Project Date User Activity Issue Comment Hours
TOMAS TECH CO., LTD. 12 Dec 2023 Ryo Nozaki Meeting Sales support #302: YAMASA ASIA OCEANIA CO., LTD. meeting about sales Meeting with Mr.Kanuma 2.00 Actions
TOMAS TECH CO., LTD. 12 Dec 2023 Ryo Nozaki Meeting Project progress work #301: Keyence Mr.Shima meeting about New WD IoT demo unit and HRX100-300-500 Meeting with Mr.Shima 2.00 Actions
ACME INDUSTRY CO.,LTD. 12 Dec 2023 Kittisak Isarapongporn Installation Project progress work #204: UAT about the WMS system and onsite support Import the master data for SUB ASSY and CAVITY items. 2.00 Actions
MINEBEA ACCESSSOLUTIONS THAI LTD. 12 Dec 2023 Kittisak Isarapongporn Meeting Project progress work #299: Modify the specification document and confirm the design 6.00 Actions
NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 12 Dec 2023 Soraya Norasing Development Project progress work #298: Modify the functionality of the Direct Labor 8.00 Actions
THAI NIPPON FOODS CO., LTD. 12 Dec 2023 Suchin Viyasing Installation Project progress work #297: Wiring cable in the cabinet 8.00 Actions
A.N.I. LOGISTICS, LTD. 12 Dec 2023 Kamol Anekchatnuntakool Development Project progress work #130: [Coding]Inner packing screen function C# Develop Inner packing screen function C#. 8.00 Actions
ACME INDUSTRY CO.,LTD. 11 Dec 2023 Kittisak Isarapongporn Meeting Project progress work #204: UAT about the WMS system and onsite support Teaching about schedule operation for Injection staff 4.00 Actions
ACME INDUSTRY CO.,LTD. 11 Dec 2023 Ryo Nozaki Meeting Project progress work #296: Meeting with ACME INDUSTRY CO.,LTD and site survey and teaching for customer Meeting and disscuss about Injection spec 4.00 Actions
THAI NIPPON FOODS CO., LTD. 09 Dec 2023 Suchin Viyasing Installation Project progress work #360: Leave of absence. Leave of absence 8.00 Actions
ACME INDUSTRY CO.,LTD. 09 Dec 2023 Arunwit Isarapongporn Meeting Project progress work #94: [On-site support]Support after cutover Support to start using WMS the system for handy terminal & pegasus system 8.00 Actions
JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 09 Dec 2023 Woraphong Wernsantiah Development Project progress work #355: Deverlop OEE % data analysis OEE% Cal Function 8.00 Actions
TOMAS TECH CO., LTD. 09 Dec 2023 Soraya Norasing Development Sales support #20: [FY2023]Common management for Soraya day off 8.00 Actions
ACME INDUSTRY CO.,LTD. 09 Dec 2023 Kittisak Isarapongporn Development Project progress work #51: Overall project development for web and handy Create report for stock 8.00 Actions
THAI NIPPON FOODS CO., LTD. 09 Dec 2023 Nattapol Poeam Installation Project progress work #126: [Installation&On-site support] Production IoT system for TNF Installation TB-Box 2 in plant A 8.00 Actions
JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 09 Dec 2023 Santi Srichankaew Development Project progress work #124: [Installation&On-site support] Production IoT system for JATH Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% 8.00 Actions
TOMAS TECH CO., LTD. 09 Dec 2023 Ryo Nozaki Meeting Sales support #295: Interview with PG Meeting with applicant 2.00 Actions
SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 09 Dec 2023 Ryo Nozaki Meeting Project progress work #263: [Requirement definition] Handy terminal stock management system for Pegasus Meeting and site survey with Mr.Iyoda 6.00 Actions
EBISU FOODS CO., LTD. 09 Dec 2023 Anonymous Installation Project progress work #17: WMS handy terminal BT-A500 coding with Java Android. wait installation 8.00 Actions
TOMAS TECH CO., LTD. 09 Dec 2023 Kamol Anekchatnuntakool Development Project progress work #280: Check Redmine function Due date Develop Check Redmine function Due date for Send Line. 8.00 Actions
ASIAN STANLEY. INTERNATIONAL LIMITED. 09 Dec 2023 Soraya Norasing Development Problem-Bug #291: Found a problem with incorrect lot number dates. 0.00 Actions
ASIAN STANLEY. INTERNATIONAL LIMITED. 09 Dec 2023 Soraya Norasing Installation Project progress work #290: support user for update label printing handy app. 0.00 Actions
ACME INDUSTRY CO.,LTD. 08 Dec 2023 Arunwit Isarapongporn Meeting Project progress work #94: [On-site support]Support after cutover Support to start using WMS the system for handy terminal & pegasus system 8.00 Actions
JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 08 Dec 2023 Woraphong Wernsantiah Development Project progress work #355: Deverlop OEE % data analysis OEE% Cal Function 8.00 Actions
THAI NIPPON FOODS CO., LTD. 08 Dec 2023 Nattapol Poeam Design Project progress work #243: [ Task ] Program design and development Design and prepare equipment for installation TB-Box 8.00 Actions