Activity
From 18 Nov 2023 to 27 Nov 2023
27 Nov 2023
- 23:19 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #257 (In Progress): Change design layout and modify function cancel
- -Edit the employee code scanning field To be able to key manual by yourself.
-Case where there is no work plan
In t... - 23:05 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #265 (Confirmation request): Meeting about label printing system
- customer requirements
1.Handy
- Added function to check lot number scanning of credit card.(No more than 13 digit)
... - 22:58 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #265 (Closed): Meeting about label printing system
- Listen to problems and results after using the system.
- 22:56 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #178 (Confirmation request): Support to start using the system for Label printing system
- 22:21 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #264 (Confirmation request): Meeting about display on TV
- -To explain the information displayed on the TV and verify its accuracy.
[customer requirements]
1.Display on TV
-... - 22:06 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #264 (Closed): Meeting about display on TV
- -To explain the information displayed on the TV and verify its accuracy.
- 17:00 TOMAS TECH CO., LTD. Sales support #256 (Confirmation request): Metalex 2023
- 16:59 A.N.I. LOGISTICS, LTD. Project progress work #225: CCTV Installation
- [ To day ]
Pick up the device to learn how to configure the device
[ Next action ]
Take the equipment for testing ... - 16:56 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Project progress work #230: MC30OP80 program modification and create document for k.Boonyarit
- Wait PO
- 16:50 TOMAS TECH CO., LTD. Project progress work #247: [Coding]Drink order system C#
- Develop Drink order system (JavaScript).
% Done 75 % - 15:28 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
- Today: check log error and Test scan qr-code
- 15:27 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
- wait user test
- 15:27 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: Test Outbound Simple
- 09:56 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus
- 09:48 TOMAS TECH CO., LTD. Sales support #262 (Closed): Metalex event support
- 09:48 TOMAS TECH CO., LTD. Sales support #262 (Closed): Metalex event support
- consumables
Anek 200 business cards
Novelty bag 240 pieces
IoT Catalog TH 1200 sheets *Not enough.
IoT catalog ... - 09:11 TOMAS TECH CO., LTD. Project progress work #260 (Close request): Metalex 2023
- 09:08 TOMAS TECH CO., LTD. Project progress work #261 (Closed): Smart watch addtional function at Smartwatch and Web
25 Nov 2023
- 09:26 TOMAS TECH CO., LTD. Project progress work #260 (Confirmation request): Metalex 2023
- 09:26 TOMAS TECH CO., LTD. Project progress work #260 (Closed): Metalex 2023
- Support Metalex 2023
- 09:26 TOMAS TECH CO., LTD. Project progress work #259 (Closed): Metalex 2023
- Support Metalex 2023
24 Nov 2023
- 18:15 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #258 (Close request): Packaging no data traceability at delta line.
- 18:15 TOMAS TECH CO., LTD. Project progress work #165 (Close request): IoT demo kit prepare box for Metarex at Nov
- 18:15 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #157 (Close request): Plant surgery install Trim and Chassis
- 18:15 ASTEER (THAILAND) CO., LTD. Project progress work #110 (Close request): [On-site support]Support after cutover
- 18:15 TOMAS TECH CO., LTD. Sales support #43 (Close request): Install SR-X300S at Pandora
- 18:15 ASTEER (THAILAND) CO., LTD. Project progress work #38 (Close request): Devolop and debug PLC Mitsubishi Q Series
- 18:15 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #23 (Close request): Addition to function skip process
- 18:15 ADVICS MANUFACTURING (THAILAND) CO., LTD. Project progress work #12 (Close request): Addition function display
- 17:07 ACME INDUSTRY CO.,LTD. Project progress work #52: Issue topics
- Fix new issues below
1. Prevent the scanning of the invalid label that doesn't have the packing standard.(HT)
2. Loca... - 16:52 TOMAS TECH CO., LTD. Project progress work #247: [Coding]Drink order system C#
- Develop Drink order system.
- 16:47 THAI NIPPON FOODS CO., LTD. Project progress work #248: Check List Equipment for Install in Cabinet
23 Nov 2023
- 16:56 TOMAS TECH CO., LTD. Project progress work #247: [Coding]Drink order system C#
- Develop Drink order system.
- 16:53 THAI NIPPON FOODS CO., LTD. Project progress work #248 (In Progress): Check List Equipment for Install in Cabinet
- 13:49 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #258 (Confirmation request): Packaging no data traceability at delta line.
- Check progrma no error.
- 13:41 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #258 (Closed): Packaging no data traceability at delta line.
- Problem
Data laser machine Over degit.
Cuase
Check data from laser conroller
action
Laser controller data ... - 13:34 ADVICS MANUFACTURING (THAILAND) CO., LTD. Project progress work #12 (Confirmation request): Addition function display
- Display play show is nomal.
Customer no comment - 13:31 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #23 (Confirmation request): Addition to function skip process
- Add function detect alarm
- 13:28 ASTEER (THAILAND) CO., LTD. Project progress work #38 (Confirmation request): Devolop and debug PLC Mitsubishi Q Series
- Deverlop program complate
- 13:23 ASTEER (THAILAND) CO., LTD. Project progress work #110 (Confirmation request): [On-site support]Support after cutover
- Installation complate
and test run - 13:20 TOMAS TECH CO., LTD. Sales support #43 (Confirmation request): Install SR-X300S at Pandora
- Follow keyence team
- 13:13 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #157 (Confirmation request): Plant surgery install Trim and Chassis
- Servey plant
- 13:04 TOMAS TECH CO., LTD. Project progress work #165 (Confirmation request): IoT demo kit prepare box for Metarex at Nov
- -Deverlop program PLC keyence KV-8000
-FTP Server installation
-FTP Client Installation
-Test comunication system
22 Nov 2023
- 22:04 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #254: Found a problem with data not being sent for printing, duplicate lot no.
- ***BUG*** [lists edited successfully]
“Problem”
1.Duplicat lot no.
2.problem with data not being sent for printin... - 21:41 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #257 (Closed): Change design layout and modify function cancel
- 1.change message alert from "Can't insert data" to "Already recorded"
2.set gravity to left.
3.add function cancel ... - 19:27 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: Test Inbound Simple
- 19:26 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
- wait user test
- 16:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
- wait user test
- 19:26 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
- Today: check log error and Test scan qr-code
- 16:51 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
- Today: check log error and Test scan qr-code
- 16:49 TOMAS TECH CO., LTD. Sales support #255 (Close request): Safety training at IEMT
- 16:44 TOMAS TECH CO., LTD. Project progress work #247: [Coding]Drink order system C#
- Develop Drink order system.
- 13:17 TOMAS TECH CO., LTD. Project progress work #166 (In Progress): IoT monitoring at web screen development PHP
- 08:35 TOMAS TECH CO., LTD. Sales support #256 (In Progress): Metalex 2023
- 08:35 TOMAS TECH CO., LTD. Sales support #256 (Closed): Metalex 2023
- Organize an exhibition
- 08:32 YAMADA SOMBOON CO., LTD. Sales support #235 (In Progress): Demo-kit for YAMADA SOMBOON
21 Nov 2023
- 17:55 TOMAS TECH CO., LTD. Sales support #255 (Confirmation request): Safety training at IEMT
- 17:53 TOMAS TECH CO., LTD. Sales support #255: Safety training at IEMT
- Safety training at IEMT
- 17:53 TOMAS TECH CO., LTD. Sales support #255 (Closed): Safety training at IEMT
- Safety training at IEMT 10:00-17:00
- 17:49 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #254 (In Progress): Found a problem with data not being sent for printing, duplicate lot no.
- Give advice to customers, investigate problems, find causes.
- 17:45 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #254 (Closed): Found a problem with data not being sent for printing, duplicate lot no.
- 1.Order to print but data not being sent for printing makes it unable to print.
2.Order printing at Menu defective l... - 17:34 A.N.I. LOGISTICS, LTD. Problem-Bug #253 (In Progress): Found a problem of not being able to use the tablet when the internet was down.
- I have tried following K.nack suggestions.
Still unable to verify - 17:31 A.N.I. LOGISTICS, LTD. Problem-Bug #253 (Closed): Found a problem of not being able to use the tablet when the internet was down.
- because the internet at the factory went down.
Makes the tablet unusable But Handy works normally.
Find a way to ch... - 17:19 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #97 (In Progress): [Coding]Android handyterminal BTA500
- -Meeting
-start developmert main fuction [login, main menu, other menu.] - 17:04 TOMAS TECH CO., LTD. Project progress work #247: [Coding]Drink order system C#
- Develop Drink order system.
- 16:17 Project progress work #252 (Close request): Traning Safety IEMT
- 08:36 Project progress work #252 (Confirmation request): Traning Safety IEMT
- 08:35 Project progress work #252 (Closed): Traning Safety IEMT
- Traning safety IEMT
- 16:17 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Sales support #249 (Close request): Traning safety at IEMT
- 16:17 TOMAS TECH CO., LTD. Project progress work #241 (Close request): Learning Keyence PLC
20 Nov 2023
- 22:58 A.N.I. LOGISTICS, LTD. Sales support #251 (Closed): ConMas i-Reporter proposal for A.N.I. LOGISTICS, LTD.
- 22:57 A.N.I. LOGISTICS, LTD. Sales support #251 (Closed): ConMas i-Reporter proposal for A.N.I. LOGISTICS, LTD.
- 22:56 FILCON FABRICS & TECHNOLOGY CO.,LTD. Sales support #250 (In Progress): ConMas i-Reporter proposal for FILCON FABRICS & TECHNOLOGY CO.,LTD.
- 22:56 FILCON FABRICS & TECHNOLOGY CO.,LTD. Sales support #250 (Closed): ConMas i-Reporter proposal for FILCON FABRICS & TECHNOLOGY CO.,LTD.
- 17:08 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Sales support #249 (Confirmation request): Traning safety at IEMT
- 17:08 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Sales support #249 (Closed): Traning safety at IEMT
- Traning safety
- 17:01 TOMAS TECH CO., LTD. Project progress work #247 (In Progress): [Coding]Drink order system C#
- Develop Drink order system.
- 08:42 TOMAS TECH CO., LTD. Project progress work #241 (Confirmation request): Learning Keyence PLC
- 08:35 THAI NIPPON FOODS CO., LTD. Project progress work #248 (Closed): Check List Equipment for Install in Cabinet
- -Check list equipment from supplier after Po.
-Install equipment in cabinet.
19 Nov 2023
- 11:31 TOMAS TECH CO., LTD. Project progress work #247 (Closed): [Coding]Drink order system C#
- Drink ordering system that can be used on smartphones
- 10:38 TOMAS TECH CO., LTD. Project progress work #246 (New): Web screen development for WD
- P.10 and P.11
!clipboard-202311191038-qypmo.png!
!clipboard-202311191038-wcfqh.png!
- 10:34 TOMAS TECH CO., LTD. Project progress work #166: IoT monitoring at web screen development PHP
- K.Nack K.Boy
please support it and teaching at 20th Nov krub - 10:30 PT.OKAYA INDONESIA Project progress work #245 (Closed): Make quote and delivery for HANDY TERMINAL 1 set PT PANASONIC GOBEL ENERGY INDONESIA
- 10:30 PT.OKAYA INDONESIA Project progress work #245 (Closed): Make quote and delivery for HANDY TERMINAL 1 set PT PANASONIC GOBEL ENERGY INDONESIA
- 10:27 A.N.I. LOGISTICS, LTD. Project progress work #244 (Closed): Make quote and delivery for ANI
- 10:27 A.N.I. LOGISTICS, LTD. Project progress work #244 (Closed): Make quote and delivery for ANI
- 10:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #185 (Closed): Tablet report system
- 10:12 ACME INDUSTRY CO.,LTD. Project progress work #142 (Closed): UAT about the WMS system and onsite support
- 10:03 ADVICS MANUFACTURING (THAILAND) CO., LTD. Problem-Bug #174 (Closed): Data outstanding on table bekido [support on site ]
- 10:03 ADVICS MANUFACTURING (THAILAND) CO., LTD. Sales support #140 (Closed): IOT Monitoring
- 10:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #139 (Closed): Meeting Kick off IOT bekido and OA monitoring
- 10:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #57 (Closed): Production IoT project requirements definition
- 10:03 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.
- 10:03 TOMAS TECH CO., LTD. Sales support #44 (Closed): CKD & Meji Meeting IOT Monitoring system
- 10:02 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105 (Closed): [Coding]Data linkage function
- 10:01 TOMAS TECH CO., LTD. Project progress work #193 (Closed): Test Program
- 10:01 TOMAS TECH CO., LTD. Project progress work #192 (Closed): Test Program & Outside
- 10:01 TOMAS TECH CO., LTD. Project progress work #191 (Closed): Test Program
- 10:01 A.N.I. LOGISTICS, LTD. Sales support #179 (Closed): Join the meeting at on-site
- 10:00 TOMAS TECH CO., LTD. Project progress work #194 (Closed): Test Program & Outside
- 10:00 TOMAS TECH CO., LTD. Project progress work #195 (Closed): Test Program
- 09:58 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2
- 09:57 ADVICS MANUFACTURING (THAILAND) CO., LTD. Project progress work #200 (Closed): Counter RH fucntion not operation
- 09:57 TOMAS TECH CO., LTD. Project progress work #203 (Closed): Test Program & Make document
- 09:56 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #207 (Closed): Meeting about review 3D Design
- 09:56 TOMAS TECH CO., LTD. Project progress work #212 (Closed): Check Relay contactor from supplier
- 09:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #145 (Closed): Plant survey install IOT JTEKT
- 09:31 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #216 (Closed): NMT1&2,Trim Chassis shop To install OCR system project
- 09:31 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Project progress work #218 (Closed): Wiring lan cable and power cable of LineMC30 OP80
- 09:30 KEYENCE (THAILAND) CO., LTD. Sales support #219 (Closed): Keyence meeting
- 09:30 THAI NIPPON FOODS CO., LTD. Project progress work #220 (Closed): Design drawing and confirm equipment
- 09:29 A.N.I. LOGISTICS, LTD. Problem-Bug #221 (Closed): Found the problem with the handy show "Schedule not found"
- 09:28 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #224 (Closed): Modify handy application for support rank card of PLCC line.
- 09:28 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #234 (Closed): show datetime SERVER on device resberry pi
18 Nov 2023
- 20:51 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
- wait user test
- 20:51 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
- Today: check log error and Test scan qr-code
- 20:50 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: Edit Inbound Customer And Outbound Customer And Test Inbound Simple
- 17:53 THAI NIPPON FOODS CO., LTD. Project progress work #242 (Close request): Program design and development
- 17:21 THAI NIPPON FOODS CO., LTD. Project progress work #242 (Confirmation request): Program design and development
- Please delete this issue because it was created incorrectly. krub
- 17:14 THAI NIPPON FOODS CO., LTD. Project progress work #242 (Closed): Program design and development
- Program design and development
- PLC
- Dashboard - 17:53 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #234 (Close request): show datetime SERVER on device resberry pi
- 17:53 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #224 (Close request): Modify handy application for support rank card of PLCC line.
- 17:53 THAI NIPPON FOODS CO., LTD. Project progress work #220 (Close request): Design drawing and confirm equipment
- 17:53 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #197 (Close request): Support installation HT-Label printing system Phase 2
- 17:53 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105 (Close request): [Coding]Data linkage function
- 15:22 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105 (Confirmation request): [Coding]Data linkage function
- Test Data linkage function.
- 17:23 THAI NIPPON FOODS CO., LTD. Project progress work #243 (In Progress): [ Task ] Program design and development
- 17:19 THAI NIPPON FOODS CO., LTD. Project progress work #243 (Closed): [ Task ] Program design and development
- Program design and development
- PLC
- Dashboard - 17:00 TOMAS TECH CO., LTD. Project progress work #241 (In Progress): Learning Keyence PLC
- 16:52 TOMAS TECH CO., LTD. Project progress work #241 (Closed): Learning Keyence PLC
- Learning Keyence PLC from VDO Training.
- 16:52 EBISU FOODS CO., LTD. Project progress work #16: WMS Web Development
- UPDATE API SAP to WMS
Detail in Excel
Update sql structure and store procedure on Server Ebisu - 16:17 TOMAS TECH CO., LTD. Sales support #24 (In Progress): [FY2023]Common management for Ryo Nozaki
- 16:15 ASTEER (THAILAND) CO., LTD. Project progress work #109 (In Progress): [On-site support]Support after cutover
- On site support
-Install Software
-Test Software
-Modify Software - 16:13 ASTEER (THAILAND) CO., LTD. Project progress work #240 (Closed): [Installation&On-site support] Handy terminal for Pokayoke system
- 16:12 ASTEER (THAILAND) CO., LTD. Project progress work #240 (Closed): [Installation&On-site support] Handy terminal for Pokayoke system
- 16:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Sales support #239 (In Progress): Handy terminal system re-placement for keyence handy terminal
- 16:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Sales support #239 (Closed): Handy terminal system re-placement for keyence handy terminal
- 16:07 NIKKO NILKHOSOL CO., LTD. Sales support #238 (In Progress): Proposal for Production management sysytem
- 16:07 NIKKO NILKHOSOL CO., LTD. Sales support #238 (Closed): Proposal for Production management sysytem
- 16:06 THAI HONDA MANUFACTURING CO., LTD. Sales support #237 (In Progress): Make proposal for IoT system
- 16:06 THAI HONDA MANUFACTURING CO., LTD. Sales support #237 (Closed): Make proposal for IoT system
- 16:04 YAMADA SOMBOON CO., LTD. Sales support #235: Demo-kit for YAMADA SOMBOON
- [ To day ]
- Make concept of Demo-kit
- Send concept to ATT,Metallic-F
[ Next Action ]
- Follow up price ATT,MTF
... - 15:59 YAMADA SOMBOON CO., LTD. Sales support #235 (Closed): Demo-kit for YAMADA SOMBOON
- Make concept and summarize equipment of Demo-Kit
- 16:03 NHK SPRING(THAILAND) CO.,LTD. Project progress work #236 (In Progress): ConMas i-Reporter proposal for NHK SPRING(THAILAND) CO.,LTD.
- 16:02 NHK SPRING(THAILAND) CO.,LTD. Project progress work #236 (Closed): ConMas i-Reporter proposal for NHK SPRING(THAILAND) CO.,LTD.
- proposal about i-Reporter for NHK
Machine check sheet and check operation and QC document
Also available in: Atom