Project

General

Profile

Activity

From 01 Jan 2024 to 10 Jan 2024

10 Jan 2024

21:26 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
16:53 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #356 (Closed): Checking Process.)
develop Checking Process HT. Kamol Anekchatnuntakool
16:53 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #361 (Closed): Test Camera CVX and send to server)
Send images to the server and send error values to the PLC Suthiwat Banrueangthong
09:17 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #361 (Closed): Test Camera CVX and send to server)
Set up the camera and connect to the server. Suthiwat Banrueangthong
09:15 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #361 (Closed): Test Camera CVX and send to server)
Connect camera and test usage Suthiwat Banrueangthong
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #345 (Closed): Design ,Install & Wiring in control box)
Suchin Viyasing
12:04 DENSO Philippines Corporation 8.00 hours (Project progress work #22 (Closed): Make specification document for project)
Ryo Nozaki
12:04 DENSO Philippines Corporation 4.00 hours (Project progress work #22 (Closed): Make specification document for project)
Bisiness trip to Philipine Ryo Nozaki
09:10 DENSO Philippines Corporation 8.00 hours (Project progress work #111 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Meeting Kittisak Isarapongporn
08:14 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #360 (Closed): Leave of absence.)
Suchin Viyasing
08:12 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #359 (Closed): sick leave)
Suchin Viyasing
08:10 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #358 (Closed): Ricoh Thailand meeting with Shimmizu)
Meeting about ANI project and price Ryo Nozaki
08:10 Thai Nippon foods Co.,Ltd. 24.00 hours (Project progress work #357 (Closed): sick leave.)
Suchin Viyasing
08:02 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #346 (Closed): Design & Install equipment in the cabinet)
Install equipment on cabinet. Suchin Viyasing
08:02 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #346 (Closed): Design & Install equipment in the cabinet)
Install equipment on cabinet. Suchin Viyasing

09 Jan 2024

22:53 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
17:08 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #356 (Closed): Checking Process.)
develop Checking Process HT. Kamol Anekchatnuntakool
16:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC)
Test Access Point Teltonika RUT200 Woraphong Wernsantiah
16:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC)
Test Wifi Data transmission Between PLC To PLC Woraphong Wernsantiah
16:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC)
Test Wifi Data transmission Between PLC To PLC Woraphong Wernsantiah
16:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC)
Test Wifi Data transmission Between PLC To PLC Woraphong Wernsantiah
16:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC)
Test Wifi Data transmission Between PLC To PLC Woraphong Wernsantiah
09:11 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:11 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:11 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:10 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:10 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:10 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:09 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:09 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:09 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:09 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:08 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:08 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:07 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:07 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:06 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:06 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:05 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
09:05 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
Support to start using WMS the system for handy terminal & pegasus system Arunwit Isarapongporn
08:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah
08:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah
08:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah
08:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah
08:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah
08:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah
08:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah
08:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah
08:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah
08:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah
08:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
OEE% Cal Function Woraphong Wernsantiah

08 Jan 2024

21:01 Tomas Tech Co.,Ltd. 1.00 hour (Sales support #20 (Closed): [FY2023]Common management for Soraya)
Soraya Norasing
20:55 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #20 (Closed): [FY2023]Common management for Soraya)
sick leave Soraya Norasing
20:55 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #20 (Closed): [FY2023]Common management for Soraya)
sick leave Soraya Norasing
20:55 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #20 (Closed): [FY2023]Common management for Soraya)
day off Soraya Norasing
20:54 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #20 (Closed): [FY2023]Common management for Soraya)
day off Soraya Norasing
21:00 Asian Stanley. International Limited 1.00 hour (Project progress work #347 (Closed): Meeting about modify display on TV )
Soraya Norasing
20:57 Minebea AccessSolutions Thai Ltd 6.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
20:57 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
coding label detail Soraya Norasing
19:21 DENSO Philippines Corporation 8.00 hours (Project progress work #111 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Coding about the manual settings for IP address on smart watch and travel to Philippines Kittisak Isarapongporn
16:59 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #356 (Closed): Checking Process.)
develop Checking Process HT. Kamol Anekchatnuntakool
16:43 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
Find new maker and explain new concept Woraphong Wernsantiah
16:42 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
Find new maker and explain new concept Woraphong Wernsantiah
16:42 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
Find new maker and explain new concept Woraphong Wernsantiah
16:42 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
Find new maker and explain new concept Woraphong Wernsantiah
16:42 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
Find new maker and explain new concept Woraphong Wernsantiah
16:41 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
Find new maker and explain new concept Woraphong Wernsantiah
16:41 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
Find new maker and explain new concept Woraphong Wernsantiah
16:31 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
Find new maker and explain new concept Woraphong Wernsantiah
16:30 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
Find new maker and explain new concept Woraphong Wernsantiah
16:30 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
Introduce new maker and explain new concept Woraphong Wernsantiah
16:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
16:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
16:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
16:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
16:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew
16:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30% Santi Srichankaew

06 Jan 2024

16:49 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
16:30 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #346 (Closed): Design & Install equipment in the cabinet)
Suchin Viyasing
08:04 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #346 (Closed): Design & Install equipment in the cabinet)
Install Equipment on cabinet 4set. Suchin Viyasing
16:26 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Sales support #326 (Closed): Proposal IoT system for production line)
Meeting with Mr.Yamate Ryo Nozaki
16:24 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #24 (Closed): [FY2023]Common management for Ryo Nozaki)
Interview and make calender Ryo Nozaki
16:23 DENSO Philippines Corporation 8.00 hours (Project progress work #22 (Closed): Make specification document for project)
Make revision R3 document and update Ryo Nozaki
15:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #345 (Closed): Design ,Install & Wiring in control box)
Design drawing Suchin Viyasing
08:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #345 (Closed): Design ,Install & Wiring in control box)
Make Document Suchin Viyasing

05 Jan 2024

22:54 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
17:30 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
16:48 Asian Stanley. International Limited 4.00 hours (Project progress work #353 (Closed): Support and discuss with user side)
Meeting with user Ryo Nozaki
16:46 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #352 (Closed): Download screen Design our website)
Make document Ryo Nozaki
16:44 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
meeting with Mr.Iyoda and Mr.Osada Ryo Nozaki
16:43 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Sales support #326 (Closed): Proposal IoT system for production line)
Ryo Nozaki
16:41 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #351 (Closed): Ricoh Thailand meeting )
Ryo Nozaki
16:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #350 (Closed): Meeting with ANI and discuss spec of phase03)
Ryo Nozaki
16:34 DENSO Philippines Corporation 9.00 hours (Project progress work #22 (Closed): Make specification document for project)
Make meetinng document Ryo Nozaki

04 Jan 2024

22:21 Asian Stanley. International Limited 1.00 hour (Project progress work #347 (Closed): Meeting about modify display on TV )
Soraya Norasing
19:44 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #348 (Closed): Install program and windows)
Suthiwat Banrueangthong
17:21 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
coding inbound detail page Soraya Norasing
17:21 Minebea AccessSolutions Thai Ltd 7.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
16:53 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
07:59 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
16:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #346 (Closed): Design & Install equipment in the cabinet)
Quotation from maker about cutting cabinet for install fan. Suchin Viyasing
16:31 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
Add result report to import transaction function Kittisak Isarapongporn
15:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #345 (Closed): Design ,Install & Wiring in control box)
[Task]JTEKT Compare Quotation from maker about support cabinet. Suchin Viyasing
13:56 BIG Star Co.,Ltd 5.00 hours (Sales support #209 (Closed): Shoe size sorting machine project Concept proposal )
Meeting about the concept of machine Nattapol Poeam
00:23 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Kittisak Isarapongporn
 

Also available in: Atom