08 Dec 2023

23:29 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Adjust the initiate stock and Item Master Kittisak Isarapongporn
16:45 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #289 (Closed): Wiring cable in the cabinet 4 set)
Suchin Viyasing
16:44 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
14:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
14:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
07:41 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #288 (Closed): NSK Bearing Manufacturing (Thailand) co.ltd. proposal IoT system)
Meeting with customer and discussed about them recomend Ryo Nozaki

07 Dec 2023

22:24 Asian Stanley. International Limited 3.00 hours (Sales support #287 (Closed): support user for label printing system)
Soraya Norasing
22:10 Asian Stanley. International Limited 2.00 hours (Project progress work #286 (Closed): Meeting about display on TV with customer)
Soraya Norasing
22:00 Minebea AccessSolutions Thai Ltd 3.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
17:07 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Modify backend API document Kittisak Isarapongporn
01:14 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Update backend API document Kittisak Isarapongporn
17:05 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Modify document and meeting Kittisak Isarapongporn
17:00 Thai Nippon foods Co.,Ltd. 6.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Program design Nattapol Poeam
16:59 Tomas Tech Co.,Ltd. 2.00 hours (Sales support #285 (Closed): Smart warehouse for AAPICO HITECH PUBLIC COMPANY LIMITED)
Meeting about expain concept for estimate cost Nattapol Poeam
16:54 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Suchin Viyasing
13:15 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Wiring cable in the cabinet Suchin Viyasing
16:51 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
14:07 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Teaching about WMS and handy Arunwit Isarapongporn
14:06 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Teaching about WMS and handy Arunwit Isarapongporn
00:57 ACME INDUSTRY CO.,LTD. 7.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Final teaching Kittisak Isarapongporn
14:06 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #266 (Closed): Make manual document for Pegasus)
Make manual document for Pegasus Arunwit Isarapongporn
14:05 Asian Stanley. International Limited 8.00 hours (Sales support #36 (Closed): UPS can not use in some position at LINE model H9J )
A total of 11 UPS units were installed, but only 10 units could be installed due to a problem. One UPS had a power su... Arunwit Isarapongporn
14:02 Asian Stanley. International Limited 5.00 hours (Sales support #36 (Closed): UPS can not use in some position at LINE model H9J )
Arunwit Isarapongporn
14:03 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #225 (Closed): CCTV Installation)
CCTV Installation Arunwit Isarapongporn
01:12 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #128 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Update spec document revision 5 Kittisak Isarapongporn
01:02 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
Create NG Report page and store procedure Kittisak Isarapongporn

06 Dec 2023

23:23 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #267 (Closed): [Requirement definition] CKD process management system phase3)
Ryo Nozaki
23:22 Stars Technologies Industrial Ltd. 4.00 hours (Project progress work #272 (Closed): Proposal our company for MD)
Ryo Nozaki
23:21 FTS AUTOMOTIVE (THAILAND) CO.,LTD 2.00 hours (Sales support #231 (Closed): Replace procejet from D100 to KV8000 and XD02)
Create quote Ryo Nozaki
20:45 Thai Nippon foods Co.,Ltd. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
I/O Check TB-Box 1 Nattapol Poeam
18:16 Minebea AccessSolutions Thai Ltd 6.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
Soraya Norasing
17:59 Asian Stanley. International Limited 2.00 hours (Project progress work #281 (Closed): Modify handy terminal & API of label printing system)
Soraya Norasing
17:49 Asian Stanley. International Limited 8.00 hours (Project progress work #281 (Closed): Modify handy terminal & API of label printing system)
fix api generate label / add column ref_id on RankCard, TapingLabel Tables Soraya Norasing
16:46 Tomas Tech Co.,Ltd. 4.00 hours (Project progress work #283 (Closed): THAI NISHIMATSU CONSTRUCTION CO.,LTD meeting and PR i-Reporter)
Ryo Nozaki
16:46 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
16:24 Thai Nippon foods Co.,Ltd. 0.00 hour (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Sick Suchin Viyasing
14:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function LINE LINK PRODUCTION 20% Santi Srichankaew
13:10 YAMADA SOMBOON CO., LTD 4.00 hours (Sales support #235 (Closed): Demo-kit for YAMADA SOMBOON)
Meeting about summarize concept with ATT and MetalicTF Nattapol Poeam
12:04 FTS AUTOMOTIVE (THAILAND) CO.,LTD 6.00 hours (Sales support #232 (Closed): Replace project from D100 to KV8000 and XD02)
Site survey at FTS Nattapol Poeam
11:58 Thai Nippon foods Co.,Ltd. 2.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
Program design Nattapol Poeam
11:58 Thai Nippon foods Co.,Ltd. 4.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
Program design Nattapol Poeam
11:57 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Return CC-TV equipment and provide training on CC-TV system installation. Nattapol Poeam
11:56 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #259 (Closed): Metalex 2023)
Metalex 2023 Santi Srichankaew
11:54 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #278 (Closed): PLC Bekido save outstanding )
Support finish Santi Srichankaew
11:49 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 4.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
Revised proposal and Meeting with Panasonic team Nattapol Poeam

05 Dec 2023

07:00 IIDA SEIMITSU (THAILAND) CO., LTD. 4.00 hours (Sales support #282 (Closed): Proposal IoT system for production line)
Meeting with CSI and undestand overview of project Ryo Nozaki

04 Dec 2023

21:05 Asian Stanley. International Limited 1.00 hour (Project progress work #277 (Closed): Modify handy terminal process control system)
Attach file Soraya Norasing
20:59 Asian Stanley. International Limited 3.00 hours (Project progress work #277 (Closed): Modify handy terminal process control system)
modify api and test app Soraya Norasing
20:57 Tomas Tech Co.,Ltd. 5.00 hours (Sales support #20 (Closed): [FY2023]Common management for Soraya)
Meeting at Nikko Corporation(Thailand) Co., Ltd. Soraya Norasing
17:03 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #268 (Closed): Making control cabinet wiring 4set )
Install equipment & Wiring Suchin Viyasing
17:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function Santi Srichankaew
16:19 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function Santi Srichankaew
08:08 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function Santi Srichankaew
16:53 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #280 (Closed): Check Redmine function Due date)
Develop Check Redmine function Due date for Send Line. Kamol Anekchatnuntakool
16:25 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
On site Test Printer label Complete / search item name or item no on tag generate label Complete Yutthapong Sricha
16:23 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
develop serarch item name on generate tag label / change dimansion label Yutthapong Sricha
16:20 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Excel Item Master version16 form ebisu , Design search item name in tag generate label Yutthapong Sricha

02 Dec 2023

10:05 NIKKO NILKHOSOL CO., LTD. 5.00 hours (Sales support #238 (Closed): Proposal for Production management sysytem)
Ryo Nozaki
10:03 FTS AUTOMOTIVE (THAILAND) CO.,LTD 4.00 hours (Sales support #231 (Closed): Replace procejet from D100 to KV8000 and XD02)
Ryo Nozaki

01 Dec 2023

23:44 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #52 (Closed): Issue topics)
Modify getStockFifo and convertItemUnitQty Kittisak Isarapongporn
16:47 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system (JavaScript + PHP). Kamol Anekchatnuntakool
08:21 ADVICS Manufacturing(Thailand)Co.,Ltd. 8.00 hours (Project progress work #278 (Closed): PLC Bekido save outstanding )
Support on site at ADVICS Santi Srichankaew

30 Nov 2023

22:37 Asian Stanley. International Limited 4.00 hours (Project progress work #277 (Closed): Modify handy terminal process control system)
Soraya Norasing
22:25 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #276 (Closed): Metalex event support and follow up customer)
Ryo Nozaki
22:24 SUMITRONICS (THAILAND) CO., LTD 4.00 hours (Sales support #275 (Closed): Proposal smart watch system and fix asset management system)
Ryo Nozaki
22:23 Ricoh Manufacturing (Thailand) Ltd. 4.00 hours (Project progress work #274 (Closed): Sales for pegasus ricoh staff)
Ryo Nozaki
22:19 Asian Stanley. International Limited 4.00 hours (Project progress work #273 (Closed): Support to update & test handy app and windows app)
Soraya Norasing
22:16 Stars Technologies Industrial Ltd. 3.00 hours (Project progress work #272 (Closed): Proposal our company for MD)
Ryo Nozaki
22:14 Matsumoto Kosan (Thailand) Co.,Ltd. 4.00 hours (Sales support #271 (Closed): ConMas i-Reporter proposal for Matsumoto Kosan (Thailand) Co.,Ltd. )
Ryo Nozaki
22:13 Asian Stanley. International Limited 4.00 hours (Project progress work #270 (Closed): UPS problem meeting at on-site)
Ryo Nozaki
21:22 Minebea AccessSolutions Thai Ltd 3.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Update the backend API document Kittisak Isarapongporn
21:19 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
CCTV installation demo and meeting about discuss the requirements with spec rev4. Kittisak Isarapongporn
20:45 Thai Nippon foods Co.,Ltd. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Program design Nattapol Poeam
20:43 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #269 (Closed): Automation for receiving and shipping of Fabrinet )
meeting about overview concept receiving and shipping Nattapol Poeam
20:37 ATA Casting Technology Co., Ltd. 8.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
Check for problems in data transmission between machines and data loss. Nattapol Poeam
20:36 ATA Casting Technology Co., Ltd. 8.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
Check for problems in data transmission between machines and data loss. Nattapol Poeam
20:33 ATA Casting Technology Co., Ltd. 4.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
Debug program PLC traceability for find problem of Data data found Nattapol Poeam
20:28 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Meeting and site survey about installation camera cctv point Nattapol Poeam
20:22 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #225 (Closed): CCTV Installation)
Pick up CCTV equipment and training at Shadjan Prathumtani Nattapol Poeam
19:02 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
meeting Anonymous
19:01 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- Anonymous
19:00 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
18:59 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
16:43 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system (JavaScript + PHP). Kamol Anekchatnuntakool
11:08 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #267 (Closed): [Requirement definition] CKD process management system phase3)
Ryo Nozaki

29 Nov 2023

21:02 Asian Stanley. International Limited 8.00 hours (Problem-Bug #254 (Closed): Found a problem with data not being sent for printing, duplicate lot no.)
Soraya Norasing
18:50 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Update document and TO-DO list file Kittisak Isarapongporn
18:46 Minebea AccessSolutions Thai Ltd 5.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Create backend API communicate with HT Kittisak Isarapongporn
00:21 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Modify the DB store procedure Kittisak Isarapongporn
16:54 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #266 (Closed): Make manual document for Pegasus)
Arunwit Isarapongporn
16:50 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
Develop Drink order system (JavaScript). Kamol Anekchatnuntakool
16:42 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
get data api for create structure databse and create store procedure , in process update tag label generate search it... Yutthapong Sricha
16:38 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Import item master Excel v13 for data item master use inbound simple Yutthapong Sricha
16:36 Ebisu Foods Co Ltd. 6.00 hours (Project progress work #16 (Closed): WMS Web Development )
Modify Label Ebisu and check item master Excel Yutthapong Sricha
16:33 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Onsite Ebisu create table warehouse , zone , and modify add zone and warehoue for menu Location Master and test Print... Yutthapong Sricha
16:31 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Onsite Meeting Item Master add Zone and warehouse in Master Yutthapong Sricha
16:35 Asian Stanley. International Limited 2.00 hours (Sales support #264 (Closed): Meeting about display on TV)
Meeting online ASI about diaplay on TV and receive requirement update screen Yutthapong Sricha
08:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop calculate funation library bekido monitoring Santi Srichankaew
08:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop monitor display Santi Srichankaew
08:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop monitor display Santi Srichankaew
08:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Deverlop PLC calculate bekido function Santi Srichankaew
 