Activity
From 30 Sep 2023 to 09 Oct 2023
09 Oct 2023
- 23:20 Sales support #36: UPS can not use in some position at LINE model H9J
- Maker was informed that it will be builds completed by the end of this month for 2 Unit transformer isolate
- 17:18 Project progress work #13: Additional development of 4 screens
- update set auto redirect
every 5 minutes
step direct
1. screen1
2. screen3
3. screen4
4. screen2
after scre... - 11:06 Project progress work #13: Additional development of 4 screens
- image Screen 1-4 Fixed Data date 19-Aug-2023
code in asi.zip set Data date is Current time
Code is run on loc... - 17:16 Project progress work #42: HT-Label printing system
- Project development on Handy Terminal is complete.
[Project issues are awaiting resolution.]
-The customer would ... - 17:00 Project progress work #42 (In Progress): HT-Label printing system
- 16:59 Project progress work #42 (Closed): HT-Label printing system
- Label printing development project scheduled to be delivered to Asian Stanley
Implement handy terminal coding with A...
07 Oct 2023
- 16:41 Sales support #36 (In Progress): UPS can not use in some position at LINE model H9J
- 15:34 Sales support #36 (Closed): UPS can not use in some position at LINE model H9J
- UPS model 100 VCA can't use because main power have Wiring delta type only in some position when checked with BCN tea...
- 16:41 Problem-Bug #37 (In Progress): UPS have problem
- 15:43 Problem-Bug #37 (Closed): UPS have problem
- Customer Order UPS 35 Set, Found 2 sets with problems
The UPS that was returned for inspection was found to be dam... - 11:59 Project progress work #13 (In Progress): Additional development of 4 screens
- 11:58 Project progress work #13 (Closed): Additional development of 4 screens
- Additional development of 4 screens
1.Adding actual information to production plans.
2.Adding actual information to...
06 Oct 2023
- 23:58 Project progress work #8: Support installation for power supply and LAN cable for 50 points
- Install power plugs and LAN connections in chip room for 50 point
- 08:54 Project progress work #8 (In Progress): Support installation for power supply and LAN cable for 50 points
- today install 10 position
and tomorrow install 10point - 08:52 Project progress work #8 (Closed): Support installation for power supply and LAN cable for 50 points
- Support installation for power supply and LAN cable for 50 points
- Control and coordinate between wiring or LAN ins...