Activity
From 06 Oct 2025 to 15 Oct 2025
15 Oct 2025
- 16:25 THAI MATTO NS CO., LTD. Project progress work #1700 (Closed): [Coding] Production Schedule Detail
- 15:21 NIPPN (THAILAND) CO., LTD. Project progress work #1697 (Close request): [Coding] Stock Management
- 15:20 NIPPN (THAILAND) CO., LTD. Project progress work #1697 (Closed): [Coding] Stock Management
- 15:20 NIPPN (THAILAND) CO., LTD. Project progress work #1696 (Closed): [Coding] Delivery
- 15:18 NIPPN (THAILAND) CO., LTD. Project progress work #1695 (Closed): [Coding] Production[2F]
- 15:18 NIPPN (THAILAND) CO., LTD. Project progress work #1694 (Closed): [Coding] Production[3F]
- 15:12 NIPPN (THAILAND) CO., LTD. Project progress work #1611 (In Progress): [Coding] Picking Plan - Full bag
- 15:11 NIPPN (THAILAND) CO., LTD. Project progress work #1610 (Close request): [Coding] Incoming Plan
- 15:05 NIPPN (THAILAND) CO., LTD. Project progress work #1608 (Close request): [Coding] Login , Menu and others
- 14:59 NIPPN (THAILAND) CO., LTD. Project progress work #1693 (Close request): [Coding] Email notifications
- 14:58 NIPPN (THAILAND) CO., LTD. Project progress work #1693 (Closed): [Coding] Email notifications
- 14:56 NIPPN (THAILAND) CO., LTD. Project progress work #1692 (Closed): [Coding] Warehouse master
- 14:55 NIPPN (THAILAND) CO., LTD. Project progress work #1691 (Closed): [Coding] Blending
- 14:53 NIPPN (THAILAND) CO., LTD. Project progress work #1690 (Closed): [Coding] Timing of tipping
- 14:47 NIPPN (THAILAND) CO., LTD. Project progress work #1684 (New): [Coding] TippingPlace
- 14:45 NIPPN (THAILAND) CO., LTD. Project progress work #1570 (Close request): [Coding] Pending Reason
- 14:45 NIPPN (THAILAND) CO., LTD. Project progress work #1569 (Close request): [Coding] NFT Product
- 14:44 NIPPN (THAILAND) CO., LTD. Project progress work #1567 (Close request): [Coding] Bill of Materials
- 14:42 NIPPN (THAILAND) CO., LTD. Project progress work #1565 (Close request): [Coding] Authority Master
- 14:39 NIPPN (THAILAND) CO., LTD. Project progress work #1563 (Close request): [Coding] User Credential master
- 14:38 NIPPN (THAILAND) CO., LTD. Project progress work #1562 (Close request): [Coding] User master
- 14:37 NIPPN (THAILAND) CO., LTD. Project progress work #1560 (Close request): [Coding] Location master
- 14:35 NIPPN (THAILAND) CO., LTD. Project progress work #1559 (Close request): [Coding] Standard Packing Master
- 14:26 NIPPN (THAILAND) CO., LTD. Project progress work #1557 (Close request): [Coding] Item master
- 14:25 NIPPN (THAILAND) CO., LTD. Project progress work #1556 (Close request): [Coding] Customer master
- 14:25 NIPPN (THAILAND) CO., LTD. Project progress work #1553 (Close request): [Coding] Supplier name information
- 14:22 NIPPN (THAILAND) CO., LTD. Project progress work #1545 (Close request): [Coding] PO Material
- 14:20 NIPPN (THAILAND) CO., LTD. Project progress work #1544 (Close request): [Coding] Puchase Instructions
- 14:19 NIPPN (THAILAND) CO., LTD. Project progress work #1541 (Close request): [Coding] Stocktaking
- 14:17 NIPPN (THAILAND) CO., LTD. Project progress work #1539 (Close request): [Coding] Stock Maintenance
- 14:13 NIPPN (THAILAND) CO., LTD. Project progress work #1538 (Close request): [Coding] Stock inquiy/report
- 14:09 NIPPN (THAILAND) CO., LTD. Project progress work #1532 (In Progress): [Coding] Incoming Plan
- 14:06 NIPPN (THAILAND) CO., LTD. Project progress work #1689 (Closed): [Coding] Dashboard UI
- 14:04 NIPPN (THAILAND) CO., LTD. Project progress work #1688 (Closed): [Coding] Monthly Inventory report
- 14:02 NIPPN (THAILAND) CO., LTD. Project progress work #1514 (Close request): [Coding] Issues Blending formula sheet
- 13:57 NIPPN (THAILAND) CO., LTD. Project progress work #1510 (Close request): [Coding] Outbound
- 13:55 NIPPN (THAILAND) CO., LTD. Project progress work #1509 (Close request): [Coding] Outbound schedule
- 13:53 NIPPN (THAILAND) CO., LTD. Project progress work #1508 (Close request): [Coding] PO planning
14 Oct 2025
- 17:04 A.N.I. LOGISTICS, LTD. Project progress work #1483 (In Progress): [Coding] OCR - IV
- today
-Create UI and Socket for IV process
tomorrow
-Create UI and Socket for IV process
10 Oct 2025
- 17:11 A.N.I. LOGISTICS, LTD. Project progress work #1483: [Coding] OCR - IV
- today
-Create UI and Socket for IV process
tomorrow
-Create UI and Socket for IV process - 09:08 NIPPN (THAILAND) CO., LTD. Project progress work #1686 (In Progress): [Coding] Delivery Planning
09 Oct 2025
- 17:28 A.N.I. LOGISTICS, LTD. Project progress work #1482: [Coding] ANI, Web Socket Q-Point Inner packing
- today
-Coding Socket API
tomorrow
-Coding Socket API - 15:24 NIPPN (THAILAND) CO., LTD. Project progress work #1527 (In Progress): [Coding] Inbound schedule RM
- 15:24 NIPPN (THAILAND) CO., LTD. Project progress work #902 (In Progress): [Documentation] Get requirements of project
- 15:24 NIPPN (THAILAND) CO., LTD. Project progress work #1684 (In Progress): [Coding] TippingPlace
- 14:52 NIPPN (THAILAND) CO., LTD. Project progress work #1684 (Closed): [Coding] TippingPlace
- 15:23 NIPPN (THAILAND) CO., LTD. Project progress work #1608 (In Progress): [Coding] Login , Menu and others
- 15:08 NIPPN (THAILAND) CO., LTD. Project progress work #1686 (Closed): [Coding] Delivery Planning
- 15:05 NIPPN (THAILAND) CO., LTD. Project progress work #1514 (In Progress): [Coding] Issues Blending formula sheet
- 15:05 NIPPN (THAILAND) CO., LTD. Project progress work #1513 (In Progress): [Coding] RM Requistion sheet &schedule
- 15:04 NIPPN (THAILAND) CO., LTD. Project progress work #1512 (In Progress): [Coding] Picking/FG/Delivery Schedule Generate
- 14:57 NIPPN (THAILAND) CO., LTD. Project progress work #1685 (In Progress): [Coding] MRP - PO Material Request
- 14:57 NIPPN (THAILAND) CO., LTD. Project progress work #1685 (Closed): [Coding] MRP - PO Material Request
- 12:00 THAI MATTO NS CO., LTD. Project progress work #1681 (New): [Coding] Weighing
- 11:59 THAI MATTO NS CO., LTD. Project progress work #1680 (Closed): [Coding] Weighing Receiving
- 11:57 THAI MATTO NS CO., LTD. Project progress work #1678 (Closed): [Coding] Stock Management
- 11:39 THAI MATTO NS CO., LTD. Project progress work #1675 (In Progress): [Coding] inbound Schedule Material
- 11:39 THAI MATTO NS CO., LTD. Project progress work #1675 (Closed): [Coding] inbound Schedule Material
08 Oct 2025
- 17:22 A.N.I. LOGISTICS, LTD. Project progress work #1482: [Coding] ANI, Web Socket Q-Point Inner packing
- today
-Coding Socket API
tomorrow
-Coding Socket API
07 Oct 2025
- 17:15 A.N.I. LOGISTICS, LTD. Project progress work #1066: [Coding] Handy development
- today
-Create Process check q-point check inner packing Trim (SOCKET)
tomorrow
-Create Process check q-point check...
06 Oct 2025
- 17:12 A.N.I. LOGISTICS, LTD. Project progress work #1481: [Coding] ANI,OCR Handy QGate Check
- today
-Coding Socket Q-Gate Q-check-point for panel - 15:49 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1674 (Close request): [Installation&On-site support] Go live
- 15:46 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1674 (Closed): [Installation&On-site support] Go live
- 15:49 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1673 (Close request): [Installation&On-site support] Teaching for Go live
- 15:40 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1673 (Closed): [Installation&On-site support] Teaching for Go live
- 15:48 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1672 (Close request): [Installation&On-site support] Supports user feedback
- 15:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1672 (Closed): [Installation&On-site support] Supports user feedback
- 15:48 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1671 (Close request): [Installation&On-site support] User Testing & Trial
- 15:29 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1671 (Closed): [Installation&On-site support] User Testing & Trial
- 15:48 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1670 (Close request): [Installation&On-site support] Teaching for UT
- 15:24 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1670 (Closed): [Installation&On-site support] Teaching for UT
- 15:48 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1669 (Close request): [Installation&On-site support] Hardware installation
- 15:23 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1669 (Closed): [Installation&On-site support] Hardware installation
- 15:48 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1668 (Close request): [Installation&On-site support] Software installation
- 15:19 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1668 (Closed): [Installation&On-site support] Software installation
- 15:12 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1205 (In Progress): [Coding] Add Language menu english to japanese
- 15:12 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1185 (Close request): [Installation&On-site support]
- 15:11 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1667 (Close request): [Installation&On-site support] Go live
- 15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1667 (Closed): [Installation&On-site support] Go live
- 15:11 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1666 (Close request): [Installation&On-site support] Teaching for Go live
- 15:08 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1666 (Closed): [Installation&On-site support] Teaching for Go live
- 15:11 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1665 (Close request): [Installation&On-site support] Supports user feedback
- 15:07 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1665 (Closed): [Installation&On-site support] Supports user feedback
- 15:11 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1664 (Close request): [Installation&On-site support] User Testing & Trial
- 15:04 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1664 (Closed): [Installation&On-site support] User Testing & Trial
- 15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1663 (Close request): [Installation&On-site support] trainning User Inj/Press
- 15:00 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1663 (Closed): [Installation&On-site support] trainning User Inj/Press
- 15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1662 (Close request): [Installation&On-site support] trainning User WH/Assy
- 14:55 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1662 (Closed): [Installation&On-site support] trainning User WH/Assy
- 15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1661 (Close request): [Installation&On-site support] Teaching for UT
- 14:53 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1661 (Closed): [Installation&On-site support] Teaching for UT
- 15:10 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1660 (Close request): [Installation&On-site support] Software installation
- 14:51 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1660 (Closed): [Installation&On-site support] Software installation
- 14:58 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1366 (Close request): [Coding] Software development (Handy)
- 14:49 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1204 (Close request): [Coding] Add Setting hide show column (Stock Inquiry/Report, Stock Inventory Report)
- 14:45 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1203 (Close request): [Coding] Add new page Report QC Page
- 14:45 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1202 (Close request): [Coding] Purchase instructions 3 months change to 4 months
- 14:45 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1201 (Close request): [Coding] Add new Report stockcard (open,rec,issue,stock) Page
- 14:45 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1200 (Close request): [Coding] Add new page Report delivery (monthly delivery report) Page
- 14:44 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1199 (Close request): [Coding] Gen pdf Assembly Order Sheet Report (Assy,Press,Inj)
- 14:44 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1198 (Close request): [Coding] Add new page & Implement QC process for production (Assy, Inj, Press)
- 14:43 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1197 (Close request): [Coding] Modify generate production schedule
- 14:43 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1196 (Close request): [Coding] Add new page master data ng detail
- 14:42 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1195 (Close request): [Coding] Add new page Schedule QC material
- 14:42 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1184 (In Progress): [Coding] Software development (Web)
- 14:37 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1194 (Close request): [Coding] Implement QC process for purchase orders (Po, Pr) *wait AQL data
- 14:37 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1193 (Close request): [Coding] Add new page Report warehouse (monthly inventory report) Page
- 14:34 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1192 (Close request): [Coding] Add new page Report delivery (weekly delivery report) Page
- 14:34 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1191 (Close request): [Coding] Add new master data page (machine)
- 14:33 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1190 (Close request): [Coding] Add new master data page (line)
- 14:31 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1189 (Close request): [Coding] Search by part_name on page (stock inventory report) Search By part_name page stock_inquiry_report
- 14:31 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1188 (Close request): [Coding] Import schedule production (assy, press, inj) and delivery for 1 months to 4 months
- 14:29 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1370 (Close request): [Coding] Mix material
- 14:29 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1371 (Close request): [Coding] Inbound WIP - Inj & Press
- 14:29 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1372 (Close request): [Coding] Outbound Purge material L3 - Assy & Inj & Press
- 14:29 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1373 (Close request): [Coding] Return parts to WH
- 14:29 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1374 (Close request): [Coding] Create label template for QC Type & Modify label template
- 14:28 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1369 (Close request): [Coding] Inbound FG - Assy
- 14:28 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1368 (Close request): [Coding] Confirm material before production
- 14:28 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #1367 (Close request): [Coding] Inbound Material - WH
- 14:03 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1087 (Close request): [Installation&On-site support] Classify
- 13:58 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1379 (Close request): [Coding] Modify Api for link servers
- 13:57 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1378 (Close request): [Coding] Template Label
- 13:57 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1377 (Close request): [Coding] Modify Taping label on handy
- 13:57 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1376 (Close request): [Coding] Label print of classify
- 13:57 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1375 (Close request): [Coding] Modify classify function
- 13:57 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1086 (Close request): [Coding] Software development (Handy)
- 13:56 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1085 (Close request): [Internal Design]
- 13:56 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1084 (Close request): [Requirement definition]
- 13:35 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #790 (Close request): [Colding] Handy terminal BT-A500 Java application [Calling maintenance staff system]
- 13:35 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #995 (Close request): get requirement and create specification Doc. [Calling maintenance staff system]
- 13:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1083 (Close request): [Installation&On-site support]
- 13:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1346 (Close request): [Coding] Software development (Window App)
- 13:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1356 (Close request): [Coding] PDF report
- 13:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1355 (Close request): [Coding] MTTR report
- 13:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1354 (Close request): [Coding] Breakdown report
- 13:32 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1353 (Close request): [Coding] Window App Create report 3 reports
- 13:32 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1352 (Close request): [Coding] Window App Add table master 6 tabel
- 13:31 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1343 (Close request): [Coding] Web
- 13:31 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1359 (Close request): [Coding] web socket
- 13:30 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1358 (Close request): [Coding] Generate PDF report
- 13:29 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1363 (Close request): [Coding] Monitor #4
- 13:29 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1362 (Close request): [Coding] Monitor #3
- 13:29 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1361 (Close request): [Coding] Monitor #2
- 13:29 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1360 (Close request): [Coding] Monitor #1
- 13:29 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1357 (Close request): [Coding] 4/4 dashboards
- 13:11 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1342 (Close request): [Coding] Web Socket
- 13:07 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1340 (Close request): [Coding] Software development (Tablet)
- 13:06 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1351 (Close request): [Coding] Tablet Create function Monitor
- 13:06 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1350 (Close request): [Coding] Tablet Create function Job Assignment
- 13:05 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1338 (Close request): [Coding] Software development (Handy)
- 13:04 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1081 (Close request): [Internal Design]
- 13:04 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1080 (Close request): [Requirement definition]
- 12:02 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1349 (Close request): [Coding] Handy Create function Inspection
- 12:01 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #1348 (Close request): [Coding] Handy Create function Request Repair