Project

General

Profile

Activity

From 30 Nov 2023 to 09 Dec 2023

09 Dec 2023

16:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
03:12 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
coding inbound schedule page Soraya Norasing
03:11 ASIAN STANLEY. INTERNATIONAL LIMITED. 0.00 hour (Problem-Bug #291 (Closed): Found a problem with incorrect lot number dates.)
Soraya Norasing
03:04 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Problem-Bug #291 (Closed): Found a problem with incorrect lot number dates.)
Check and resolve issues with lot dates not matching work shifts. Test and update for customers. Soraya Norasing
02:44 ASIAN STANLEY. INTERNATIONAL LIMITED. 0.00 hour (Project progress work #290 (Closed): support user for update label printing handy app.)
Soraya Norasing
02:41 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #290 (Closed): support user for update label printing handy app.)
1.update label printing handy system for plcc line. 2.update label printing handy system for chip line 3.Verify the... Soraya Norasing

08 Dec 2023

23:29 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Adjust the initiate stock and Item Master Kittisak Isarapongporn
16:45 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #289 (Closed): Wiring cable in the cabinet 4 set)
Suchin Viyasing
16:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
14:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
14:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
07:41 TOMAS TECH CO., LTD. 4.00 hours (Sales support #288 (Closed): NSK Bearing Manufacturing (Thailand) co.ltd. proposal IoT system)
Meeting with customer and discussed about them recomend Ryo Nozaki

07 Dec 2023

22:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Sales support #287 (Closed): support user for label printing system)
Soraya Norasing
22:10 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #286 (Closed): Meeting about display on TV with customer)
Soraya Norasing
22:00 MINEBEA ACCESSSOLUTIONS THAI LTD. 3.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
17:07 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Modify backend API document Kittisak Isarapongporn
01:14 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Update backend API document Kittisak Isarapongporn
17:05 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Modify document and meeting Kittisak Isarapongporn
17:00 THAI NIPPON FOODS CO., LTD. 6.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Program design Nattapol Poeam
16:59 TOMAS TECH CO., LTD. 2.00 hours (Sales support #285 (Closed): Smart warehouse for AAPICO HITECH PUBLIC COMPANY LIMITED)
Meeting about expain concept for estimate cost Nattapol Poeam
16:54 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Suchin Viyasing
13:15 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Wiring cable in the cabinet Suchin Viyasing
16:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
14:07 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Teaching about WMS and handy Arunwit Isarapongporn
14:06 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Teaching about WMS and handy Arunwit Isarapongporn
00:57 ACME INDUSTRY CO.,LTD. 7.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Final teaching Kittisak Isarapongporn
14:06 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #266 (Closed): Make manual document for Pegasus)
Make manual document for Pegasus Arunwit Isarapongporn
14:05 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Sales support #36 (Closed): UPS can not use in some position at LINE model H9J )
A total of 11 UPS units were installed, but only 10 units could be installed due to a problem. One UPS had a power su... Arunwit Isarapongporn
14:02 ASIAN STANLEY. INTERNATIONAL LIMITED. 5.00 hours (Sales support #36 (Closed): UPS can not use in some position at LINE model H9J )
Arunwit Isarapongporn
14:03 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #225 (Closed): CCTV Installation)
CCTV Installation Arunwit Isarapongporn
01:12 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #128 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Update spec document revision 5 Kittisak Isarapongporn
01:02 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
Create NG Report page and store procedure Kittisak Isarapongporn

06 Dec 2023

23:23 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #267 (Closed): [Requirement definition] CKD process management system phase3)
Ryo Nozaki
23:22 STARS TECHNOLOGIES INDUSTRIAL LTD. 4.00 hours (Project progress work #272 (Closed): Proposal our company for MD)
Ryo Nozaki
23:21 FTS AUTOMOTIVE (THAILAND) CO.,LTD 2.00 hours (Sales support #231 (Closed): Replace procejet from D100 to KV8000 and XD02)
Create quote Ryo Nozaki
20:45 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
I/O Check TB-Box 1 Nattapol Poeam
18:16 MINEBEA ACCESSSOLUTIONS THAI LTD. 6.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
17:59 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #281 (Closed): Modify handy terminal & API of label printing system)
Soraya Norasing
17:49 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #281 (Closed): Modify handy terminal & API of label printing system)
fix api generate label / add column ref_id on RankCard, TapingLabel Tables Soraya Norasing
16:46 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #283 (Closed): THAI NISHIMATSU CONSTRUCTION CO.,LTD meeting and PR i-Reporter)
Ryo Nozaki
16:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
16:24 THAI NIPPON FOODS CO., LTD. 0.00 hour (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Sick Suchin Viyasing
14:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
13:10 YAMADA SOMBOON CO., LTD. 4.00 hours (Sales support #235 (Closed): Demo-kit for YAMADA SOMBOON)
Meeting about summarize concept with ATT and MetalicTF Nattapol Poeam
12:04 FTS AUTOMOTIVE (THAILAND) CO.,LTD 6.00 hours (Sales support #232 (Closed): Replace project from D100 to KV8000 and XD02)
Site survey at FTS Nattapol Poeam
11:58 THAI NIPPON FOODS CO., LTD. 2.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
Program design Nattapol Poeam
11:58 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
Program design Nattapol Poeam
11:57 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Return CC-TV equipment and provide training on CC-TV system installation. Nattapol Poeam
11:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #259 (Closed): Metalex 2023)
Metalex 2023 Santi Srichankaew
11:54 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #278 (Closed): PLC Bekido save outstanding )
Support finish Santi Srichankaew
11:49 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 4.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
Revised proposal and Meeting with Panasonic team Nattapol Poeam

05 Dec 2023

07:00 IIDA SEIMITSU (THAILAND) CO., LTD. 4.00 hours (Sales support #282 (Closed): Proposal IoT system for production line)
Meeting with CSI and undestand overview of project Ryo Nozaki

04 Dec 2023

21:05 ASIAN STANLEY. INTERNATIONAL LIMITED. 1.00 hour (Project progress work #277 (Closed): Modify handy terminal process control system)
Attach file Soraya Norasing
20:59 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #277 (Closed): Modify handy terminal process control system)
modify api and test app Soraya Norasing
20:57 TOMAS TECH CO., LTD. 5.00 hours (Sales support #20 (Closed): [FY2023]Common management for Soraya)
Meeting at Nikko Corporation(Thailand) Co., Ltd. Soraya Norasing
17:03 THAI NIPPON FOODS CO., LTD. 8.00 hours (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Install equipment & Wiring Suchin Viyasing
17:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function Santi Srichankaew
16:19 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function Santi Srichankaew
08:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function Santi Srichankaew
16:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
16:25 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
On site Test Printer label Complete / search item name or item no on tag generate label Complete Yutthapong Sricha
16:23 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
develop serarch item name on generate tag label / change dimansion label Yutthapong Sricha
16:20 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Excel Item Master version16 form ebisu , Design search item name in tag generate label Yutthapong Sricha

02 Dec 2023

10:05 NIKKO NILKHOSOL CO., LTD. 5.00 hours (Sales support #238 (Closed): Proposal for Production management sysytem)
Ryo Nozaki
10:03 FTS AUTOMOTIVE (THAILAND) CO.,LTD 4.00 hours (Sales support #231 (Closed): Replace procejet from D100 to KV8000 and XD02)
Ryo Nozaki

01 Dec 2023

23:44 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #52 (Closed): Issue topics)
Modify getStockFifo and convertItemUnitQty Kittisak Isarapongporn
16:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system (JavaScript + PHP). Kamol Anekchatnuntakool
08:21 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #278 (Closed): PLC Bekido save outstanding )
Support on site at ADVICS Santi Srichankaew

30 Nov 2023

22:37 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #277 (Closed): Modify handy terminal process control system)
Soraya Norasing
22:25 TOMAS TECH CO., LTD. 8.00 hours (Sales support #276 (Closed): Metalex event support and follow up customer)
Ryo Nozaki
22:24 SUMITRONICS (THAILAND) CO., LTD. 4.00 hours (Sales support #275 (Closed): Proposal smart watch system and fix asset management system)
Ryo Nozaki
22:23 RICOH MANUFACTURING (THAILAND) LTD. 4.00 hours (Project progress work #274 (Closed): Sales for pegasus ricoh staff)
Ryo Nozaki
22:19 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #273 (Closed): Support to update & test handy app and windows app)
Soraya Norasing
22:16 STARS TECHNOLOGIES INDUSTRIAL LTD. 3.00 hours (Project progress work #272 (Closed): Proposal our company for MD)
Ryo Nozaki
22:14 MATSUMOTO KOSAN (THAILAND) CO., LTD. 4.00 hours (Sales support #271 (Closed): ConMas i-Reporter proposal for Matsumoto Kosan (Thailand) Co.,Ltd. )
Ryo Nozaki
22:13 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #270 (Closed): UPS problem meeting at on-site)
Ryo Nozaki
21:22 MINEBEA ACCESSSOLUTIONS THAI LTD. 3.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Update the backend API document Kittisak Isarapongporn
21:19 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
CCTV installation demo and meeting about discuss the requirements with spec rev4. Kittisak Isarapongporn
20:45 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Program design Nattapol Poeam
20:43 TOMAS TECH CO., LTD. 4.00 hours (Sales support #269 (Closed): Automation for receiving and shipping of Fabrinet )
meeting about overview concept receiving and shipping Nattapol Poeam
20:37 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
Check for problems in data transmission between machines and data loss. Nattapol Poeam
20:36 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
Check for problems in data transmission between machines and data loss. Nattapol Poeam
20:33 ATA CASTING TECHNOLOGY CO., LTD. 4.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
Debug program PLC traceability for find problem of Data data found Nattapol Poeam
20:28 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Meeting and site survey about installation camera cctv point Nattapol Poeam
20:22 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Pick up CCTV equipment and training at Shadjan Prathumtani Nattapol Poeam
19:02 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
meeting Anonymous
19:01 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- Anonymous
19:00 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
18:59 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
16:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system (JavaScript + PHP). Kamol Anekchatnuntakool
11:08 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #267 (Closed): [Requirement definition] CKD process management system phase3)
Ryo Nozaki
 

Also available in: Atom