22:22 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Modify the store proc about the schedule generator and support user for the testing Kittisak Isarapongporn
17:45 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Project progress work #310 (Closed): Support config Data Master Reader and insert Data Laser.)
Support config Data Master Reader and insert Data Laser. Kamol Anekchatnuntakool
17:41 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
17:30 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #308 (Closed): Review and learn the source code of the project.)
Tanawan Wongsa-ard
16:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #308 (Closed): Review and learn the source code of the project.)
Tanawan Wongsa-ard
10:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #308 (Closed): Review and learn the source code of the project.)
Tanawan Wongsa-ard
10:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #308 (Closed): Review and learn the source code of the project.)
Tanawan Wongsa-ard
16:30 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #297 (Closed): Wiring cable in the cabinet)
Design drawing Jtekt Suchin Viyasing

14 Dec 2023

22:07 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #299 (Closed): Modify the specification document and confirm the design)
Kittisak Isarapongporn
17:30 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
16:51 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
16:29 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #297 (Closed): Wiring cable in the cabinet)
Wiring cable in the cabinet Suchin Viyasing
11:51 ADVICS MANUFACTURING (THAILAND) CO., LTD. 4.00 hours (Project progress work #307 (Closed): Installation FTP On server data from PLC Bekido)
Installation FTP On server data from PLC Bekido Santi Srichankaew
11:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #306 (Closed): Meeting Kick off IOT bekido and OA monitoring #2)
Bekido monitoring Santi Srichankaew

13 Dec 2023

23:51 FTS AUTOMOTIVE (THAILAND) CO.,LTD 1.00 hour (Sales support #231 (Closed): Replace procejet from D100 to KV8000 and XD02)
Contenue proposal and customer said set budjet at April 2024 Ryo Nozaki
23:50 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. 1.00 hour (Project progress work #213 (Closed): Proposal IoT system for Maco production line)
Handover to K.Boy. The meeting will be booked on a separate ticket. Ryo Nozaki
23:49 EBARA FOODS (THAILAND) CO., LTD. 1.00 hour (Sales support #61 (Closed): Proposal activities + proposal document creation)
Lost , customer choose other vender from Japan Ryo Nozaki
23:49 ACME INDUSTRY CO.,LTD. 1.00 hour (Sales support #63 (Closed): IoT project Proposal activities + requirements definition)
Summrize proposal and explain Ms.Mukai Ryo Nozaki
23:48 A.N.I. LOGISTICS, LTD. 1.00 hour (Sales support #62 (Closed): CKD project phase3 Proposal activities + requirements definition)
Handover to K.Nack. The meeting will be booked on a separate ticket. Ryo Nozaki
23:47 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 1.00 hour (Project progress work #143 (Closed): Production IoT project requirements and support project)
Crate and conteniue management other ticket Ryo Nozaki
23:45 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #10 (Closed): Creating a specification document)
Inernal meeting and sumrize document Ryo Nozaki
23:34 TOMAS TECH CO., LTD. 4.00 hours (Sales support #305 (Closed): Aisan industry meeting with Mr.Inagaki and keyence Eyama)
Ryo Nozaki
23:33 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #304 (Closed): OTICS (Thailand) Company Limited sales for IoT system)
Meeting with Mr.Matsuura Ryo Nozaki
23:30 NISSAN MOTOR (THAILAND) CO., LTD. 2.00 hours (Sales support #89 (Closed): New OCR project for Fac1 and Fac2)
Lost Ryo Nozaki
23:29 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #303 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus for MAS-T)
Meeting with Thai menber at MAS-T Ryo Nozaki
23:26 TOMAS TECH CO., LTD. 2.00 hours (Sales support #302 (Closed): YAMASA ASIA OCEANIA CO., LTD. meeting about sales)
Meeting with Mr.Kanuma Ryo Nozaki
23:25 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #301 (Closed): Keyence Mr.Shima meeting about New WD IoT demo unit and HRX100-300-500)
Meeting with Mr.Shima Ryo Nozaki
20:59 MINEBEA ACCESSSOLUTIONS THAI LTD. 6.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
20:57 TOMAS TECH CO., LTD. 1.00 hour (Sales support #20 (Closed): [FY2023]Common management for Soraya)
Soraya Norasing
20:53 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 1.00 hour (Project progress work #198 (Closed): HTA_NSET modification completion label function)
Soraya Norasing
17:16 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Wiring cable in the cabinet Suchin Viyasing
16:46 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #297 (Closed): Wiring cable in the cabinet)
wiring in the 4th control cabinet. Suchin Viyasing
16:45 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool
16:22 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #299 (Closed): Modify the specification document and confirm the design)
Update TO-DO list Kittisak Isarapongporn
16:21 EBISU FOODS CO., LTD. 1.00 hour (Project progress work #300 (Closed): Weekly meeting (Wed 15.00-16.00pm))
Kittisak Isarapongporn
16:12 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Modify spec and weekly meeting Kittisak Isarapongporn

12 Dec 2023

21:37 ACME INDUSTRY CO.,LTD. 2.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Import the master data for SUB ASSY and CAVITY items. Kittisak Isarapongporn
21:11 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Teaching about schedule operation for Injection staff Kittisak Isarapongporn
21:32 MINEBEA ACCESSSOLUTIONS THAI LTD. 6.00 hours (Project progress work #299 (Closed): Modify the specification document and confirm the design)
Kittisak Isarapongporn
17:32 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #298 (Closed): Modify the functionality of the Direct Labor)
Soraya Norasing
16:59 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #297 (Closed): Wiring cable in the cabinet)
Suchin Viyasing
16:45 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
Develop Inner packing screen function C#. Kamol Anekchatnuntakool

11 Dec 2023

21:34 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #296 (Closed): Meeting with ACME INDUSTRY CO.,LTD and site survey and teaching for customer)
Meeting and disscuss about Injection spec Ryo Nozaki
21:33 TOMAS TECH CO., LTD. 2.00 hours (Sales support #295 (Closed): Interview with PG)
Meeting with applicant Ryo Nozaki
21:31 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 6.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
Meeting and site survey with Mr.Iyoda Ryo Nozaki
21:28 TOMAS TECH CO., LTD. 4.00 hours (Sales support #294 (Closed): KASEI (THAILAND) CO.,LTD. meeting with Mr.Shiozawa)
Ryo Nozaki
21:25 MITSUI PRECISION THAI CO., LTD. 2.00 hours (Sales support #137 (Closed): Sales and presentation about Pegasus production management system)
Site survey with Mr.Nakajima and next action create proposal for customer Ryo Nozaki
21:23 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #293 (Closed): CITIZEN MACHINERY ASIA CO.,LTD meeting with Mr.Tamura and disscuss about IoT system)
Meeting wish Mr.Tamura Ryo Nozaki
21:20 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #292 (Closed): QHR Kodate meeting and disscuss about HR constract)
Ryo Nozaki
13:20 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
wait installation Anonymous
13:20 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
wait installation Anonymous
13:20 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
wait installation Anonymous
13:20 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
wait installation Anonymous
13:19 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
wait installation Anonymous
13:19 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
wait installation Anonymous

09 Dec 2023

16:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
03:12 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
coding inbound schedule page Soraya Norasing
03:11 ASIAN STANLEY. INTERNATIONAL LIMITED. 0.00 hour (Problem-Bug #291 (Closed): Found a problem with incorrect lot number dates.)
Soraya Norasing
03:04 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Problem-Bug #291 (Closed): Found a problem with incorrect lot number dates.)
Check and resolve issues with lot dates not matching work shifts. Test and update for customers. Soraya Norasing
02:44 ASIAN STANLEY. INTERNATIONAL LIMITED. 0.00 hour (Project progress work #290 (Closed): support user for update label printing handy app.)
Soraya Norasing
02:41 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #290 (Closed): support user for update label printing handy app.)
1.update label printing handy system for plcc line. 2.update label printing handy system for chip line 3.Verify the... Soraya Norasing

08 Dec 2023

23:29 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Adjust the initiate stock and Item Master Kittisak Isarapongporn
16:45 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #289 (Closed): Wiring cable in the cabinet 4 set)
Suchin Viyasing
16:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
14:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
14:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
07:41 TOMAS TECH CO., LTD. 4.00 hours (Sales support #288 (Closed): NSK Bearing Manufacturing (Thailand) co.ltd. proposal IoT system)
Meeting with customer and discussed about them recomend Ryo Nozaki

07 Dec 2023

22:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Sales support #287 (Closed): support user for label printing system)
Soraya Norasing
22:10 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #286 (Closed): Meeting about display on TV with customer)
Soraya Norasing
22:00 MINEBEA ACCESSSOLUTIONS THAI LTD. 3.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
17:07 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Modify backend API document Kittisak Isarapongporn
01:14 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Update backend API document Kittisak Isarapongporn
17:05 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Modify document and meeting Kittisak Isarapongporn
17:00 THAI NIPPON FOODS CO., LTD. 6.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Program design Nattapol Poeam
16:59 TOMAS TECH CO., LTD. 2.00 hours (Sales support #285 (Closed): Smart warehouse for AAPICO HITECH PUBLIC COMPANY LIMITED)
Meeting about expain concept for estimate cost Nattapol Poeam
16:54 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Suchin Viyasing
13:15 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Wiring cable in the cabinet Suchin Viyasing
16:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
14:07 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Teaching about WMS and handy Arunwit Isarapongporn
14:06 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Teaching about WMS and handy Arunwit Isarapongporn
00:57 ACME INDUSTRY CO.,LTD. 7.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Final teaching Kittisak Isarapongporn
14:06 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #266 (Closed): Make manual document for Pegasus)
Make manual document for Pegasus Arunwit Isarapongporn
14:05 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Sales support #36 (Closed): UPS can not use in some position at LINE model H9J )
A total of 11 UPS units were installed, but only 10 units could be installed due to a problem. One UPS had a power su... Arunwit Isarapongporn
14:02 ASIAN STANLEY. INTERNATIONAL LIMITED. 5.00 hours (Sales support #36 (Closed): UPS can not use in some position at LINE model H9J )
Arunwit Isarapongporn
14:03 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #225 (Closed): CCTV Installation)
CCTV Installation Arunwit Isarapongporn
01:12 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #128 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Update spec document revision 5 Kittisak Isarapongporn
01:02 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
Create NG Report page and store procedure Kittisak Isarapongporn

06 Dec 2023

23:23 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #267 (Closed): [Requirement definition] CKD process management system phase3)
Ryo Nozaki
23:22 STARS TECHNOLOGIES INDUSTRIAL LTD. 4.00 hours (Project progress work #272 (Closed): Proposal our company for MD)
Ryo Nozaki
23:21 FTS AUTOMOTIVE (THAILAND) CO.,LTD 2.00 hours (Sales support #231 (Closed): Replace procejet from D100 to KV8000 and XD02)
Create quote Ryo Nozaki
20:45 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
I/O Check TB-Box 1 Nattapol Poeam
18:16 MINEBEA ACCESSSOLUTIONS THAI LTD. 6.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
17:59 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #281 (Closed): Modify handy terminal & API of label printing system)
Soraya Norasing
17:49 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #281 (Closed): Modify handy terminal & API of label printing system)
fix api generate label / add column ref_id on RankCard, TapingLabel Tables Soraya Norasing
16:46 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #283 (Closed): THAI NISHIMATSU CONSTRUCTION CO.,LTD meeting and PR i-Reporter)
Ryo Nozaki
16:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
16:24 THAI NIPPON FOODS CO., LTD. 0.00 hour (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Sick Suchin Viyasing
14:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
13:10 YAMADA SOMBOON CO., LTD. 4.00 hours (Sales support #235 (Closed): Demo-kit for YAMADA SOMBOON)
Meeting about summarize concept with ATT and MetalicTF Nattapol Poeam
12:04 FTS AUTOMOTIVE (THAILAND) CO.,LTD 6.00 hours (Sales support #232 (Closed): Replace project from D100 to KV8000 and XD02)
Site survey at FTS Nattapol Poeam
11:58 THAI NIPPON FOODS CO., LTD. 2.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
Program design Nattapol Poeam
11:58 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
Program design Nattapol Poeam
11:57 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Return CC-TV equipment and provide training on CC-TV system installation. Nattapol Poeam
11:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #259 (Closed): Metalex 2023)
Metalex 2023 Santi Srichankaew
11:54 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #278 (Closed): PLC Bekido save outstanding )
Support finish Santi Srichankaew
11:49 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 4.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
Revised proposal and Meeting with Panasonic team Nattapol Poeam
 