., Ltd. Project progress work #1174 (In Progress): [Installation&On-site support]
- 11:44 Prospira Thailand Co., Ltd. Project progress work #1173 (Closed): [Coding]
- 11:44 Prospira Thailand Co., Ltd. Project progress work #1172 (Closed): [Internal Design]
- 11:43 Prospira Thailand Co., Ltd. Project progress work #1171 (Closed): [Requirement definition]
- 11:37 Thai Metaltech Co.,Ltd Project progress work #1170 (New): [Installation&On-site support]
- 11:37 Thai Metaltech Co.,Ltd Project progress work #1169 (New): [Internal Design]
- 11:37 Thai Metaltech Co.,Ltd Project progress work #1168 (New): [Requirement definition]
- 11:33 THAI MATTO NS CO.,LTD. Project progress work #1166 (In Progress): [Coding] Schedule
- 11:33 THAI MATTO NS CO.,LTD. Project progress work #1165 (Closed): [Internal Design]
- 11:32 THAI MATTO NS CO.,LTD. Project progress work #1164 (Closed): [Requirement definition]
- 11:28 THAI INABA FOODS COMPANY LIMITED Project progress work #1162 (Closed): [Internal Design]
- 11:28 THAI INABA FOODS COMPANY LIMITED Project progress work #1161 (Closed): [Requirement definition]
- 11:25 SIAM NITORI Co., Ltd. Project progress work #1160 (New): [Installation&On-site support]
- 11:25 SIAM NITORI Co., Ltd. Project progress work #1159 (New): [Coding]
- 11:24 SIAM NITORI Co., Ltd. Project progress work #1158 (New): [Internal Design]
- 11:24 SIAM NITORI Co., Ltd. Project progress work #1157 (New): [Requirement definition]
- 11:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. Project progress work #1156 (Closed): [Installation&On-site support] Modify
- 11:16 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. Project progress work #1155 (Closed): [Internal Design]
- Recheck handy Program.
- 11:10 PT NIPPON KONPO INDONESIA Project progress work #1154 (Closed): [Installation&On-site support]
- 11:10 PT NIPPON KONPO INDONESIA Project progress work #1153 (Closed): [Coding]
- 11:10 PT NIPPON KONPO INDONESIA Project progress work #1152 (Closed): [Internal Design]
- 11:09 PT NIPPON KONPO INDONESIA Project progress work #1151 (Closed): [Requirement definition]
- 10:57 Rajamangala University of Technology Rattanakosin Project progress work #1150 (Closed): [Installation&On-site support]
- 10:57 Rajamangala University of Technology Rattanakosin Project progress work #1149 (Closed): [Coding]
- 10:56 Rajamangala University of Technology Rattanakosin Project progress work #1148 (Closed): [Internal Design]
- 10:55 Rajamangala University of Technology Rattanakosin Project progress work #1147 (Closed): [Requirement definition]
- 10:41 NTPT Company Limited. Project progress work #1146 (New): [Installation&On-site support]
- 10:41 NTPT Company Limited. Project progress work #1145 (New): [Coding]
- 10:40 NTPT Company Limited. Project progress work #1144 (New): [Internal Design]
- 10:39 NTPT Company Limited. Project progress work #1143 (New): [Requirement definition]
11 Aug 2025
- 17:38 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1142 (Closed): [Installation&On-site support]
- 17:38 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1141 (Closed): [Coding]
- 17:37 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1140 (Closed): [Internal Design]
- 17:37 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1139 (Closed): [Requirement definition]
- 17:36 NTN Manufacturing(Thailand) Co., Ltd. Parent project #1138 (Closed): [PJ250009] ConMas i-Reporter 20 users On-premises
- 17:34 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1137 (New): [Installation&On-site support]
- 17:34 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1136 (New): [Coding]
- 17:34 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1135 (New): [Internal Design]
- 17:33 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1134 (New): [Requirement definition]
- 17:32 Prospira Thailand Co., Ltd. Project progress work #1010: Warehouse management system
- today
-Fix and New Requirement
tomorrow
-Fix and New Requirement - 17:29 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1133 (In Progress): [Internal Design]
- 17:28 NTN Manufacturing(Thailand) Co., Ltd. Project progress work #1132 (In Progress): [Requirement definition]
- 17:22 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #1131 (New): [Installation&On-site support]
- 17:22 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #1130 (New): [Coding] Documentation user manual web
- 17:21 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #1129 (New): [Internal Design]
- 17:21 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #1128 (New): [Requirement definition]
- 17:15 NIPPN (Thailand) Co.,Ltd. Project progress work #1126 (Closed): [Coding] Master data
- 17:09 Sumitomo Rubber (Thailand) Co., Ltd Project progress work #1123 (Closed): [Installation&On-site support]
- 17:08 Sumitomo Rubber (Thailand) Co., Ltd Project progress work #1122 (Closed): [Coding]
- 17:07 Sumitomo Rubber (Thailand) Co., Ltd Project progress work #1121 (Closed): [Internal Design]
- 17:05 Sumitomo Rubber (Thailand) Co., Ltd Project progress work #1120 (Closed): [Requirement definition]
- 17:01 Mitsui Precision Thai Co.,Ltd Project progress work #1119 (New): [Installation&On-site support]
- 17:00 Mitsui Precision Thai Co.,Ltd Project progress work #1118 (New): [Coding]
- 16:59 Mitsui Precision Thai Co.,Ltd Project progress work #1117 (In Progress): [Internal Design]
- 16:58 Mitsui Precision Thai Co.,Ltd Project progress work #1116 (Closed): [Requirement definition]
- 16:53 Minebea AccessSolutions Thai Ltd Project progress work #1115 (Closed): [Installation&On-site support]
- 16:52 Minebea AccessSolutions Thai Ltd Project progress work #1114 (Closed): [Internal Design]
- 16:52 Minebea AccessSolutions Thai Ltd Project progress work #1113 (Closed): [Requirement definition]
- 16:43 MHI Automotive climate control Thailand.Co.Ltd Project progress work #1112 (Closed): [Installation&On-site support]
- 16:42 MHI Automotive climate control Thailand.Co.Ltd Project progress work #1111 (Closed): [Internal Design]
- 16:40 MHI Automotive climate control Thailand.Co.Ltd Project progress work #1110 (Closed): [Requirement definition]
- 16:24 KEIAISHA(THAILAND)CO.,LTD. Project progress work #1105 (Closed): [Installation&On-site support]
- 16:22 KEIAISHA(THAILAND)CO.,LTD. Project progress work #1104 (Closed): [Internal Design]
- 16:21 KEIAISHA(THAILAND)CO.,LTD. Project progress work #1103 (Closed): Requirement Definition
- 16:03 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Project progress work #1102 (Closed): [Installation&On-site support]
- 16:00 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Project progress work #1101 (Closed): [Internal Design]
- 15:59 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Project progress work #1100 (Closed): [Requirement definition]
- 15:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #1099 (New): [Installation&On-site support]
- 15:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #1098 (New): [Coding] Backend coding * hold, Waiting for shindengen
- 15:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #1097 (Closed): [Internal Design]
- 15:47 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #1096 (Closed): [Requirement definition]
- 15:34 FILCON FABRICS & TECHNOLOGY CO.,LTD. Project progress work #1095 (New): [Installation&On-site support]
- 15:33 FILCON FABRICS & TECHNOLOGY CO.,LTD. Project progress work #1094 (New): [Coding]
- 15:33 FILCON FABRICS & TECHNOLOGY CO.,LTD. Project progress work #1093 (New): [Internal Design]
- 15:32 FILCON FABRICS & TECHNOLOGY CO.,LTD. Project progress work #1092 (New): [Requirement definition]
- 15:27 ShinDengen(Thailand)Co.,Ltd Project progress work #1091 (Closed): [Installation&On-site support]
- 15:26 ShinDengen(Thailand)Co.,Ltd Project progress work #1090 (Closed): [Coding]
- 15:24 ShinDengen(Thailand)Co.,Ltd Project progress work #1089 (Closed): [Internal Design]
- 15:09 ShinDengen(Thailand)Co.,Ltd Project progress work #1088 (Closed): [Requirement definition]
- 15:01 Asian Stanley. International Limited Project progress work #1087 (Closed): [Installation&On-site support] Classify
- 15:00 Asian Stanley. International Limited Project progress work #1086 (Closed): [Coding] Software development (Handy)
- 14:59 Asian Stanley. International Limited Project progress work #1085 (Closed): [Internal Design]
- 14:58 Asian Stanley. International Limited Project progress work #1084 (Closed): [Requirement definition]
- 14:51 Asian Stanley. International Limited Project progress work #1083 (Closed): [Installation&On-site support]
- 14:50 Asian Stanley. International Limited Project progress work #1081 (Closed): [Internal Design]
- 14:48 Asian Stanley. International Limited Project progress work #1080 (Closed): [Requirement definition]
- 13:50 ALPHA INDUSTRY (THAILAND) CO.,LTD. Project progress work #1079 (Closed): [Installation&On-site support]
- 13:49 ALPHA INDUSTRY (THAILAND) CO.,LTD. Project progress work #1078 (Closed): [Coding]
- 13:48 ALPHA INDUSTRY (THAILAND) CO.,LTD. Project progress work #1077 (Closed): [Internal Design]
- 13:46 ALPHA INDUSTRY (THAILAND) CO.,LTD. Project progress work #1076 (Closed): [Requirement definition]
- 11:33 A.N.I. LOGISTICS, LTD. Project progress work #1075 (In Progress): Electrical Diagram Weight Checker
- 11:27 A.N.I. LOGISTICS, LTD. Project progress work #1075 (Closed): Electrical Diagram Weight Checker
- Layout cabinet
Power circuit
Control circuit
10 Aug 2025
- 21:11 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. Project progress work #1072 (Closed): issue onsite 08 Aug 2025
- 1. User want input memo in log error handy
2. User want show last update and user change status kanban in menu kanba... - 20:56 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. Problem-Bug #1021: issue onsite 29 July 2025
- Install update handy and pegasus SKT Server 08-Aug-2025
08 Aug 2025
- 17:25 Prospira Thailand Co., Ltd. Project progress work #1010: Warehouse management system
- today
-Fix and New Requirement
tomorrow
-Fix and New Requirement - 10:13 A.N.I. LOGISTICS, LTD. Project progress work #1071 (Closed): [Installation&On-site support]
- 10:12 A.N.I. LOGISTICS, LTD. Project progress work #1070 (Closed): [Coding]
- 10:11 A.N.I. LOGISTICS, LTD. Project progress work #1069 (Closed): [Internal Design]
- 10:11 A.N.I. LOGISTICS, LTD. Project progress work #1068 (Closed): [Requirement definition]
- 10:08 A.N.I. LOGISTICS, LTD. Project progress work #1067 (New): [Installation&On-site support]
- 10:08 A.N.I. LOGISTICS, LTD. Project progress work #1066 (In Progress): [Coding] Handy development
- Handy and Socket method
- 10:07 A.N.I. LOGISTICS, LTD. Project progress work #1065 (Closed): [Internal Design]
- 10:07 A.N.I. LOGISTICS, LTD. Project progress work #1064 (Closed): [Requirement definition]
- 10:03 A.N.I. LOGISTICS, LTD. Project progress work #1063 (Closed): [Installation&On-site support]
- 10:02 A.N.I. LOGISTICS, LTD. Project progress work #1062 (Closed): [Coding]
- 10:01 A.N.I. LOGISTICS, LTD. Project progress work #1061 (Closed): [Internal Design]
- 09:58 A.N.I. LOGISTICS, LTD. Project progress work #1060 (Closed): [Requirement definition]
- 09:45 A.N.I. LOGISTICS, LTD. Parent project #1059 (Closed): [PJ250038] CKD system add Camera system & handy temrinal OCR function Hardware
- 09:43 A.N.I. LOGISTICS, LTD. Parent project #1058 (In Progress): [PJ250037] CKD system Phase 06
- 09:39 A.N.I. LOGISTICS, LTD. Parent project #1057 (Closed): [PJ240041] CKD system Phase 04 & 05
07 Aug 2025
- 21:41 Prospira Thailand Co., Ltd. Project progress work #1010: Warehouse management system
- today
-UAT TEST ON SITE
tomorrow
-Fix and New Requirement
06 Aug 2025
- 18:44 Prospira Thailand Co., Ltd. Project progress work #1010: Warehouse management system
- today
-New Requirement Inbound tag compound
tomorrow
-New Requirement Inbound tag compound - 13:24 FUJI NAME (THAILAND) CO.,LTD Project progress work #1056 (New): [Installation&On-site support]
- 13:23 FUJI NAME (THAILAND) CO.,LTD Project progress work #1055 (New): [Coding]
- 13:22 FUJI NAME (THAILAND) CO.,LTD Project progress work #1054 (New): [Internal Design]
- 13:20 FUJI NAME (THAILAND) CO.,LTD Project progress work #1053 (New): [Requirement definition]
- 13:18 FUJI NAME (THAILAND) CO.,LTD Parent project #1052 (In Progress): [PJ250018] ConMas i-Reporter 100 users On-premises for Fuji Name
- 11:38 SIAM NITERRA CO., LTD. Project progress work #1051 (New): [Installation&On-site support]
- 11:37 SIAM NITERRA CO., LTD. Project progress work #1050 (New): [Coding]
- 11:37 SIAM NITERRA CO., LTD. Project progress work #1049 (Closed): [Internal Design]
- 11:36 SIAM NITERRA CO., LTD. Project progress work #1048 (Closed): [Requirement definition]
- 11:34 SIAM NITERRA CO., LTD. Parent project #1047 (In Progress): [PJ250025] Pokayoke inspection system for SIAM NITERRA Co., Ltd.
- 11:05 Topre (Thailand) Co.,Ltd. Project progress work #1046 (New): [Installation&On-site support]
- 11:04 Topre (Thailand) Co.,Ltd. Project progress work #1045 (New): [Coding]
- 11:04 Topre (Thailand) Co.,Ltd. Project progress work #1044 (New): [Internal Design]
- 11:03 Topre (Thailand) Co.,Ltd. Project progress work #1043 (New): [Requirement definition]
- 11:01 Topre (Thailand) Co.,Ltd. Parent project #1042 (In Progress): [PJ250006] ConMas i-Reporter 10 users On-premises for Topre
- 10:29 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #1041 (Closed): [Installation&On-site support]
- 10:29 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #1040 (Closed): [Coding]
- 10:28 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #1039 (Closed): [Internal Design]
- 10:27 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #1038 (Closed): [Requirement definition]
- 10:25 FTS AUTOMOTIVE (THAILAND) CO.,LTD Parent project #1037 (Closed): [PJ250023] Production line IoT monitoring system
- 10:17 AIKAI LOGISTICS (THAILAND) CO., LTD Project progress work #1036 (New): [Installation&On-site support]
- 10:16 AIKAI LOGISTICS (THAILAND) CO., LTD Project progress work #1035 (New): [Coding]
- 10:15 AIKAI LOGISTICS (THAILAND) CO., LTD Project progress work #1034 (New): [Internal Design]
- 10:15 AIKAI LOGISTICS (THAILAND) CO., LTD Project progress work #1033 (In Progress): [Requirement definition]
- 10:04 AIKAI LOGISTICS (THAILAND) CO., LTD Parent project #1032 (In Progress): [PJ250024] Inspection label system development fee
- 09:58 AH BRAKE (THAILAND) CO., LTD. Project progress work #1031 (Confirmation request): [Installation&On-site support]
- 09:58 AH BRAKE (THAILAND) CO., LTD. Project progress work #1030 (Confirmation request): [Coding]
- 09:57 AH BRAKE (THAILAND) CO., LTD. Project progress work #1029 (Confirmation request): [Internal Design]
- 09:56 AH BRAKE (THAILAND) CO., LTD. Project progress work #1028 (Confirmation request): [Requirement definition]
- 09:43 AH BRAKE (THAILAND) CO., LTD. Parent project #1027 (In Progress): [PJ250017] Jig Pokayoke system for AH Brake (Thailand) Co., Ltd
- 09:25 A.N.I. LOGISTICS, LTD. Project progress work #1024 (Closed): [Internal Design] Backend, System and DB design
- 09:00 A.N.I. LOGISTICS, LTD. Project progress work #1023 (Closed): [Requirement Definition]
- 08:55 A.N.I. LOGISTICS, LTD. Parent project #1022 (In Progress): [PJ250028] IKD Management System for A.N.I.