- 21:26 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 16:53 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #356 (Closed): Checking Process.)
- develop Checking Process HT.
- 16:53 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #361 (Closed): Test Camera CVX and send to server)
- Send images to the server and send error values to the PLC
- 09:17 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #361 (Closed): Test Camera CVX and send to server)
- Set up the camera and connect to the server.
- 09:15 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #361 (Closed): Test Camera CVX and send to server)
- Connect camera and test usage
- 16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #345 (Closed): Design ,Install & Wiring in control box)
- 12:04 DENSO Philippines Corporation 8.00 hours (Project progress work #22 (Closed): Make specification document for project)
- 12:04 DENSO Philippines Corporation 4.00 hours (Project progress work #22 (Closed): Make specification document for project)
- Bisiness trip to Philipine
- 09:10 DENSO Philippines Corporation 8.00 hours (Project progress work #111 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Meeting
- 08:14 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #360 (Closed): Leave of absence.)
- 08:12 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #359 (Closed): sick leave)
- 08:10 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #358 (Closed): Ricoh Thailand meeting with Shimmizu)
- Meeting about ANI project and price
- 08:10 Thai Nippon foods Co.,Ltd. 24.00 hours (Project progress work #357 (Closed): sick leave.)
- 08:02 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #346 (Closed): Design & Install equipment in the cabinet)
- Install equipment on cabinet.
- 08:02 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #346 (Closed): Design & Install equipment in the cabinet)
- Install equipment on cabinet.
09 Jan 2024
- 22:53 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 17:08 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #356 (Closed): Checking Process.)
- develop Checking Process HT.
- 16:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC)
- Test Access Point Teltonika RUT200
- 16:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC)
- Test Wifi Data transmission Between PLC To PLC
- 16:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC)
- Test Wifi Data transmission Between PLC To PLC
- 16:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC)
- Test Wifi Data transmission Between PLC To PLC
- 16:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #349 (Closed): Test WiFi data transmission between PLC to PLC)
- Test Wifi Data transmission Between PLC To PLC
- 09:11 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:11 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:11 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:10 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:10 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:10 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:09 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:09 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:09 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:09 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:08 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:08 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:07 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:07 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:06 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:06 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:05 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 09:05 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #94 (Closed): [On-site support]Support after cutover)
- Support to start using WMS the system for handy terminal & pegasus system
- 08:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
- 08:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
- 08:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
- 08:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
- 08:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
- 08:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
- 08:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
- 08:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
- 08:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
- 08:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
- 08:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #355 (Closed): Deverlop OEE % data analysis)
- OEE% Cal Function
08 Jan 2024
- 21:01 Tomas Tech Co.,Ltd. 1.00 hour (Sales support #20 (Closed): [FY2023]Common management for Soraya)
- 20:55 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #20 (Closed): [FY2023]Common management for Soraya)
- sick leave
- 20:55 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #20 (Closed): [FY2023]Common management for Soraya)
- sick leave
- 20:55 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #20 (Closed): [FY2023]Common management for Soraya)
- day off
- 20:54 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #20 (Closed): [FY2023]Common management for Soraya)
- day off
- 21:00 Asian Stanley. International Limited 1.00 hour (Project progress work #347 (Closed): Meeting about modify display on TV )
- 20:57 Minebea AccessSolutions Thai Ltd 6.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 20:57 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- coding label detail
- 19:21 DENSO Philippines Corporation 8.00 hours (Project progress work #111 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Coding about the manual settings for IP address on smart watch and travel to Philippines
- 16:59 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #356 (Closed): Checking Process.)
- develop Checking Process HT.
- 16:43 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
- Find new maker and explain new concept
- 16:42 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
- Find new maker and explain new concept
- 16:42 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
- Find new maker and explain new concept
- 16:42 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
- Find new maker and explain new concept
- 16:42 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
- Find new maker and explain new concept
- 16:41 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
- Find new maker and explain new concept
- 16:41 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
- Find new maker and explain new concept
- 16:31 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
- Find new maker and explain new concept
- 16:30 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
- Find new maker and explain new concept
- 16:30 BIG Star Co.,Ltd 8.00 hours (Sales support #311 (Closed): Introduce new maker and explain new concept)
- Introduce new maker and explain new concept
- 16:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 16:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 16:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 16:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 16:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
- 16:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Deverlop PLC calculate bekido function LINE LINK PRODUCTION 30%
06 Jan 2024
- 16:49 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
- 16:30 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #346 (Closed): Design & Install equipment in the cabinet)
- 08:04 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #346 (Closed): Design & Install equipment in the cabinet)
- Install Equipment on cabinet 4set.
- 16:26 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Sales support #326 (Closed): Proposal IoT system for production line)
- Meeting with Mr.Yamate
- 16:24 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #24 (Closed): [FY2023]Common management for Ryo Nozaki)
- Interview and make calender
- 16:23 DENSO Philippines Corporation 8.00 hours (Project progress work #22 (Closed): Make specification document for project)
- Make revision R3 document and update
- 15:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #345 (Closed): Design ,Install & Wiring in control box)
- Design drawing
- 08:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #345 (Closed): Design ,Install & Wiring in control box)
- Make Document
05 Jan 2024
- 22:54 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 17:30 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
- 16:48 Asian Stanley. International Limited 4.00 hours (Project progress work #353 (Closed): Support and discuss with user side)
- Meeting with user
- 16:46 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #352 (Closed): Download screen Design our website)
- Make document
- 16:44 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
- meeting with Mr.Iyoda and Mr.Osada
- 16:43 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Sales support #326 (Closed): Proposal IoT system for production line)
- 16:41 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #351 (Closed): Ricoh Thailand meeting )
- 16:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #350 (Closed): Meeting with ANI and discuss spec of phase03)
- 16:34 DENSO Philippines Corporation 9.00 hours (Project progress work #22 (Closed): Make specification document for project)
- Make meetinng document
04 Jan 2024
- 22:21 Asian Stanley. International Limited 1.00 hour (Project progress work #347 (Closed): Meeting about modify display on TV )
- 19:44 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #348 (Closed): Install program and windows)
- 17:21 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- coding inbound detail page
- 17:21 Minebea AccessSolutions Thai Ltd 7.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 16:53 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
- 07:59 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Develop Inner packing screen function C#.
- 16:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #346 (Closed): Design & Install equipment in the cabinet)
- Quotation from maker about cutting cabinet for install fan.
- 16:31 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
- Add result report to import transaction function
- 15:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #345 (Closed): Design ,Install & Wiring in control box)
- [Task]JTEKT Compare Quotation from maker about support cabinet.
- 13:56 BIG Star Co.,Ltd 5.00 hours (Sales support #209 (Closed): Shoe size sorting machine project Concept proposal )
- Meeting about the concept of machine
- 00:23 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)