open[PJ260069] MCP_Belt Conveyor B,G-Line_Installation
Start date:
Due date:
Updated by Waraporn Promsopa 2 days ago
1 Installation and Commissioning
1-1 Installation and Wirring 1 set
IO check and Sofware Debug
Test Run and Machine Commistioning
Include :
Transportation and Tool
Safety check and Quality check
Stand By Production 3 Days ,2 Shift (07.00-19.40 ,19.40-07.40)
Note )
Condition : This Quotation for Dismantle ,Installation and Commissioning sales only
Delivery : By Disucssion
Validity : 30 Days
1). MCP provide Hand Lift x2 Set
2). MCP provide Fork Lift x1 Set ,Driver with lisence by Tomas tech
3). MCP provide Pallet x4 Set for move existing cv to recycle center area
4). MCP provide Sample work for support enough test
5). MCP provide Power utility to new control
6). Job scope Ref. MCP - Requirement spec