- 16:03 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8379 (Closed): [Installation&On-site support] Traning User : Label Taping system
- 16:03 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8379 (Closed): [Installation&On-site support] Traning User : Label Taping system
- 16:01 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8378 (Closed): [Installation&On-site support] Installation : Label Taping system
- 16:01 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8378 (Closed): [Installation&On-site support] Installation : Label Taping system
- 15:48 TOYOTA BOSHOKU GATEWAY (THAILAND) CO.,LTD. Project progress work #8377 (Closed): [Internal Design] Prepare the system specification document.
- 15:48 TOYOTA BOSHOKU GATEWAY (THAILAND) CO.,LTD. Project progress work #8377 (Closed): [Internal Design] Prepare the system specification document.
- 15:47 TOYOTA BOSHOKU GATEWAY (THAILAND) CO.,LTD. Project progress work #8376 (Closed): [Requirement definition] Onsite requirement gathering with the customer for system specification design.
- 15:47 TOYOTA BOSHOKU GATEWAY (THAILAND) CO.,LTD. Project progress work #8376 (Closed): [Requirement definition] Onsite requirement gathering with the customer for system specification design.
- 15:45 MITSUI PRECISION THAI CO., LTD. Project progress work #8375 (Closed): [Coding] Stock Balance Report, Stock Movement Report, Stock Card Report To Excel.
- 15:45 MITSUI PRECISION THAI CO., LTD. Project progress work #8375 (Closed): [Coding] Stock Balance Report, Stock Movement Report, Stock Card Report To Excel.
- 15:44 PROSPIRA THAILAND CO., LTD. Project progress work #8374 (Closed): [Coding] Develop a complete API system to support integration with the ERP system.
- 15:44 PROSPIRA THAILAND CO., LTD. Project progress work #8374 (Closed): [Coding] Develop a complete API system to support integration with the ERP system.
- 15:34 SAMTECH (THAILAND) CO. LTD. Project progress work #8373 (Closed): [Requirement definition] Requirment summary meeting
- 15:34 SAMTECH (THAILAND) CO. LTD. Project progress work #8373 (Closed): [Requirement definition] Requirment summary meeting
- 15:33 UNIMICRON (THAILAND) CO., LTD. Project progress work #8372 (Closed): [Coding] Creat Script API Automation Test for Unimocron project
- 15:33 UNIMICRON (THAILAND) CO., LTD. Project progress work #8372 (Closed): [Coding] Creat Script API Automation Test for Unimocron project
- 15:32 UNIMICRON (THAILAND) CO., LTD. Project progress work #8371 (Closed): [Coding] Creat Script API Automation Test for Unimocron project
- 15:31 UNIMICRON (THAILAND) CO., LTD. Project progress work #8371 (Closed): [Coding] Creat Script API Automation Test for Unimocron project
- 15:30 MITSUI PRECISION THAI CO., LTD. Project progress work #8370 (Closed): [Coding] Start the Pegasus system testing process all over again.
- 15:29 MITSUI PRECISION THAI CO., LTD. Project progress work #8370 (Closed): [Coding] Start the Pegasus system testing process all over again.
- 15:30 MITSUI PRECISION THAI CO., LTD. Project progress work #8369 (Closed): [Coding] Enhance the Slitting function to support lbl_unit = 'M' and lbl_unit = 'M2'.
- 15:25 MITSUI PRECISION THAI CO., LTD. Project progress work #8369 (Closed): [Coding] Enhance the Slitting function to support lbl_unit = 'M' and lbl_unit = 'M2'.
- 15:30 MITSUI PRECISION THAI CO., LTD. Project progress work #8368 (Closed): [Coding] Modify the system to prevent receiving quantities exceeding the planned amount Slitting
- 15:24 MITSUI PRECISION THAI CO., LTD. Project progress work #8368 (Closed): [Coding] Modify the system to prevent receiving quantities exceeding the planned amount Slitting
- 15:30 MITSUI PRECISION THAI CO., LTD. Project progress work #8367 (Closed): [Coding] Add display of ref_parts_no and group the data by ref_parts_no on Outbound Usage
- 15:23 MITSUI PRECISION THAI CO., LTD. Project progress work #8367 (Closed): [Coding] Add display of ref_parts_no and group the data by ref_parts_no on Outbound Usage
- 15:30 MITSUI PRECISION THAI CO., LTD. Project progress work #8366 (Closed): [Coding] Update confirm outbound incorect update label status
- 15:23 MITSUI PRECISION THAI CO., LTD. Project progress work #8366 (Closed): [Coding] Update confirm outbound incorect update label status
- 15:30 MITSUI PRECISION THAI CO., LTD. Project progress work #8365 (Closed): [Coding] An issue was found where the outbound items are not being sent completely.
- 15:22 MITSUI PRECISION THAI CO., LTD. Project progress work #8365 (Closed): [Coding] An issue was found where the outbound items are not being sent completely.
- 15:18 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8364 (Closed): [Coding] adjusted the dialog lifecycle management to avoid duplicate displays
- 15:18 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8364 (Closed): [Coding] adjusted the dialog lifecycle management to avoid duplicate displays
- 15:18 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8363 (Closed): [Coding] Fix bug StopFactor screen, fix api PHP to request data when not input Machine No(ass process)
- 15:17 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8363 (Closed): [Coding] Fix bug StopFactor screen, fix api PHP to request data when not input Machine No(ass process)
- 15:18 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8362 (Closed): [Coding] Research Keyence to change sdk for device A2000
- 15:16 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #8362 (Closed): [Coding] Research Keyence to change sdk for device A2000
- 15:13 THAI INABA FOODS COMPANY LIMITED Project progress work #8361 (Closed): [Coding] Fix Re Check Detail Waiting Receive badge missing when Stock.status reset
- 15:12 THAI INABA FOODS COMPANY LIMITED Project progress work #8361 (Closed): [Coding] Fix Re Check Detail Waiting Receive badge missing when Stock.status reset
- 15:13 THAI INABA FOODS COMPANY LIMITED Project progress work #8360 (Closed): [Coding] Add Transfer Detail WH Confirm sends only Status=OK rows
- 15:11 THAI INABA FOODS COMPANY LIMITED Project progress work #8360 (Closed): [Coding] Add Transfer Detail WH Confirm sends only Status=OK rows
- 15:13 THAI INABA FOODS COMPANY LIMITED Project progress work #8359 (Closed): [Coding] Add Transfer Detail WH pallet scan + Status column (1/5-token)
- 15:11 THAI INABA FOODS COMPANY LIMITED Project progress work #8359 (Closed): [Coding] Add Transfer Detail WH pallet scan + Status column (1/5-token)
- 15:13 THAI INABA FOODS COMPANY LIMITED Project progress work #8358 (Closed): [Coding] Fix QUERY/STOCK/SCHEDULE/TRANSFER divide-by-zero when m_box = 0
- 15:10 THAI INABA FOODS COMPANY LIMITED Project progress work #8358 (Closed): [Coding] Fix QUERY/STOCK/SCHEDULE/TRANSFER divide-by-zero when m_box = 0
- 15:13 THAI INABA FOODS COMPANY LIMITED Project progress work #8357 (Closed): [Coding] Fix Packaging Inbound Schedule PO search field SearchView defaulted to iconified mode so users could not type to filter
- 15:09 THAI INABA FOODS COMPANY LIMITED Project progress work #8357 (Closed): [Coding] Fix Packaging Inbound Schedule PO search field SearchView defaulted to iconified mode so users could not type to filter
- 15:13 THAI INABA FOODS COMPANY LIMITED Project progress work #8356 (Closed): [Coding] Fix Packaging Inbound Schedule PO No filter picking PO from dialog updated UI but did not refresh the schedule list (missing set_view_data call)
- 15:09 THAI INABA FOODS COMPANY LIMITED Project progress work #8356 (Closed): [Coding] Fix Packaging Inbound Schedule PO No filter picking PO from dialog updated UI but did not refresh the schedule list (missing set_view_data call)
- 15:12 THAI INABA FOODS COMPANY LIMITED Project progress work #1511 (Closed): [Coding] QC Process
- 15:12 THAI INABA FOODS COMPANY LIMITED Project progress work #8355 (Closed): [Coding]
- 15:08 THAI INABA FOODS COMPANY LIMITED Project progress work #8355 (Closed): [Coding]
- 15:07 NKT NIPPON KONPO (THAILAND) CO., LTD Parent project #827 (Closed): [PJ240059] Warehouse system for business improvement for NKT
- 15:02 NKT NIPPON KONPO (THAILAND) CO., LTD Parent project #827 (In Progress): [PJ240059] Warehouse system for business improvement for NKT
- 15:07 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #8352 (Closed): [Coding] Fix Inbound QC-ORDER displaying wrong actual qty (SQL used TempSchedule instead of actual scanned qty)
- 15:04 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #8352 (Closed): [Coding] Fix Inbound QC-ORDER displaying wrong actual qty (SQL used TempSchedule instead of actual scanned qty)
- 15:07 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #8353 (Closed): [Coding] Fix Inbound QC-ORDER act_qty_temp double-count when TempSchedule not cleaned after confirm
- 15:05 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #8353 (Closed): [Coding] Fix Inbound QC-ORDER act_qty_temp double-count when TempSchedule not cleaned after confirm
- 15:06 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #8354 (Closed): [Coding] Fix InboundQCDetail crash NumberFormatException on empty act_qty
- 15:05 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #8354 (Closed): [Coding] Fix InboundQCDetail crash NumberFormatException on empty act_qty
- 15:06 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #8350 (Closed): [Coding] Fix Outbound Loading-Detail duplicate tire scan when order split across multiple trucks (block re-scan same QR)
- 15:03 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #8350 (Closed): [Coding] Fix Outbound Loading-Detail duplicate tire scan when order split across multiple trucks (block re-scan same QR)
- 15:06 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #8351 (Closed): [Coding] Fix Change Location scan routing: location code without dash (e.g. WT) incorrectly routed to Rack field instead of Location field
- 15:04 NKT NIPPON KONPO (THAILAND) CO., LTD Project progress work #8351 (Closed): [Coding] Fix Change Location scan routing: location code without dash (e.g. WT) incorrectly routed to Rack field instead of Location field
- 15:01 THAI MATTO NS CO., LTD. Project progress work #8349 (Closed): [Coding] Fix Waste Water Release Record and Mesh Change Record UI style to match Tool Check Sheet
- 14:57 THAI MATTO NS CO., LTD. Project progress work #8349 (Closed): [Coding] Fix Waste Water Release Record and Mesh Change Record UI style to match Tool Check Sheet
- 15:01 THAI MATTO NS CO., LTD. Project progress work #8348 (Closed): [Coding] Fix FileProvider camera Failed to find configured root by expanding file_paths.xml
- 14:56 THAI MATTO NS CO., LTD. Project progress work #8348 (Closed): [Coding] Fix FileProvider camera Failed to find configured root by expanding file_paths.xml
- 15:01 THAI MATTO NS CO., LTD. Project progress work #8347 (Closed): [Coding] Fix ToolCheckSheet init order NPE causing WebSocket null crash on second entry
- 14:56 THAI MATTO NS CO., LTD. Project progress work #8347 (Closed): [Coding] Fix ToolCheckSheet init order NPE causing WebSocket null crash on second entry
- 15:01 THAI MATTO NS CO., LTD. Project progress work #8346 (Closed): [Coding] Add ScrollView to Rotary Cutter Clearance layout so CONFIRM button does not overflow
- 14:55 THAI MATTO NS CO., LTD. Project progress work #8346 (Closed): [Coding] Add ScrollView to Rotary Cutter Clearance layout so CONFIRM button does not overflow
- 15:01 THAI MATTO NS CO., LTD. Project progress work #8345 (Closed): [Coding] Fix PO row green color to require record_count >= master_count across all checkpoints (backend GetCompletedPosCommand)
- 14:55 THAI MATTO NS CO., LTD. Project progress work #8345 (Closed): [Coding] Fix PO row green color to require record_count >= master_count across all checkpoints (backend GetCompletedPosCommand)
- 15:01 THAI MATTO NS CO., LTD. Project progress work #8344 (Closed): [Coding] Add Area Inspection Sheet dropdown to select photographed location from PreparationMaster
- 14:54 THAI MATTO NS CO., LTD. Project progress work #8344 (Closed): [Coding] Add Area Inspection Sheet dropdown to select photographed location from PreparationMaster
- 15:00 THAI MATTO NS CO., LTD. Project progress work #8343 (Closed): [Coding] Fix performance issue GET_PREPARATION_RECORD response 1.9MB due to img base64 exclude from list query
- 14:54 THAI MATTO NS CO., LTD. Project progress work #8343 (Closed): [Coding] Fix performance issue GET_PREPARATION_RECORD response 1.9MB due to img base64 exclude from list query
- 15:00 THAI MATTO NS CO., LTD. Project progress work #8342 (Closed): [Coding] Fix Area Inspection Sheet flow single photo with YES NO per session and keep history on re entry
- 14:53 THAI MATTO NS CO., LTD. Project progress work #8342 (Closed): [Coding] Fix Area Inspection Sheet flow single photo with YES NO per session and keep history on re entry
- 15:00 THAI MATTO NS CO., LTD. Project progress work #8341 (Closed): [Coding] Fix production_line flow in Blending and Extruding Process load MasterProductionCapacity by correct line
- 14:53 THAI MATTO NS CO., LTD. Project progress work #8341 (Closed): [Coding] Fix production_line flow in Blending and Extruding Process load MasterProductionCapacity by correct line
- 15:00 THAI MATTO NS CO., LTD. Project progress work #8340 (Closed): [Coding] Fix Tool Check Sheet UI style to match Check Around Machine Report
- 14:52 THAI MATTO NS CO., LTD. Project progress work #8340 (Closed): [Coding] Fix Tool Check Sheet UI style to match Check Around Machine Report
- 15:00 THAI MATTO NS CO., LTD. Project progress work #8339 (Closed): [Coding] Add Group name display on each RECORD row to distinguish multi scan across different groups
- 14:52 THAI MATTO NS CO., LTD. Project progress work #8339 (Closed): [Coding] Add Group name display on each RECORD row to distinguish multi scan across different groups
- 15:00 THAI MATTO NS CO., LTD. Project progress work #8338 (Closed): [Coding] Fix Group selection dialog to appear only when scanning RECORD QR with prefilled form per group
- 14:51 THAI MATTO NS CO., LTD. Project progress work #8338 (Closed): [Coding] Fix Group selection dialog to appear only when scanning RECORD QR with prefilled form per group
- 15:00 THAI MATTO NS CO., LTD. Project progress work #8337 (Closed): [Coding] Fix Tool Check Sheet flow single photo with YES NO per session and keep history on re entry
- 14:50 THAI MATTO NS CO., LTD. Project progress work #8337 (Closed): [Coding] Fix Tool Check Sheet flow single photo with YES NO per session and keep history on re entry
- 15:00 THAI MATTO NS CO., LTD. Project progress work #8336 (Closed): [Coding] Add Return R/M & Loss Record to Packing menu
- 14:50 THAI MATTO NS CO., LTD. Project progress work #8336 (Closed): [Coding] Add Return R/M & Loss Record to Packing menu
- 15:00 THAI MATTO NS CO., LTD. Project progress work #8335 (Closed): [Coding] Add Rotary Cutter/Fixed Blade/Vent Port Inspection before Data Record in Extruding Process
- 14:49 THAI MATTO NS CO., LTD. Project progress work #8335 (Closed): [Coding] Add Rotary Cutter/Fixed Blade/Vent Port Inspection before Data Record in Extruding Process
- 14:59 THAI MATTO NS CO., LTD. Project progress work #8334 (Closed): [Coding] Add Mesh Change Record (mesh size + stop detail + timestamp)
- 14:49 THAI MATTO NS CO., LTD. Project progress work #8334 (Closed): [Coding] Add Mesh Change Record (mesh size + stop detail + timestamp)
- 14:59 THAI MATTO NS CO., LTD. Project progress work #8333 (Closed): [Coding] Add Waste Water Trap Tank Record (water level + timestamp)
- 14:48 THAI MATTO NS CO., LTD. Project progress work #8333 (Closed): [Coding] Add Waste Water Trap Tank Record (water level + timestamp)
- 14:59 THAI MATTO NS CO., LTD. Project progress work #8332 (Closed): [Coding] Add Rotary Cutter Clearance Check Sheet with backend reference image
- 14:48 THAI MATTO NS CO., LTD. Project progress work #8332 (Closed): [Coding] Add Rotary Cutter Clearance Check Sheet with backend reference image
- 14:59 THAI MATTO NS CO., LTD. Project progress work #8331 (Closed): [Coding] Add Area Inspection Sheet to Extruder Preparation
- 14:47 THAI MATTO NS CO., LTD. Project progress work #8331 (Closed): [Coding] Add Area Inspection Sheet to Extruder Preparation
- 14:59 THAI MATTO NS CO., LTD. Project progress work #8330 (Closed): [Coding] Multi-Group selection dialog in Blending/Extruding Process + filter SETUP/RECORD by group
- 14:42 THAI MATTO NS CO., LTD. Project progress work #8330 (Closed): [Coding] Multi-Group selection dialog in Blending/Extruding Process + filter SETUP/RECORD by group
- 14:59 THAI MATTO NS CO., LTD. Project progress work #8328 (Closed): [Coding] RM Receive qty bug fix RmLocation sent label's original KG instead of user-entered bags × KG/bag
- 14:39 THAI MATTO NS CO., LTD. Project progress work #8328 (Closed): [Coding] RM Receive qty bug fix RmLocation sent label's original KG instead of user-entered bags × KG/bag
- 14:59 THAI MATTO NS CO., LTD. Project progress work #8327 (Closed): [Coding] Fix LoadPreparaMasterCheck add requirePhoto for check_around, force photo before YES/NO, reset per checkpoint
- 14:38 THAI MATTO NS CO., LTD. Project progress work #8327 (Closed): [Coding] Fix LoadPreparaMasterCheck add requirePhoto for check_around, force photo before YES/NO, reset per checkpoint
- 14:59 THAI MATTO NS CO., LTD. Project progress work #8326 (Closed): [Coding] Fix Bag Schedule CMD from PRE_BLEND to BAG_SCHEDULE
- 14:38 THAI MATTO NS CO., LTD. Project progress work #8326 (Closed): [Coding] Fix Bag Schedule CMD from PRE_BLEND to BAG_SCHEDULE
- 14:59 THAI MATTO NS CO., LTD. Project progress work #8325 (Closed): [Coding] Fix OCR 2-char checkpoint not matching (VH skipped by guard <3, changed to <2)
- 14:28 THAI MATTO NS CO., LTD. Project progress work #8325 (Closed): [Coding] Fix OCR 2-char checkpoint not matching (VH skipped by guard <3, changed to <2)
- 14:58 THAI MATTO NS CO., LTD. Project progress work #8324 (Closed): [Coding] Add Packing submenu (Receive / Process / Return) with 2 new Activities + layouts
- 14:23 THAI MATTO NS CO., LTD. Project progress work #8324 (Closed): [Coding] Add Packing submenu (Receive / Process / Return) with 2 new Activities + layouts
- 14:58 THAI MATTO NS CO., LTD. Project progress work #8323 (Closed): [Coding] Add Extruder Preparation button + submenu (Check Around / Tool Check Sheet / Rotary Cutter)
- 14:20 THAI MATTO NS CO., LTD. Project progress work #8323 (Closed): [Coding] Add Extruder Preparation button + submenu (Check Around / Tool Check Sheet / Rotary Cutter)
- 14:58 THAI MATTO NS CO., LTD. Project progress work #8322 (Closed): [Coding] Remove A4 TagLabel print from Picking Resin + Pigment, keep SATO Mini only, web handles A4 now
- 14:20 THAI MATTO NS CO., LTD. Project progress work #8322 (Closed): [Coding] Remove A4 TagLabel print from Picking Resin + Pigment, keep SATO Mini only, web handles A4 now
- 14:58 THAI MATTO NS CO., LTD. Project progress work #8321 (Closed): [Coding] Auto-update version check at login, download & install new APK from server
- 14:19 THAI MATTO NS CO., LTD. Project progress work #8321 (Closed): [Coding] Auto-update version check at login, download & install new APK from server
- 14:58 THAI MATTO NS CO., LTD. Project progress work #8320 (Closed): [Coding] Preparation Check fix premature complete for Super Floater/Tumbler count-based comparison instead of content-based
- 14:18 THAI MATTO NS CO., LTD. Project progress work #8320 (Closed): [Coding] Preparation Check fix premature complete for Super Floater/Tumbler count-based comparison instead of content-based
- 14:58 THAI MATTO NS CO., LTD. Project progress work #8319 (Closed): [Coding] Outbound Blending scan BAG QR (10-token) from OM-Mixer/Pre-Blend + fix PREPARED status flow
- 14:18 THAI MATTO NS CO., LTD. Project progress work #8319 (Closed): [Coding] Outbound Blending scan BAG QR (10-token) from OM-Mixer/Pre-Blend + fix PREPARED status flow
- 14:58 THAI MATTO NS CO., LTD. Project progress work #8318 (Closed): [Coding] WS Verification NG detail dialog on Confirm with reason + "Confirm Anyway"
- 14:17 THAI MATTO NS CO., LTD. Project progress work #8318 (Closed): [Coding] WS Verification NG detail dialog on Confirm with reason + "Confirm Anyway"
- 14:58 THAI MATTO NS CO., LTD. Project progress work #8317 (Closed): [Coding] WS Verification add location column to report (via trigger join WS_master.Area)
- 14:16 THAI MATTO NS CO., LTD. Project progress work #8317 (Closed): [Coding] WS Verification add location column to report (via trigger join WS_master.Area)
- 14:57 THAI MATTO NS CO., LTD. Project progress work #8316 (Closed): [Coding] OCR flexible match pipe-alternation + normalize [\s\-_] — bag prints any separator
- 14:16 THAI MATTO NS CO., LTD. Project progress work #8316 (Closed): [Coding] OCR flexible match pipe-alternation + normalize [\s\-_] — bag prints any separator
- 14:57 THAI MATTO NS CO., LTD. Project progress work #8315 (Closed): [Coding] RM Receive recommend same part_no locations at top (green), others A-Z
- 14:15 THAI MATTO NS CO., LTD. Project progress work #8315 (Closed): [Coding] RM Receive recommend same part_no locations at top (green), others A-Z
- 14:57 THAI MATTO NS CO., LTD. Project progress work #8314 (Closed): [Coding] Fix LabelStatus.lbl_production_lot missing column (LABEL/DETAIL broken on staging)
- 14:14 THAI MATTO NS CO., LTD. Project progress work #8314 (Closed): [Coding] Fix LabelStatus.lbl_production_lot missing column (LABEL/DETAIL broken on staging)
- 14:57 THAI MATTO NS CO., LTD. Project progress work #8313 (Closed): [Coding] OCR Scanner end-to-end enable CodeType.ocr, dynamic regex from checkpoints, multi-substring getDataList, contains match
- 14:09 THAI MATTO NS CO., LTD. Project progress work #8313 (Closed): [Coding] OCR Scanner end-to-end enable CodeType.ocr, dynamic regex from checkpoints, multi-substring getDataList, contains match
- 14:57 THAI MATTO NS CO., LTD. Project progress work #8312 (Closed): [Coding] PigmentConfirm card stays green after auto confirmBag (status "SCAN" when act_qty > 0)
- 14:08 THAI MATTO NS CO., LTD. Project progress work #8312 (Closed): [Coding] PigmentConfirm card stays green after auto confirmBag (status "SCAN" when act_qty > 0)
- 14:57 THAI MATTO NS CO., LTD. Project progress work #8311 (Closed): [Coding] Preparation flow fixes hide button only on full 3/3, resume from next undone sub-item, auto-show Overall Report on finish, fix Overall Report rows showing "null"
- 14:07 THAI MATTO NS CO., LTD. Project progress work #8311 (Closed): [Coding] Preparation flow fixes hide button only on full 3/3, resume from next undone sub-item, auto-show Overall Report on finish, fix Overall Report rows showing "null"
- 14:57 THAI MATTO NS CO., LTD. Project progress work #8310 (Closed): [Coding] Restructure menus reorder Blending, move Tool Check Sheet into new Blending Preparation submenu, move Verification from Main to Blending Preparation + Weighting Menu
- 14:07 THAI MATTO NS CO., LTD. Project progress work #8310 (Closed): [Coding] Restructure menus reorder Blending, move Tool Check Sheet into new Blending Preparation submenu, move Verification from Main to Blending Preparation + Weighting Menu
- 14:41 THAI MATTO NS CO., LTD. Project progress work #8329 (Closed): [Coding] Tool Check Sheet add PO selection + save Grade/Color/Lot/User/Time
- 14:40 THAI MATTO NS CO., LTD. Project progress work #8329 (Closed): [Coding] Tool Check Sheet add PO selection + save Grade/Color/Lot/User/Time
- 14:06 THAI MATTO NS CO., LTD. Project progress work #8309 (Closed): [Coding] Suppress "Not found schedule" toast on init
- 14:06 THAI MATTO NS CO., LTD. Project progress work #8309 (Closed): [Coding] Suppress "Not found schedule" toast on init
- 14:06 THAI MATTO NS CO., LTD. Project progress work #8308 (Closed): [Coding] RM Receive replace Lot with Customer + add Supplier row
- 14:05 THAI MATTO NS CO., LTD. Project progress work #8308 (Closed): [Coding] RM Receive replace Lot with Customer + add Supplier row
- 14:02 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8306 (Closed): [Coding] Confirm and Clear bottom bar pattern across 8 activities (QcPart, ReturnPart, HoldUnhold, NgCart, NgFromQc, FulfilPart, SwitchingPart, Shipping, SwitchingCart)
- 13:58 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8306 (Closed): [Coding] Confirm and Clear bottom bar pattern across 8 activities (QcPart, ReturnPart, HoldUnhold, NgCart, NgFromQc, FulfilPart, SwitchingPart, Shipping, SwitchingCart)
- 14:02 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8305 (Closed): [Coding] Production Live filter NG rows at SP source, system ingests only OK parts from tester / PLC
- 13:58 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8305 (Closed): [Coding] Production Live filter NG rows at SP source, system ingests only OK parts from tester / PLC
- 14:02 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8304 (Closed): [Coding] Switching Part NG transfer, defective part NG flag follows the swapped part to source cart (refinement of bidirectional swap)
- 13:57 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8304 (Closed): [Coding] Switching Part NG transfer, defective part NG flag follows the swapped part to source cart (refinement of bidirectional swap)
- 14:02 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8303 (Closed): [Coding] NG Cart qty semantics revision, qty_ok unchanged on N to NG and qty_ng tracks defects (physical count of cart kept)
- 13:56 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8303 (Closed): [Coding] NG Cart qty semantics revision, qty_ok unchanged on N to NG and qty_ng tracks defects (physical count of cart kept)
- 14:02 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8302 (Closed): [Coding] Shipping NG-gate, block cart with qty_ng greater than 0 from shipping scan (safety)
- 13:56 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8302 (Closed): [Coding] Shipping NG-gate, block cart with qty_ng greater than 0 from shipping scan (safety)
- 14:01 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8301 (Closed): [Coding] Bidirectional Switching Part swap (source cart bookkeeping symmetric, both carts reflect change)
- 13:55 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8301 (Closed): [Coding] Bidirectional Switching Part swap (source cart bookkeeping symmetric, both carts reflect change)
- 14:01 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8300 (Closed): [Coding] Production History card color reflects held_part_count + hide Start Production in Hold modes
- 13:55 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8300 (Closed): [Coding] Production History card color reflects held_part_count + hide Start Production in Hold modes
- 14:01 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8299 (Closed): [Coding] Fix cart_parts qty_ok authoritative (from cart.qty_ok) + UNION cross-cart rows + MOVED row serial-fallback JOIN
- 13:54 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8299 (Closed): [Coding] Fix cart_parts qty_ok authoritative (from cart.qty_ok) + UNION cross-cart rows + MOVED row serial-fallback JOIN
- 14:01 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8298 (Closed): [Coding] Cross-cart Return Part scan part only, no cart context, SP auto-derives source cart
- 13:53 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8298 (Closed): [Coding] Cross-cart Return Part scan part only, no cart context, SP auto-derives source cart
- 14:01 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8297 (Closed): [Coding] List filter consistency 5 activities (QcPart, ReturnPart, NgCart, HoldUnhold, Fulfil, Switching), hide NG/MOVED/QC rows
- 13:53 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8297 (Closed): [Coding] List filter consistency 5 activities (QcPart, ReturnPart, NgCart, HoldUnhold, Fulfil, Switching), hide NG/MOVED/QC rows
- 14:01 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8296 (Closed): [Coding] Add hold_source columns (production_log + cart), track PRODUCTION vs SHIPPING origin on all Hold ops
- 13:52 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8296 (Closed): [Coding] Add hold_source columns (production_log + cart), track PRODUCTION vs SHIPPING origin on all Hold ops
- 14:01 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8295 (Closed): [Coding] NG menu refactor, submenu (Cart / QC Part) + "Product NG" reason picker screen + QC Operating list
- 13:51 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8295 (Closed): [Coding] NG menu refactor, submenu (Cart / QC Part) + "Product NG" reason picker screen + QC Operating list
- 14:01 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8294 (Closed): [Coding] QC Pool architecture N to Q to Return/NG state machine + audit columns (picked_at/by, resolved_at/by, qc_resolution)
- 13:51 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8294 (Closed): [Coding] QC Pool architecture N to Q to Return/NG state machine + audit columns (picked_at/by, resolved_at/by, qc_resolution)
- 14:00 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8293 (Closed): [Coding] Settings Card style redesign with 3 sections and button hierarchy
- 13:50 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8293 (Closed): [Coding] Settings Card style redesign with 3 sections and button hierarchy
- 14:00 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8292 (Closed): [Coding] Deep Teal header for Shipping flow and dual flow swap on SwitchingPart
- 13:49 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8292 (Closed): [Coding] Deep Teal header for Shipping flow and dual flow swap on SwitchingPart
- 14:00 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8291 (Closed): [Coding] Wire Date From and Date To filter on Production History
- 13:48 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8291 (Closed): [Coding] Wire Date From and Date To filter on Production History
- 14:00 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8290 (Closed): [Coding] Fix Date showing today by using first_scan_at via parseServerDate
- 13:48 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8290 (Closed): [Coding] Fix Date showing today by using first_scan_at via parseServerDate
- 14:00 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8289 (Closed): [Coding] Fix qty_ok showing 0 on History by wiring qtyOkSnapshot from cart active
- 13:47 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8289 (Closed): [Coding] Fix qty_ok showing 0 on History by wiring qtyOkSnapshot from cart active
- 14:00 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8288 (Closed): [Coding] BuildConfig defaults and Login pre-flight to prevent prod to staging data leak
- 13:46 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8288 (Closed): [Coding] BuildConfig defaults and Login pre-flight to prevent prod to staging data leak
- 14:00 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8307 (Closed): [Coding] Unify Fulfil Part as Return Part, same SP and same global QC pool UI and same audit columns
- 13:59 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8307 (Closed): [Coding] Unify Fulfil Part as Return Part, same SP and same global QC pool UI and same audit columns
- 13:59 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8287 (Closed): [Coding] Fix part hold duplicate row when part was switched + tag_serial overflow on Switching NG
- 13:45 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8287 (Closed): [Coding] Fix part hold duplicate row when part was switched + tag_serial overflow on Switching NG
- 13:59 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8286 (Closed): [Coding] Migrate handy_api business logic to 26 stored procedures with transaction + race-condition handling
- 13:44 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8286 (Closed): [Coding] Migrate handy_api business logic to 26 stored procedures with transaction + race-condition handling
- 13:59 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8285 (Closed): [Coding] Add R2 menus: Hold/Un-Hold Part, Shipping Hold Cart, Switching NG, Fulfil Part
- 13:44 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8285 (Closed): [Coding] Add R2 menus: Hold/Un-Hold Part, Shipping Hold Cart, Switching NG, Fulfil Part
- 13:38 SAMTECH (THAILAND) CO. LTD. Project progress work #8284 (Closed): [Coding] Schedule > Materials Receive Job Note UI
- 13:37 SAMTECH (THAILAND) CO. LTD. Project progress work #8284 (Closed): [Coding] Schedule > Materials Receive Job Note UI
- 13:37 SAMTECH (THAILAND) CO. LTD. Project progress work #8283 (Closed): [Coding] Schedule > Inbound Schedule Detail
- 13:36 SAMTECH (THAILAND) CO. LTD. Project progress work #8283 (Closed): [Coding] Schedule > Inbound Schedule Detail
- 13:37 SAMTECH (THAILAND) CO. LTD. Project progress work #8282 (Closed): [Coding] Schedule > Outbound Delivery Order
- 13:31 SAMTECH (THAILAND) CO. LTD. Project progress work #8282 (Closed): [Coding] Schedule > Outbound Delivery Order
- 13:24 TOYOTA BOSHOKU GATEWAY (THAILAND) CO.,LTD. Project progress work #8281 (Closed): [Internal Design] PR part list (Handy BT-A500 , and PC server(ขอใบเสนออยู่))
- 13:24 TOYOTA BOSHOKU GATEWAY (THAILAND) CO.,LTD. Project progress work #8281 (Closed): [Internal Design] PR part list (Handy BT-A500 , and PC server(ขอใบเสนออยู่))
- 13:22 KEYENCE (THAILAND) CO., LTD. Project progress work #8280 (Closed): [Requirement definition] PR part list
- 13:22 KEYENCE (THAILAND) CO., LTD. Project progress work #8280 (Closed): [Requirement definition] PR part list
- 13:20 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8279 (Closed): [Installation&On-site support] Installation
- 13:19 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8279 (Closed): [Installation&On-site support] Installation
- 13:18 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8278 (Closed): [Internal Design] Assy Panel
- 13:18 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8278 (Closed): [Internal Design] Assy Panel
- 13:18 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8277 (Closed): [Internal Design] PR part list
- 13:14 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8277 (Closed): [Internal Design] PR part list
- 13:11 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8276 (Closed): [Internal Design] Drawing Panel Layout
- 13:10 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8276 (Closed): [Internal Design] Drawing Panel Layout
- 13:10 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8275 (Closed): [Internal Design] PR for VS
- 13:09 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8275 (Closed): [Internal Design] PR for VS
- 13:10 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8274 (Closed): [Internal Design] PR for PLC
- 13:10 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8274 (Close request): [Internal Design] PR for PLC
- 13:08 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8274 (Closed): [Internal Design] PR for PLC
- 12:00 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8273 (Closed): [Installation&On-site support] Inspection Motor lifter E line
- 11:59 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8273 (Closed): [Installation&On-site support] Inspection Motor lifter E line
- 12:00 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8272 (Closed): [Installation&On-site support] Inspection Motor lifter D line
- 11:59 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8272 (Closed): [Installation&On-site support] Inspection Motor lifter D line
- 12:00 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8271 (Closed): [Installation&On-site support] Inspection Motor lifter C line
- 11:58 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8271 (Closed): [Installation&On-site support] Inspection Motor lifter C line
- 11:57 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8270 (Closed): [Coding] Test RRemaining Job Inspection MC
- 11:56 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8270 (Closed): [Coding] Test RRemaining Job Inspection MC
- 11:57 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8269 (Closed): [Coding] Installation for Inspection Machine and est Run for Inspection Machine
- 11:55 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8269 (Closed): [Coding] Installation for Inspection Machine and est Run for Inspection Machine
- 11:57 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8268 (Closed): [Coding] Test Run for Inspection Machine
- 11:54 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8268 (Closed): [Coding] Test Run for Inspection Machine
- 11:54 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8267 (Closed): [Coding] Assembly for Inspection Machine
- 11:54 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8267 (Closed): [Coding] Assembly for Inspection Machine
- 11:48 FTS AUTOMOTIVE (THAILAND) CO.,LTD Parent project #1279 (Closed): [PJ250040] FTS TH Blow Mold#2 IoT system 100%
- 11:47 FTS AUTOMOTIVE (THAILAND) CO.,LTD Parent project #1279 (In Progress): [PJ250040] FTS TH Blow Mold#2 IoT system 100%
- 11:48 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #1283 (Closed): [Installation&On-site support]
- 11:47 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #1283 (In Progress): [Installation&On-site support]
- 11:48 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #8266 (Closed): [Installation&On-site support] Onsite survey for addition function.
- 11:48 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #8266 (Closed): [Installation&On-site support] Onsite survey for addition function.
- 11:46 FTS AUTOMOTIVE (THAILAND) CO.,LTD Parent project #2812 (Closed): [PJ250089] Traceability system for Welding 740
- 11:43 FTS AUTOMOTIVE (THAILAND) CO.,LTD Parent project #2812 (In Progress): [PJ250089] Traceability system for Welding 740
- 11:46 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2816 (Closed): [Installation&On-site support]
- 11:45 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2816 (In Progress): [Installation&On-site support]
- 11:46 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2815 (Closed): [Coding]
- 11:44 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2815 (In Progress): [Coding]
- 11:46 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #8265 (Closed): [Installation&On-site support] Onsite fix issue of CSV file and FTP Client Programming.
- 11:45 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #8265 (Closed): [Installation&On-site support] Onsite fix issue of CSV file and FTP Client Programming.
- 11:44 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #8264 (Closed): [Coding] Fix issue of CSV file and FTP Client Programming.
- 11:44 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #8264 (Closed): [Coding] Fix issue of CSV file and FTP Client Programming.
- 11:40 DAIFUKU (THAILAND) LTD. Project progress work #8263 (Closed): [Installation&On-site support] Onsite fix PLC function.
- 11:40 DAIFUKU (THAILAND) LTD. Project progress work #8263 (Closed): [Installation&On-site support] Onsite fix PLC function.
- 11:38 THAI ASAHI DENSO CO., LTD. Project progress work #8262 (Closed): [Requirement definition] Onsite Technical Commissioning.
- 11:38 THAI ASAHI DENSO CO., LTD. Project progress work #8262 (Closed): [Requirement definition] Onsite Technical Commissioning.
- 11:37 THAI ASAHI DENSO CO., LTD. Project progress work #2723 (In Progress): [Requirement definition]
- 11:36 THAI ASAHI DENSO CO., LTD. Parent project #2722 (In Progress): [PJ250068] IoT system for THAI ASAHI DENSO CO., LTD additional cost
- 11:24 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8261 (Closed): [Installation&On-site support] Installation
- 11:24 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8261 (Closed): [Installation&On-site support] Installation
- 11:23 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8260 (Closed): [Coding] Operation manual
- 11:23 SIAM GOSHI MANUFACTURING CO.,LTD. Project progress work #8260 (Closed): [Coding] Operation manual
- 11:21 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8259 (Closed): [Installation&On-site support] BCR Camera Configuration and test
- 11:21 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8259 (Closed): [Installation&On-site support] BCR Camera Configuration and test
- 11:20 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8258 (Closed): [Coding] Internal Test
- 11:20 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8258 (Closed): [Coding] Internal Test
- 11:18 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8257 (Closed): [Installation&On-site support] Installation and configuration
- 11:18 TOYO ADVANCED TECHNOLOGIES AUTOMOBILE COMPONENTS (THAILAND) CO., LTD. Project progress work #8257 (Closed): [Installation&On-site support] Installation and configuration
- 11:16 THAI ASAHI DENSO CO., LTD. Project progress work #8256 (Closed): [Requirement definition] Work Order PLC Issue update
- 11:16 THAI ASAHI DENSO CO., LTD. Project progress work #8256 (Closed): [Requirement definition] Work Order PLC Issue update
- 11:15 THAI ASAHI DENSO CO., LTD. Project progress work #8255 (Closed): [Requirement definition] Issue Meetting Before Commistioning
- 11:15 THAI ASAHI DENSO CO., LTD. Project progress work #8255 (Closed): [Requirement definition] Issue Meetting Before Commistioning
- 11:14 THAI ASAHI DENSO CO., LTD. Project progress work #1285 (In Progress): [Requirement definition]
- 11:13 THAI ASAHI DENSO CO., LTD. Project progress work #2953 (Closed): [Installation&On-site support] Production monitoring system UAT
- 11:12 THAI ASAHI DENSO CO., LTD. Project progress work #6524 (Closed): [Installation&On-site support] Get commet and edit in end phase
- 11:12 THAI ASAHI DENSO CO., LTD. Project progress work #6523 (Closed): [Installation&On-site support] Production Line UAT
- 11:11 THAI ASAHI DENSO CO., LTD. Project progress work #8254 (Closed): [Installation&On-site support] Commistioning
- 11:11 THAI ASAHI DENSO CO., LTD. Project progress work #8254 (Closed): [Installation&On-site support] Commistioning
- 10:38 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8253 (Closed): [Requirement definition] Check inspection document
- 10:38 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8253 (Closed): [Requirement definition] Check inspection document
- 10:15 SHINDENGEN (THAILAND) CO., LTD. Project progress work #8252 (Closed): [Coding] Fix issues data export line 5
- 10:14 SHINDENGEN (THAILAND) CO., LTD. Project progress work #8252 (Closed): [Coding] Fix issues data export line 5
- 10:14 SHINDENGEN (THAILAND) CO., LTD. Project progress work #8251 (Closed): [Coding] The graph displayed on the screen is unstable; it's flickering constantly
- 10:13 SHINDENGEN (THAILAND) CO., LTD. Project progress work #8251 (Closed): [Coding] The graph displayed on the screen is unstable; it's flickering constantly
- 10:13 SHINDENGEN (THAILAND) CO., LTD. Project progress work #2786 (In Progress): [Coding]
- 10:12 SHINDENGEN (THAILAND) CO., LTD. Parent project #2783 (In Progress): [PJ250078] Operation monitoring system for ShinDengen 100% (DAIICHI JITSUGYO (THAILAND) CO., LTD)
- 10:12 SHINDENGEN INDONESIA Project progress work #6441 (Closed): [Installation&On-site support] Go live
- 10:12 SHINDENGEN INDONESIA Project progress work #6440 (Closed): [Installation&On-site sopport] Teaching for Go live
- 10:12 SHINDENGEN INDONESIA Project progress work #6439 (Closed): [Installation&On-site support] Supports user feedback
- 10:11 SHINDENGEN INDONESIA Project progress work #6438 (Closed): [Installation&On-site support] User Testing & Trial
- 10:10 SHINDENGEN INDONESIA Project progress work #4414 (Closed): [Installation&On-site support]
- 10:09 SHINDENGEN INDONESIA Project progress work #8250 (Closed): [Coding] Fix issue
- 10:09 SHINDENGEN INDONESIA Project progress work #8250 (Closed): [Coding] Fix issue
- 10:07 NTPT COMPANY LIMITED. Project progress work #1303 (Closed): [Coding]
- 10:07 NTPT COMPANY LIMITED. Project progress work #1302 (Closed): [Coding]
- 10:07 NTPT COMPANY LIMITED. Project progress work #8249 (Closed): [Coding] Fix issue php error
- 10:06 NTPT COMPANY LIMITED. Project progress work #8249 (Closed): [Coding] Fix issue php error
- 09:32 MEIJI (THAILAND) CO., LTD. Parent project #7164 (Closed): [PJ260074] Adjusting the installation position of the CPALL x DAIFUKU SR5000
- 09:31 MEIJI (THAILAND) CO., LTD. Project progress work #7168 (Closed): [Installation&On-site support]
- 09:31 MEIJI (THAILAND) CO., LTD. Project progress work #7167 (Closed): [Coding]
- 09:31 MEIJI (THAILAND) CO., LTD. Project progress work #7166 (Closed): [Internal Design]
- 09:30 MEIJI (THAILAND) CO., LTD. Project progress work #7165 (Closed): [Requirement definition]
- 09:11 AH BRAKE (THAILAND) CO., LTD. Parent project #8248: [PJ260098] MT MOC traceability packing system for AH Brake for Line1 and Line2 Label
- 1 Hardware
1-1 Label Size : P138.11 MM x W75 MM. 20 Roll
Material : ART TAG 80G NON GLUE
Packing: 1000 PCS./ ROLL
... - 09:09 AH BRAKE (THAILAND) CO., LTD. Parent project #8248 (In Progress): [PJ260098] MT MOC traceability packing system for AH Brake for Line1 and Line2 Label
- 09:08 NANKAI EXPRESS (THAILAND) CO.,LTD. Parent project #8247: [PJ260097] ESET & Cisco MX67
- 1 Software
1-1 ESET PROTECT Advanced - New 1 Year - LIC 14 unit
2 Hardware
2-1 MX67-HW Cisco Meraki MX67 Router 2 ... - 09:06 NANKAI EXPRESS (THAILAND) CO.,LTD. Parent project #8247 (In Progress): [PJ260097] ESET & Cisco MX67
23 May 2026
- 09:32 YAMATO ELECTRIC (THAILAND) CO., LTD. Parent project #8246: [PJ260096] Label
- 1 LABEL FOR WS PRINTER SIZE 85*55 MM 30 Pcs
560PCS/ROLL
2 CARBON RIBBON WAX RESIN T110A SIZE 76.2 MM* 300M 15 Pcs - 09:31 YAMATO ELECTRIC (THAILAND) CO., LTD. Parent project #8246 (In Progress): [PJ260096] Label
- 09:29 A.N.I. LOGISTICS, LTD. Parent project #8245: [PJ260095] Printer
- 1 Hardware
1-1 RINT HEAD FOR WS408TT P/N: 59-WT205-001 1 UNIT
1-2 PLATEN FOR WCAOSTT D/N: 0.23.0 PLATEN FOR WS408T... - 09:27 A.N.I. LOGISTICS, LTD. Parent project #8245 (In Progress): [PJ260095] Printer
22 May 2026
- 16:17 FTS AUTOMOTIVE (THAILAND) CO.,LTD Parent project #2812 (Closed): [PJ250089] Traceability system for Welding 740
- 16:17 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2815 (Closed): [Coding]
- 16:17 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2814 (Closed): [Internal Design]
- 16:17 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2813 (Closed): [Requirement definition]
- 16:17 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #2816 (Closed): [Installation&On-site support]
- 16:17 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #7202 (Closed): [Installation&On-site support] Onsite install and testing program
- 16:15 SHINDENGEN (THAILAND) CO., LTD. Parent project #3015 (Closed): [PJ250090] Operation monitoring system for ShinDengen Customization fee
- 16:15 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3305 (Closed): [Installation&On-site support]
- 16:15 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3335 (Closed): [Installation&On-site support] Go live
- 16:15 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3334 (Closed): [Installation&On-site support] Teaching for Go live
- 16:15 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3333 (Closed): [Installation&On-site support] Supports user feedback
- 16:15 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3332 (Closed): [Installation&Onsite support] User Testing & Trial
- 16:15 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3331 (Closed): [Installation&On-site support] Teaching for UT
- 16:15 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3330 (Closed): [Installation&On-site support] Software installation
- 16:15 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3329 (Closed): [Installation&On-site support] Line 5: Installation / Wiring / Config / IO Check
- 16:15 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3328 (Closed): [Installation&On-site support] Line 4: Installation / Wiring / Config / IO Check
- 16:14 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3327 (Closed): [Installation&On-site support] Line 3: Installation / Wiring / Config / IO Check
- 16:06 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3304 (Closed): [Coding]
- 16:06 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3303 (Closed): [Internal Design]
- 16:06 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3325 (Closed): [Coding] Web application installation Line 3,4,5
- 16:06 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3324 (Closed): [Coding] DB Setup and modification Line 3,4,5
- 16:06 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3323 (Closed): [Coding] Web application installation Line 2
- 16:06 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3322 (Closed): [Coding] DB Seteup and modification Line 2
- 16:05 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3321 (Closed): [Coding] Validation check Signal & Information
- 16:05 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3320 (Closed): [Coding] WDT Configuration Line 5
- 16:05 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3318 (Closed): [Coding] WDT Configuration Line 4
- 16:05 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3319 (Closed): [Coding] Validation check Signal & Information Line 4
- 16:05 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3317 (Closed): [Coding] Validation check Signal & Information Line 3
- 16:05 SHINDENGEN (THAILAND) CO., LTD. Project progress work #3316 (Closed): [Coding] WDT Configuration Line 3
- 15:57 AH BRAKE (THAILAND) CO., LTD. Parent project #3341 (Closed): [PJ250103] MOC packing system for AHT modification fee Convert to picking list
- 15:57 AH BRAKE (THAILAND) CO., LTD. Project progress work #3345 (Closed): [Installation&On-site support]
- 15:57 AH BRAKE (THAILAND) CO., LTD. Project progress work #3344 (Closed): [Coding]
- 15:57 AH BRAKE (THAILAND) CO., LTD. Project progress work #3343 (Closed): [Internal Design]
- 15:57 AH BRAKE (THAILAND) CO., LTD. Project progress work #3342 (Closed): [Requirement definition]
- 15:56 NTN MANUFACTURING (THAILAND) CO., LTD. Parent project #6939 (Closed): [PJ260047] ConMas i-Reporter 20 users On-premises
- 15:50 NTN MANUFACTURING (THAILAND) CO., LTD. Parent project #5397 (Closed): [PJ260010] Infrastructure IoT system for NTN Manufacturing(Thailand) Hardware PT
- 15:50 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #5401 (Closed): [Installation&On-site support]
- 15:50 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6462 (Closed): [Installation&On-site support] Power Meter installation
- 15:50 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6463 (Closed): [Installation&On-site support] Software installation (PLC)
- 15:49 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6464 (Closed): [Installation&On-site support] Software installation (Application)
- 15:49 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6465 (Closed): [Installation&On-site support] Software installation (Web Application)
- 15:49 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6466 (Closed): [Installation&On-site support] Teaching for UT
- 15:49 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6467 (Closed): [Installation&On-site support] User Testing & Trial
- 15:49 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6468 (Closed): [Inatallation&On-site support] Supports user feedback
- 15:49 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6469 (Closed): [Installation&On-site support] Teaching for Go live
- 15:49 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6470 (Closed): [Inatallation&On-site support] Go live
- 15:47 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #7061 (Closed): [Installation&On-site support] UAT
- 15:47 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #5400 (Closed): [Coding]
- 15:47 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6460 (Closed): [Coding] Hardware procurement
- 15:46 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6461 (Closed): [Coding] Hardware pre-shipment confirmation
- 15:46 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #5399 (Closed): [Internal Design]
- 15:46 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6459 (Closed): [Internal Design] System Design
- 15:45 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #5398 (Closed): [Requirement Definition]
- 15:45 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6457 (Closed): [Requirement definition] Kick-off meeting
- 15:45 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #6458 (Closed): [Requirement definition] Requirements confirmation
- 15:43 SHINDENGEN (THAILAND) CO., LTD. Parent project #5402 (Closed): [PJ260011] Operation monitoring system for ShinDengen add screen
- 15:43 SHINDENGEN (THAILAND) CO., LTD. Project progress work #5406 (Closed): [Installation&On-site support]
- 15:43 SHINDENGEN (THAILAND) CO., LTD. Project progress work #5405 (Closed): [Coding]
- 15:43 SHINDENGEN (THAILAND) CO., LTD. Project progress work #5404 (Closed): [Internal Design]
- 15:43 SHINDENGEN (THAILAND) CO., LTD. Project progress work #5403 (Closed): [Requirement definition]
- 15:40 AISAN CORPORATION ASIA PACIFIC LIMITED. Parent project #6654 (Closed): [PJ260027] Hardware unit sets
- 15:40 EARTH (THAILAND) CO.,LTD. Parent project #7150 (Closed): [PJ260071] Ultrasonic Label Sealing Equipment Rental fee
- 15:39 MINEBEA ACCESSSOLUTIONS THAI LTD. Parent project #7149 (Closed): [PJ260070] Hardware Label
- 15:39 MINEBEA ACCESSSOLUTIONS THAI LTD. Parent project #7163 (Closed): [PJ260073] Hardware Label
- 15:38 YAMATO ELECTRIC (THAILAND) CO., LTD. Parent project #7353 (Closed): [PJ260079] Label
- 15:37 CIMTOPS CORPORATION THAILAND Parent project #8212 (Closed): [PJ260085] CIMTOPS CORPORATION THAILAND REPRESENTATIVE OFFICE MARCH 2026
- 15:36 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Parent project #7170 (Closed): [PJ260076] Hardware Label
- 15:36 AISAN CORPORATION ASIA PACIFIC LIMITED. Parent project #7352 (Closed): [PJ260078] Handy Terminal
- 15:35 KEYENCE (THAILAND) CO., LTD. Parent project #7198 (Closed): [PJ260077] License
- 15:34 KEYENCE (THAILAND) CO., LTD. Parent project #8213 (Closed): [PJ260086] License
- 15:33 MINEBEA ACCESSSOLUTIONS THAI LTD. Parent project #8234 (Closed): [PJ260088] Hardware Label
- 15:28 KEYENCE (THAILAND) CO., LTD. Parent project #8244: [PJ260094] Licenae
- 1 Software
1-1 120-SUB-GENTN2 Ivanti General TN Client - 2-in-1 Subscription 1 unit
1-2 120-SUB-GENTN2_3Years paid ... - 15:25 KEYENCE (THAILAND) CO., LTD. Parent project #8244 (In Progress): [PJ260094] Licenae
- 15:24 NIPPN (THAILAND) CO., LTD. Parent project #8243: [PJ260093] Production management system for NIPPN (Thailand) Co.,Ltd. Apr. 2026
- 1 Software
1-1 Senior engineer A development + installation work 1 month
1-2 Middle engineer B development + instal... - 14:58 NIPPN (THAILAND) CO., LTD. Parent project #8243 (In Progress): [PJ260093] Production management system for NIPPN (Thailand) Co.,Ltd. Apr. 2026
- 14:57 KANEKA (THAILAND) CO., LTD. Parent project #8242: [PJ260092] Handy terminal stock management system modify fee
- 1 Software
1-1 Stock management system "PEGASUS" modify fee 1 job
Modify outbound schedule web page,
Add the vis... - 14:55 KANEKA (THAILAND) CO., LTD. Parent project #8242 (In Progress): [PJ260092] Handy terminal stock management system modify fee
- 14:53 OILES (THAILAND) CO., LTD. Parent project #8241: [PJ260091] Robot Handling Machine
- 1 Standard equipment cost
1-1 Nachi : MZ07LF-01-000-CFDS-0000F 1 set
1-2 IAI : ICSB3-BE1HB3M-WA-80AQ-60AQ-15AQB-T4-... - 14:41 OILES (THAILAND) CO., LTD. Parent project #8241 (In Progress): [PJ260091] Robot Handling Machine
- 14:39 A.N.I. LOGISTICS, LTD. Project progress work #8240 (New): [Installation&On-site support]
- 14:39 A.N.I. LOGISTICS, LTD. Project progress work #8239 (New): [Coding]
- 14:38 A.N.I. LOGISTICS, LTD. Project progress work #8238 (New): [Internal Design]
- 14:38 A.N.I. LOGISTICS, LTD. Project progress work #8237 (New): [Requirement definition]
- 14:36 A.N.I. LOGISTICS, LTD. Parent project #8236: [PJ260090] PRINTER RELOCATION & SETUP
- 1 Installation
1-1 SERVICE CHARGE FOR RELOCATION & SETUP (PRINTER SATO CL4NX) 1 JOB
(1 DAY INSTALLATION)
Remark ... - 14:35 A.N.I. LOGISTICS, LTD. Parent project #8236 (In Progress): [PJ260090] PRINTER RELOCATION & SETUP