From 01 Oct 2023 to 10 Oct 2023

10 Oct 2023

08:49 Problem-Bug #37 (Confirmation request): UPS have problem
Customer Order UPS 35 Set, Found 2 sets with problems
now BCN Fixed and delivery to customer
Atchai Konthong
08:45 Project progress work #8: Support installation for power supply and LAN cable for 50 points
- Install the electrical cabinet and electrical rail in the Chip room and connect the wires.
- Install the LAN cable...
Arunwit Isarapongporn

09 Oct 2023

23:20 Sales support #36: UPS can not use in some position at LINE model H9J
Maker was informed that it will be builds completed by the end of this month for 2 Unit transformer isolate Atchai Konthong
17:18 Project progress work #13: Additional development of 4 screens
update set auto redirect
every 5 minutes
step direct
1. screen1
2. screen3
3. screen4
4. screen2
after scre...
Yutthapong Sricha
11:06 Project progress work #13: Additional development of 4 screens
image Screen 1-4 Fixed Data date 19-Aug-2023
code in asi.zip set Data date is Current time

Code is run on loc...
Yutthapong Sricha
17:16 Project progress work #42: HT-Label printing system
Project development on Handy Terminal is complete.
[Project issues are awaiting resolution.]
-The customer would ...
Soraya Norasing
17:00 Project progress work #42 (In Progress): HT-Label printing system
Soraya Norasing
16:59 Project progress work #42 (Closed): HT-Label printing system
Label printing development project scheduled to be delivered to Asian Stanley
Implement handy terminal coding with A...
Soraya Norasing

07 Oct 2023

16:41 Sales support #36 (In Progress): UPS can not use in some position at LINE model H9J
Atchai Konthong
15:34 Sales support #36 (Closed): UPS can not use in some position at LINE model H9J
UPS model 100 VCA can't use because main power have Wiring delta type only in some position when checked with BCN tea... Atchai Konthong
16:41 Problem-Bug #37 (In Progress): UPS have problem
Atchai Konthong
15:43 Problem-Bug #37 (Closed): UPS have problem
Customer Order UPS 35 Set, Found 2 sets with problems
The UPS that was returned for inspection was found to be dam...
Atchai Konthong
11:59 Project progress work #13 (In Progress): Additional development of 4 screens
Yutthapong Sricha
11:58 Project progress work #13 (Closed): Additional development of 4 screens
Additional development of 4 screens
1.Adding actual information to production plans.
2.Adding actual information to...
Yutthapong Sricha

06 Oct 2023

23:58 Project progress work #8: Support installation for power supply and LAN cable for 50 points
Install power plugs and LAN connections in chip room for 50 point Arunwit Isarapongporn
08:54 Project progress work #8 (In Progress): Support installation for power supply and LAN cable for 50 points
today install 10 position
and tomorrow install 10point
Arunwit Isarapongporn
08:52 Project progress work #8 (Closed): Support installation for power supply and LAN cable for 50 points
Support installation for power supply and LAN cable for 50 points
- Control and coordinate between wiring or LAN ins...
Arunwit Isarapongporn
 