Activity
From 04 Nov 2023 to 13 Nov 2023
13 Nov 2023
- 17:28 ACME INDUSTRY CO.,LTD. Project progress work #204 (In Progress): UAT about the WMS system and onsite support
- 17:27 ACME INDUSTRY CO.,LTD. Project progress work #204 (New): UAT about the WMS system and onsite support
- - Teaching about WMS and handy
- Make the manual document - 17:11 THAI NIPPON FOODS CO., LTD. Sales support #175: EV charger installation project
- Next action
> Support customer
> Wait PO - 17:00 TOMAS TECH CO., LTD. Project progress work #223 (In Progress): Internal check stock
- 16:59 TOMAS TECH CO., LTD. Project progress work #223 (Closed): Internal check stock
- Check stock equipment all project
- 16:54 KEYENCE (THAILAND) CO., LTD. Sales support #219 (Confirmation request): Keyence meeting
- Purpose
- To update technics function and application
- To summarize onhand projects
- Update function PLC KV8000
... - 16:53 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: fix Inbound And Outbound wait P'Yutt
Tomorrow: Installation - 16:53 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
- Today: check log error
- 16:50 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105: [Coding]Data linkage function
- Develop Export Inbound information File.
- 16:49 YKK (THAILAND) CO., LTD. Sales support #222 (In Progress): ConMas i-Reporter proposal for YKK
- 16:48 YKK (THAILAND) CO., LTD. Sales support #222 (Closed): ConMas i-Reporter proposal for YKK
- 16:47 ACME INDUSTRY CO.,LTD. Project progress work #142 (In Progress): UAT about the WMS system and onsite support
- 08:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #120: [Coding&UT] KV8000 Touch display and XD02 monitor screen
- -Deverlob web monitoring 5/14 on module KV-XD02
11 Nov 2023
- 17:50 A.N.I. LOGISTICS, LTD. Problem-Bug #221 (Close request): Found the problem with the handy show "Schedule not found"
10 Nov 2023
- 16:56 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: fix scan qr-code fix Inbound And Outbound
Tomorrow: fix scan qr-code fix Outbound and Test case - 16:53 A.N.I. LOGISTICS, LTD. Problem-Bug #221 (Confirmation request): Found the problem with the handy show "Schedule not found"
- 16:52 A.N.I. LOGISTICS, LTD. Problem-Bug #221 (Closed): Found the problem with the handy show "Schedule not found"
- Problem:
The handy always shows the "Schedule not found".
Causes:
The label has the missing data in QRCode.
S... - 16:52 THAI NIPPON FOODS CO., LTD. Project progress work #201: Summary of all equipment for use in the Machine operation monitoring systems project.
- Summarize equipment before order and requst a quotation supplier
- 16:49 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
- wait user test
- 16:49 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
- wait log error
- 16:47 A.N.I. LOGISTICS, LTD. Problem-Bug #151 (Interruption): Changed request: HATC's date format will be changed on this November
- 16:46 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105: [Coding]Data linkage function
- Develop Import Delivery instruction information File.
- 15:30 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #67: Automatic label pasting machine Concept proposal
- [ Today ]
Meeting agenda
1. Packet material
2. Layout machine
3. Process flow
[ Requiment from customer ]
1. Mo... - 15:04 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #211: MACO monitor robot in production line IoT project
- Update estimate cost MACO
09 Nov 2023
- 21:13 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #197: Support installation HT-Label printing system Phase 2
- -Handy set IP and Server
-5 printers already set up and tested for printing.
[Tomorrow]
-Set up and test the rem... - 19:04 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #211: MACO monitor robot in production line IoT project
- Wait price from Keyence
- 08:39 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #211: MACO monitor robot in production line IoT project
- [ To day ]
Meeting topic ( Request )
- Concept line production 14 Machine.
- Can monitor the operation of machines... - 17:14 ACME INDUSTRY CO.,LTD. Project progress work #163 (New): Import BOM/Modify script to manage uncontrol items and outsource details
- 17:12 THAI NIPPON FOODS CO., LTD. Project progress work #220 (In Progress): Design drawing and confirm equipment
- 17:09 THAI NIPPON FOODS CO., LTD. Project progress work #220 (Closed): Design drawing and confirm equipment
- Design drawing
- TB Box
- I/O - 17:07 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: fix Sorting And fix scan qr-code fix Inbound
Tomorrow: fix scan qr-code fix Inbound - 17:07 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
- wait log error
- 17:07 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
- wait user test
- 16:46 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105: [Coding]Data linkage function
- Develop Import Purchase order information File.
- 15:58 KEYENCE (THAILAND) CO., LTD. Sales support #219 (Closed): Keyence meeting
- [ Purpose of the meeting ]
- To update technics function and application.
- To summarize onhand projects. - 15:55 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Project progress work #218 (Closed): Wiring lan cable and power cable of LineMC30 OP80
- [ Task ]
- Wiring lan cable and power cable of LineMC30 OP80
- Config parameter SR2000
- Test trigger and monitor ... - 15:50 ADVICS MANUFACTURING (THAILAND) CO., LTD. Sales support #217 (Closed): Meeting about Loss analysis system IoT project ( New Project )
- In charge K.Tanapiwat [ Tel 086-156-8060 ]
Name production : Control
Onsite meeting Date 14/11/23 Time 10:00
- 10:57 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #216 (In Progress): NMT1&2,Trim Chassis shop To install OCR system project
- 10:56 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #216 (Closed): NMT1&2,Trim Chassis shop To install OCR system project
- [ Meeting topic ]
- A summary of the entire work scope of the project will be given to each maker who comes to the m... - 09:39 ATA CASTING TECHNOLOGY CO., LTD. Problem-Bug #215 (In Progress): Request verification of the data collection of machine
- 09:34 ATA CASTING TECHNOLOGY CO., LTD. Problem-Bug #215 (Closed): Request verification of the data collection of machine
- The customer requested that the machine be inspected for traceability regarding recording data of the Laser mark and ...
08 Nov 2023
- 22:51 A.N.I. LOGISTICS, LTD. Problem-Bug #214 (In Progress): Found the problem with the handy being able to scan the other label [STAGING AREA]
- Read and check the sequence number with the master plan on the handheld scan.
1. Modify the handheld in staging scan... - 22:40 A.N.I. LOGISTICS, LTD. Problem-Bug #214 (Closed): Found the problem with the handy being able to scan the other label [STAGING AREA]
- Problem:
Found the problem with the handy being able to scan the other label which same as the designated part but w... - 21:45 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #213 (In Progress): Proposal IoT system for Maco production line
- 21:45 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #213 (Closed): Proposal IoT system for Maco production line
- 21:42 A.N.I. LOGISTICS, LTD. Sales support #179 (Close request): Join the meeting at on-site
- 21:42 A.N.I. LOGISTICS, LTD. Sales support #179 (Confirmation request): Join the meeting at on-site
- 21:31 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #207 (Close request): Meeting about review 3D Design
- 18:34 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #197 (In Progress): Support installation HT-Label printing system Phase 2
- -install program on hanhy
- 18:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #178: Support to start using the system for Label printing system
- -update program on handy
-User support Start using with 10 machines - 17:15 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: fix TRANSFER And fix scan qr-code
Tomorrow: fix Sorting And fix scan qr-code - 16:46 TOMAS TECH CO., LTD. Project progress work #203: Test Program & Make document
- Add a list equipment to Excel (Equipment-TB_R1) send for Mr.Nattapol.
- 16:45 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105: [Coding]Data linkage function
- Develop Import Bucket quantity information File.
- 09:18 TOMAS TECH CO., LTD. Project progress work #212 (Closed): Check Relay contactor from supplier
Request price for relay from supplier.
07 Nov 2023
- 22:38 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #211 (In Progress): MACO monitor robot in production line IoT project
- 22:38 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #211 (Closed): MACO monitor robot in production line IoT project
- In-Charge K.Anawill
On-site meeting - 22:25 PANDORA PRODUCTION CO., LTD. Sales support #210 (In Progress): Auto trigger read QR-Code for Pandora project
- 22:25 PANDORA PRODUCTION CO., LTD. Sales support #210 (Closed): Auto trigger read QR-Code for Pandora project
- Install and config SRX-300 for Read QR-Code from part customer
- 22:24 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #178: Support to start using the system for Label printing system
- [Today]
-The printer has been successfully installed and tested.
-fixed application on handy
*(operator can use d... - 22:18 BIG STAR CO., LTD. Sales support #209 (In Progress): Shoe size sorting machine project Concept proposal
- 22:17 BIG STAR CO., LTD. Sales support #209 (Closed): Shoe size sorting machine project Concept proposal
- Build a conveyor belt system for sorting shoes and sorting shoe sizes for BIG Star Co.,Ltd project
- 22:05 TAKEBE (THAILAND) CO., LTD. Sales support #208 (In Progress): Takebe meeting about IoT monitoring system Project
- 22:03 TAKEBE (THAILAND) CO., LTD. Sales support #208 (Closed): Takebe meeting about IoT monitoring system Project
- People involved
Meji : Khun Kritsana chuay-rod ( Phone 080-942-9242 )
CKD : Khun Narongchai watcharenwong ( 084-694... - 21:48 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #207 (Confirmation request): Meeting about review 3D Design
- 21:47 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #207 (Closed): Meeting about review 3D Design
- Meeting about review 3D Design
- Conveyor design
- Tool robot design
- Sequence design
- Overall system - 20:47 EBISU FOODS CO., LTD. Project progress work #206 (Closed): Installation
- 16:26 EBISU FOODS CO., LTD. Project progress work #206 (Close request): Installation
- 16:21 EBISU FOODS CO., LTD. Project progress work #206 (Confirmation request): Installation
- 16:19 EBISU FOODS CO., LTD. Project progress work #206 (Closed): Installation
- Server environments installation details
- wamp server
- MSSQL Server 2019 Express
- memcached server
- other... - 20:47 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #205 (Closed): Change Web Screen 2 On TV
- 16:26 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #205 (Close request): Change Web Screen 2 On TV
- 16:11 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #205 (Confirmation request): Change Web Screen 2 On TV
- 16:08 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #205 (Closed): Change Web Screen 2 On TV
- คุณเรียวให้ทำการปรับ
Design เรื่องของสี ตามเงื่อนไขวันเวลา
1 ถ้างาน actual ทำก่อน plan ให้แสดงเป็นสีเหลือง
2 ถ้... - 20:47 TOMAS TECH CO., LTD. Sales support #202 (Closed): Meeting with the Keyence team about the new project Demo-kit.
- 16:26 TOMAS TECH CO., LTD. Sales support #202 (Close request): Meeting with the Keyence team about the new project Demo-kit.
- 16:18 TOMAS TECH CO., LTD. Sales support #202 (Confirmation request): Meeting with the Keyence team about the new project Demo-kit.
- The customer requested a case study on the Demo-Kit to present to supervisors involved in the decision to create the ...
- 09:58 TOMAS TECH CO., LTD. Sales support #202 (In Progress): Meeting with the Keyence team about the new project Demo-kit.
- 20:47 TOMAS TECH CO., LTD. Project progress work #196 (Closed): Test Program
- 16:26 TOMAS TECH CO., LTD. Project progress work #196 (Close request): Test Program
- 09:34 TOMAS TECH CO., LTD. Project progress work #196 (Confirmation request): Test Program
- 16:55 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
- wait user test
- 16:55 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
- wait log error
- 16:54 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: Fix Outbound And fix scan qr-code
Tomorrow: fix TRANSFER And fix scan qr-code - 16:46 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105: [Coding]Data linkage function
- Develop Import Item master information File.
- 16:39 ASTEER (THAILAND) CO., LTD. Project progress work #110 (In Progress): [On-site support]Support after cutover
- -Program deverlop complate
- 16:32 EBISU FOODS CO., LTD. Project progress work #16: WMS Web Development
- check Web Pegasus
สร้าง StoredProcedure ไว้รอ import data Sales Order จาก SAP
Test Manual โดยไม่มี ข้อมูล SAP - 16:24 EBISU FOODS CO., LTD. Project progress work #16: WMS Web Development
- check Web Pegasus
test add manual inbound for test trigger and store
Modify trigger and StoredProcedure - 16:17 THAI NIPPON FOODS CO., LTD. Project progress work #201 (In Progress): Summary of all equipment for use in the Machine operation monitoring systems project.
- 16:13 THAI NIPPON FOODS CO., LTD. Project progress work #201 (Confirmation request): Summary of all equipment for use in the Machine operation monitoring systems project.
- 15:42 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #95: Support installation for power supply and LAN cable for 20 points
- [07/11/2023]
- Install the power plug LAN cable connection point and Access point installation point
- Make electri... - 10:40 ACME INDUSTRY CO.,LTD. Project progress work #204 (In Progress): UAT about the WMS system and onsite support
- 10:39 ACME INDUSTRY CO.,LTD. Project progress work #204 (Closed): UAT about the WMS system and onsite support
- 09:47 TOMAS TECH CO., LTD. Project progress work #203 (Closed): Test Program & Make document
- Test pulling data PM2200 to AMX PLC
06 Nov 2023
- 22:17 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
- wait log error
- 22:17 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
- wait user test
- 22:14 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: Fix Inbound And fix scan qr-code
Tomorrow: fix Outbound And fix scan qr-code - 21:02 TOMAS TECH CO., LTD. Sales support #202 (Closed): Meeting with the Keyence team about the new project Demo-kit.
- Meeting with the Keyence team about the new project Demo-kit.
- 19:30 THAI NIPPON FOODS CO., LTD. Project progress work #201 (In Progress): Summary of all equipment for use in the Machine operation monitoring systems project.
- 19:29 THAI NIPPON FOODS CO., LTD. Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.
- Summary of all equipment for use in the Machine operation monitoring systems project.
- 18:14 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #178: Support to start using the system for Label printing system
- ASI : Label printing system phase1
27 printers were set up and tested.
The remaining 17 will be set up and tested b... - 17:28 THAI NIPPON FOODS CO., LTD. Sales support #175: EV charger installation project
- Site survey about
1. installation point
2. wiring point
3. MDB for use in EV-Charger - 17:23 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #67: Automatic label pasting machine Concept proposal
- - Quotation equipment keyence
- Quotation ATT - 16:50 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105: [Coding]Data linkage function
- Develop Import Supplier name information File.
- 16:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #141: [Task]Deverlop HMI Bekido and OA monitoring
- Design web HMI monitor bekido and PLC programming.
- 08:20 ADVICS MANUFACTURING (THAILAND) CO., LTD. Project progress work #200 (Closed): Counter RH fucntion not operation
- Problem
-output PLC HARU machine not send signal.
Action
-check signal ladder plc haru machine found ladde...
05 Nov 2023
- 22:16 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #55: handy terminal BT-A500 coding with Java Android.
- [Today]
-developmet fuction spinner workshop call api (NST_MANPOWER_ALLOC_PLAN)
-Edit fuction insert (NST_MANPOWE... - 22:12 ATA CASTING TECHNOLOGY CO., LTD. Problem-Bug #184 (Closed): Found an incorrect configure about the packing app reader number
- 21:43 ATA CASTING TECHNOLOGY CO., LTD. Problem-Bug #184 (Close request): Found an incorrect configure about the packing app reader number
- 22:12 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #172 (Closed): change item Package Type Not calurate stock card record
- 21:43 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #172 (Close request): change item Package Type Not calurate stock card record
- 19:59 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #172 (Confirmation request): change item Package Type Not calurate stock card record
- 17:25 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #172 (In Progress): change item Package Type Not calurate stock card record
- If you have source code, please attach it. If not, please let us know.
- 22:12 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (Closed): Inbound Inquiry Report problem
- 21:43 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (Close request): Inbound Inquiry Report problem
- 20:04 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (Confirmation request): Inbound Inquiry Report problem
- 22:12 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #138 (Closed): HTA_NSET completion fix bug.
- 21:43 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #138 (Close request): HTA_NSET completion fix bug.
- 17:03 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #138 (Confirmation request): HTA_NSET completion fix bug.
- 22:12 TOMAS TECH CO., LTD. Sales support #48 (Closed): Redmine email notifications
- 21:43 TOMAS TECH CO., LTD. Sales support #48 (Close request): Redmine email notifications
- 22:12 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #42 (Closed): HT-Label printing system
- 21:43 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #42 (Close request): HT-Label printing system
- 17:11 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #42 (Confirmation request): HT-Label printing system
- 21:55 EBISU FOODS CO., LTD. Project progress work #199 (In Progress): Internal test
- 21:53 EBISU FOODS CO., LTD. Project progress work #199 (Closed): Internal test
- 17:28 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #198 (Closed): HTA_NSET modification completion label function
- - modification completion label function to be able to issue FinishGood label.
*Hold the meeting for more details*... - 17:24 ACME INDUSTRY CO.,LTD. Project progress work #183 (Closed): Modify the item master to add the picture preview
- 17:24 ACME INDUSTRY CO.,LTD. Project progress work #182 (Closed): UAT about the WMS system
- 17:24 ACME INDUSTRY CO.,LTD. Project progress work #53 (Closed): UAT about the WMS system
- 17:24 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #181 (Closed): Adjust the search box size and hide/unhide the column according to filtering data (Casting/Packing)
- 17:16 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2
- -install and setup program on Handy, Server, Laptop, Printer.
-test printing label
-user training [program on handy...
04 Nov 2023
- 17:09 TOMAS TECH CO., LTD. Project progress work #196 (In Progress): Test Program
- 16:26 TOMAS TECH CO., LTD. Project progress work #196 (Closed): Test Program
- Test program PLC read data from PM2200 with use RS485 protocol. Today Complete 100%.
- 16:40 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105: [Coding]Data linkage function
- Create Table Export 3 Table.
Develop Import MRP factory master information File. - 15:19 KEYENCE (THAILAND) CO., LTD. Project progress work #187 (In Progress): Create demo unit for WD 10sets
- 14:10 TOMAS TECH CO., LTD. Project progress work #195 (In Progress): Test Program
- 14:07 TOMAS TECH CO., LTD. Project progress work #195 (Closed): Test Program
- Test program plc mitsubishi connect RS485 read data from "PM2200" (Setting protocol between PLC&PM2200.)
- 14:04 TOMAS TECH CO., LTD. Project progress work #194 (In Progress): Test Program & Outside
- Test program plc mitsubishi connect RS485 read data from "PM2200" (Setting protocol between PLC&PM2200.)
Work outsid... - 14:02 TOMAS TECH CO., LTD. Project progress work #194 (Closed): Test Program & Outside
- (8.00 - 12.00)Test program plc mitsubishi connect RS485 read data from "PM2200" (Setting protocol between PLC&PM2200....
- 13:57 ATA CASTING TECHNOLOGY CO., LTD. Problem-Bug #184 (Confirmation request): Found an incorrect configure about the packing app reader number
- The data in the database used for testing has been edited to be the same as the customer's. Then try testing the Pack...
- 13:55 TOMAS TECH CO., LTD. Project progress work #193 (In Progress): Test Program
- 13:49 TOMAS TECH CO., LTD. Project progress work #193 (Closed): Test Program
- Test program plc mitsubishi connect RS485 read data from "PM2200"
- 13:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #119 (In Progress): [Internal Design] DB and various functions, man-hour calculation
- 13:48 TOMAS TECH CO., LTD. Project progress work #192 (In Progress): Test Program & Outside
- 13:46 TOMAS TECH CO., LTD. Project progress work #192 (Closed): Test Program & Outside
- (8.00-12.00)Test program plc mitsubishi connect RS485 read data from "PM2200"
(13.30-17.00) Meeting at Gambol office. - 13:40 THAI NIPPON FOODS CO., LTD. Sales support #175 (In Progress): EV charger installation project
- 13:38 TOMAS TECH CO., LTD. Project progress work #191 (In Progress): Test Program
- 13:34 TOMAS TECH CO., LTD. Project progress work #191 (Closed): Test Program
- Test program plc mitsubishi connect RS485 read data from "PM2200"
- 09:35 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #95: Support installation for power supply and LAN cable for 20 points
- Layout line of H9J
- 09:28 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #95: Support installation for power supply and LAN cable for 20 points
- [08/11/2023]
- Setup server for label printer system
- Setting printer name and IP Address - 08:57 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #95: Support installation for power supply and LAN cable for 20 points
- [03/11/2023]
- Install the light rail And the LAN cable above the ceiling is already complete.
- The lighting contr... - 09:23 NTPT COMPANY LIMITED. Project progress work #159 (In Progress): ConMas i-Reporter teaching for NTPT staff
- The training schedule has changed as follows.
• 21 Nov 2023 08:50 – 16:50
• 22 Nov 2023 08:50 – 16:50
• ... - 09:19 TOMAS TECH CO., LTD. Sales support #48 (Confirmation request): Redmine email notifications
- [04/11/2023]
Redmine email notifications is already complete. - 08:45 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #36: UPS can not use in some position at LINE model H9J
- [31/10/2023]
- Maker BCN UPS can install UPS model 100 VCA, the remaining number to be installed is 9 units in line ...