25 Nov 2023

09:26 TOMAS TECH CO., LTD. Project progress work #260 (Confirmation request): Metalex 2023
Santi Srichankaew
09:26 TOMAS TECH CO., LTD. Project progress work #260 (Closed): Metalex 2023
Support Metalex 2023 Santi Srichankaew
09:26 TOMAS TECH CO., LTD. Project progress work #259 (Closed): Metalex 2023
Support Metalex 2023 Santi Srichankaew

24 Nov 2023

18:15 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #258 (Close request): Packaging no data traceability at delta line.
Kittisak Isarapongporn
18:15 TOMAS TECH CO., LTD. Project progress work #165 (Close request): IoT demo kit prepare box for Metarex at Nov
Kittisak Isarapongporn
18:15 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #157 (Close request): Plant surgery install Trim and Chassis
Kittisak Isarapongporn
18:15 ASTEER (THAILAND) CO., LTD. Project progress work #110 (Close request): [On-site support]Support after cutover
Kittisak Isarapongporn
18:15 TOMAS TECH CO., LTD. Sales support #43 (Close request): Install SR-X300S at Pandora
Kittisak Isarapongporn
18:15 ASTEER (THAILAND) CO., LTD. Project progress work #38 (Close request): Devolop and debug PLC Mitsubishi Q Series
Kittisak Isarapongporn
18:15 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #23 (Close request): Addition to function skip process
Kittisak Isarapongporn
18:15 ADVICS MANUFACTURING (THAILAND) CO., LTD. Project progress work #12 (Close request): Addition function display
Kittisak Isarapongporn
17:07 ACME INDUSTRY CO.,LTD. Project progress work #52: Issue topics
Fix new issues below
1. Prevent the scanning of the invalid label that doesn't have the packing standard.(HT)
2. Loca...
Kittisak Isarapongporn
16:52 TOMAS TECH CO., LTD. Project progress work #247: [Coding]Drink order system C#
Develop Drink order system. Kamol Anekchatnuntakool
16:47 THAI NIPPON FOODS CO., LTD. Project progress work #248: Check List Equipment for Install in Cabinet

Suchin Viyasing

23 Nov 2023

16:56 TOMAS TECH CO., LTD. Project progress work #247: [Coding]Drink order system C#
Develop Drink order system. Kamol Anekchatnuntakool
16:53 THAI NIPPON FOODS CO., LTD. Project progress work #248 (In Progress): Check List Equipment for Install in Cabinet
Suchin Viyasing
13:49 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #258 (Confirmation request): Packaging no data traceability at delta line.
Check progrma no error. Santi Srichankaew
13:41 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #258 (Closed): Packaging no data traceability at delta line.
Problem
Data laser machine Over degit.
Cuase
Check data from laser conroller
action
Laser controller data ...
Santi Srichankaew
13:34 ADVICS MANUFACTURING (THAILAND) CO., LTD. Project progress work #12 (Confirmation request): Addition function display
Display play show is nomal.
Customer no comment
Santi Srichankaew
13:31 ATA CASTING TECHNOLOGY CO., LTD. Project progress work #23 (Confirmation request): Addition to function skip process
Add function detect alarm Santi Srichankaew
13:28 ASTEER (THAILAND) CO., LTD. Project progress work #38 (Confirmation request): Devolop and debug PLC Mitsubishi Q Series
Deverlop program complate Santi Srichankaew
13:23 ASTEER (THAILAND) CO., LTD. Project progress work #110 (Confirmation request): [On-site support]Support after cutover
Installation complate
and test run
Santi Srichankaew
13:20 TOMAS TECH CO., LTD. Sales support #43 (Confirmation request): Install SR-X300S at Pandora
Follow keyence team Santi Srichankaew
13:13 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #157 (Confirmation request): Plant surgery install Trim and Chassis
Servey plant Santi Srichankaew
13:04 TOMAS TECH CO., LTD. Project progress work #165 (Confirmation request): IoT demo kit prepare box for Metarex at Nov
-Deverlop program PLC keyence KV-8000
-FTP Server installation
-FTP Client Installation
-Test comunication system
Santi Srichankaew

22 Nov 2023

22:04 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #254: Found a problem with data not being sent for printing, duplicate lot no.
***BUG*** [lists edited successfully]
“Problem”
1.Duplicat lot no.
2.problem with data not being sent for printin...
Soraya Norasing
21:41 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #257 (Closed): Change design layout and modify function cancel
1.change message alert from "Can't insert data" to "Already recorded"
2.set gravity to left.
3.add function cancel ...
Soraya Norasing
19:27 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
Today: Test Inbound Simple Anonymous
19:26 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
wait user test Anonymous
16:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
wait user test Anonymous
19:26 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
Today: check log error and Test scan qr-code Anonymous
16:51 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
Today: check log error and Test scan qr-code Anonymous
16:49 TOMAS TECH CO., LTD. Sales support #255 (Close request): Safety training at IEMT
Kittisak Isarapongporn
16:44 TOMAS TECH CO., LTD. Project progress work #247: [Coding]Drink order system C#
Develop Drink order system. Kamol Anekchatnuntakool
13:17 TOMAS TECH CO., LTD. Project progress work #166 (In Progress): IoT monitoring at web screen development PHP
Yutthapong Sricha
08:35 TOMAS TECH CO., LTD. Sales support #256 (In Progress): Metalex 2023
Nattapol Poeam
08:35 TOMAS TECH CO., LTD. Sales support #256 (Closed): Metalex 2023
Organize an exhibition Nattapol Poeam
08:32 YAMADA SOMBOON CO., LTD. Sales support #235 (In Progress): Demo-kit for YAMADA SOMBOON
Nattapol Poeam

21 Nov 2023

17:55 TOMAS TECH CO., LTD. Sales support #255 (Confirmation request): Safety training at IEMT
Soraya Norasing
17:53 TOMAS TECH CO., LTD. Sales support #255: Safety training at IEMT
Safety training at IEMT Soraya Norasing
17:53 TOMAS TECH CO., LTD. Sales support #255 (Closed): Safety training at IEMT
Safety training at IEMT 10:00-17:00 Soraya Norasing
17:49 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #254 (In Progress): Found a problem with data not being sent for printing, duplicate lot no.
Give advice to customers, investigate problems, find causes. Soraya Norasing
17:45 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #254 (Closed): Found a problem with data not being sent for printing, duplicate lot no.
1.Order to print but data not being sent for printing makes it unable to print.
2.Order printing at Menu defective l...
Soraya Norasing
17:34 A.N.I. LOGISTICS, LTD. Problem-Bug #253 (In Progress): Found a problem of not being able to use the tablet when the internet was down.
I have tried following K.nack suggestions.
Still unable to verify
Soraya Norasing
17:31 A.N.I. LOGISTICS, LTD. Problem-Bug #253 (Closed): Found a problem of not being able to use the tablet when the internet was down.
because the internet at the factory went down.
Makes the tablet unusable But Handy works normally.
Find a way to ch...
Soraya Norasing
17:19 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #97 (In Progress): [Coding]Android handyterminal BTA500
-Meeting
-start developmert main fuction [login, main menu, other menu.]
Soraya Norasing
17:04 TOMAS TECH CO., LTD. Project progress work #247: [Coding]Drink order system C#
Develop Drink order system. Kamol Anekchatnuntakool
16:17 Project progress work #252 (Close request): Traning Safety IEMT
Kittisak Isarapongporn
08:36 Project progress work #252 (Confirmation request): Traning Safety IEMT
Yutthapong Sricha
08:35 Project progress work #252 (Closed): Traning Safety IEMT
Traning safety IEMT Yutthapong Sricha
16:17 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Sales support #249 (Close request): Traning safety at IEMT
Kittisak Isarapongporn
16:17 TOMAS TECH CO., LTD. Project progress work #241 (Close request): Learning Keyence PLC
Kittisak Isarapongporn

20 Nov 2023

22:58 A.N.I. LOGISTICS, LTD. Sales support #251 (Closed): ConMas i-Reporter proposal for A.N.I. LOGISTICS, LTD.
Ryo Nozaki
22:57 A.N.I. LOGISTICS, LTD. Sales support #251 (Closed): ConMas i-Reporter proposal for A.N.I. LOGISTICS, LTD.
Ryo Nozaki
22:56 FILCON FABRICS & TECHNOLOGY CO.,LTD. Sales support #250 (In Progress): ConMas i-Reporter proposal for FILCON FABRICS & TECHNOLOGY CO.,LTD.
Ryo Nozaki
22:56 FILCON FABRICS & TECHNOLOGY CO.,LTD. Sales support #250 (Closed): ConMas i-Reporter proposal for FILCON FABRICS & TECHNOLOGY CO.,LTD.
Ryo Nozaki
17:08 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Sales support #249 (Confirmation request): Traning safety at IEMT
Nattapol Poeam
17:08 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Sales support #249 (Closed): Traning safety at IEMT
Traning safety Nattapol Poeam
17:01 TOMAS TECH CO., LTD. Project progress work #247 (In Progress): [Coding]Drink order system C#
Develop Drink order system. Kamol Anekchatnuntakool
08:42 TOMAS TECH CO., LTD. Project progress work #241 (Confirmation request): Learning Keyence PLC
Suchin Viyasing
08:35 THAI NIPPON FOODS CO., LTD. Project progress work #248 (Closed): Check List Equipment for Install in Cabinet
-Check list equipment from supplier after Po.
-Install equipment in cabinet.
Suchin Viyasing

19 Nov 2023

11:31 TOMAS TECH CO., LTD. Project progress work #247 (Closed): [Coding]Drink order system C#
Drink ordering system that can be used on smartphones Ryo Nozaki
10:38 TOMAS TECH CO., LTD. Project progress work #246 (New): Web screen development for WD
P.10 and P.11
!clipboard-202311191038-qypmo.png!
!clipboard-202311191038-wcfqh.png!
Ryo Nozaki
10:34 TOMAS TECH CO., LTD. Project progress work #166: IoT monitoring at web screen development PHP
K.Nack K.Boy
please support it and teaching at 20th Nov krub
Ryo Nozaki
10:30 PT.OKAYA INDONESIA Project progress work #245 (Closed): Make quote and delivery for HANDY TERMINAL 1 set PT PANASONIC GOBEL ENERGY INDONESIA
Ryo Nozaki
10:30 PT.OKAYA INDONESIA Project progress work #245 (Closed): Make quote and delivery for HANDY TERMINAL 1 set PT PANASONIC GOBEL ENERGY INDONESIA
Ryo Nozaki
10:27 A.N.I. LOGISTICS, LTD. Project progress work #244 (Closed): Make quote and delivery for ANI
Ryo Nozaki
10:27 A.N.I. LOGISTICS, LTD. Project progress work #244 (Closed): Make quote and delivery for ANI
Ryo Nozaki
10:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #185 (Closed): Tablet report system
Ryo Nozaki
10:12 ACME INDUSTRY CO.,LTD. Project progress work #142 (Closed): UAT about the WMS system and onsite support
Ryo Nozaki
10:03 ADVICS MANUFACTURING (THAILAND) CO., LTD. Problem-Bug #174 (Closed): Data outstanding on table bekido [support on site ]
Ryo Nozaki
10:03 ADVICS MANUFACTURING (THAILAND) CO., LTD. Sales support #140 (Closed): IOT Monitoring
Ryo Nozaki
10:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #139 (Closed): Meeting Kick off IOT bekido and OA monitoring
Ryo Nozaki
10:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #57 (Closed): Production IoT project requirements definition
Ryo Nozaki
10:03 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.
Ryo Nozaki
10:03 TOMAS TECH CO., LTD. Sales support #44 (Closed): CKD & Meji Meeting IOT Monitoring system
Ryo Nozaki
10:02 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105 (Closed): [Coding]Data linkage function
Ryo Nozaki
10:01 TOMAS TECH CO., LTD. Project progress work #193 (Closed): Test Program
Ryo Nozaki
10:01 TOMAS TECH CO., LTD. Project progress work #192 (Closed): Test Program & Outside
Ryo Nozaki
10:01 TOMAS TECH CO., LTD. Project progress work #191 (Closed): Test Program
Ryo Nozaki
10:01 A.N.I. LOGISTICS, LTD. Sales support #179 (Closed): Join the meeting at on-site
Ryo Nozaki
10:00 TOMAS TECH CO., LTD. Project progress work #194 (Closed): Test Program & Outside
Ryo Nozaki
10:00 TOMAS TECH CO., LTD. Project progress work #195 (Closed): Test Program
Ryo Nozaki
09:58 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2
Ryo Nozaki
09:57 ADVICS MANUFACTURING (THAILAND) CO., LTD. Project progress work #200 (Closed): Counter RH fucntion not operation
Ryo Nozaki
09:57 TOMAS TECH CO., LTD. Project progress work #203 (Closed): Test Program & Make document
Ryo Nozaki
09:56 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #207 (Closed): Meeting about review 3D Design
Ryo Nozaki
09:56 TOMAS TECH CO., LTD. Project progress work #212 (Closed): Check Relay contactor from supplier
Ryo Nozaki
09:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #145 (Closed): Plant survey install IOT JTEKT
Ryo Nozaki
09:31 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #216 (Closed): NMT1&2,Trim Chassis shop To install OCR system project
Ryo Nozaki
09:31 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Project progress work #218 (Closed): Wiring lan cable and power cable of LineMC30 OP80
Ryo Nozaki
09:30 KEYENCE (THAILAND) CO., LTD. Sales support #219 (Closed): Keyence meeting
Ryo Nozaki
09:30 THAI NIPPON FOODS CO., LTD. Project progress work #220 (Closed): Design drawing and confirm equipment
Ryo Nozaki
09:29 A.N.I. LOGISTICS, LTD. Problem-Bug #221 (Closed): Found the problem with the handy show "Schedule not found"
Ryo Nozaki
09:28 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #224 (Closed): Modify handy application for support rank card of PLCC line.
Ryo Nozaki
09:28 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #234 (Closed): show datetime SERVER on device resberry pi
Ryo Nozaki

18 Nov 2023

20:51 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88: NSET - Compo detail (Add new slip)
wait user test Anonymous
20:51 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76: NSET - Reprint FG slip & Traceability system by Handy
Today: check log error and Test scan qr-code Anonymous
20:50 EBISU FOODS CO., LTD. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
Today: Edit Inbound Customer And Outbound Customer And Test Inbound Simple
Anonymous
17:53 THAI NIPPON FOODS CO., LTD. Project progress work #242 (Close request): Program design and development
Kittisak Isarapongporn
17:21 THAI NIPPON FOODS CO., LTD. Project progress work #242 (Confirmation request): Program design and development
Please delete this issue because it was created incorrectly. krub Nattapol Poeam
17:14 THAI NIPPON FOODS CO., LTD. Project progress work #242 (Closed): Program design and development
Program design and development
- PLC
- Dashboard
Nattapol Poeam
17:53 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #234 (Close request): show datetime SERVER on device resberry pi
Kittisak Isarapongporn
17:53 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #224 (Close request): Modify handy application for support rank card of PLCC line.
Kittisak Isarapongporn
17:53 THAI NIPPON FOODS CO., LTD. Project progress work #220 (Close request): Design drawing and confirm equipment
Kittisak Isarapongporn
17:53 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #197 (Close request): Support installation HT-Label printing system Phase 2
Kittisak Isarapongporn
17:53 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105 (Close request): [Coding]Data linkage function
Kittisak Isarapongporn
15:22 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105 (Confirmation request): [Coding]Data linkage function
Test Data linkage function. Kamol Anekchatnuntakool
17:23 THAI NIPPON FOODS CO., LTD. Project progress work #243 (In Progress): [ Task ] Program design and development
Nattapol Poeam
17:19 THAI NIPPON FOODS CO., LTD. Project progress work #243 (Closed): [ Task ] Program design and development
Program design and development
- PLC
- Dashboard
Nattapol Poeam
17:00 TOMAS TECH CO., LTD. Project progress work #241 (In Progress): Learning Keyence PLC
Suchin Viyasing
16:52 TOMAS TECH CO., LTD. Project progress work #241 (Closed): Learning Keyence PLC
Learning Keyence PLC from VDO Training. Suchin Viyasing
16:52 EBISU FOODS CO., LTD. Project progress work #16: WMS Web Development
UPDATE API SAP to WMS
Detail in Excel
Update sql structure and store procedure on Server Ebisu
Yutthapong Sricha
16:17 TOMAS TECH CO., LTD. Sales support #24 (In Progress): [FY2023]Common management for Ryo Nozaki
Ryo Nozaki
16:15 ASTEER (THAILAND) CO., LTD. Project progress work #109 (In Progress): [On-site support]Support after cutover
On site support
-Install Software
-Test Software
-Modify Software
Kamol Anekchatnuntakool
16:13 ASTEER (THAILAND) CO., LTD. Project progress work #240 (Closed): [Installation&On-site support] Handy terminal for Pokayoke system
Ryo Nozaki
16:12 ASTEER (THAILAND) CO., LTD. Project progress work #240 (Closed): [Installation&On-site support] Handy terminal for Pokayoke system
Ryo Nozaki
16:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Sales support #239 (In Progress): Handy terminal system re-placement for keyence handy terminal
Ryo Nozaki
16:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Sales support #239 (Closed): Handy terminal system re-placement for keyence handy terminal
Ryo Nozaki
16:07 NIKKO NILKHOSOL CO., LTD. Sales support #238 (In Progress): Proposal for Production management sysytem
Ryo Nozaki
16:07 NIKKO NILKHOSOL CO., LTD. Sales support #238 (Closed): Proposal for Production management sysytem
Ryo Nozaki
16:06 THAI HONDA MANUFACTURING CO., LTD. Sales support #237 (In Progress): Make proposal for IoT system
Ryo Nozaki
16:06 THAI HONDA MANUFACTURING CO., LTD. Sales support #237 (Closed): Make proposal for IoT system
Ryo Nozaki
16:04 YAMADA SOMBOON CO., LTD. Sales support #235: Demo-kit for YAMADA SOMBOON
[ To day ]
- Make concept of Demo-kit
- Send concept to ATT,Metallic-F
[ Next Action ]
- Follow up price ATT,MTF
...
Nattapol Poeam
15:59 YAMADA SOMBOON CO., LTD. Sales support #235 (Closed): Demo-kit for YAMADA SOMBOON
Make concept and summarize equipment of Demo-Kit Nattapol Poeam
16:03 NHK SPRING(THAILAND) CO.,LTD. Project progress work #236 (In Progress): ConMas i-Reporter proposal for NHK SPRING(THAILAND) CO.,LTD.
Ryo Nozaki
16:02 NHK SPRING(THAILAND) CO.,LTD. Project progress work #236 (Closed): ConMas i-Reporter proposal for NHK SPRING(THAILAND) CO.,LTD.
proposal about i-Reporter for NHK
Machine check sheet and check operation and QC document
Ryo Nozaki

17 Nov 2023

19:08 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #197 (Confirmation request): Support installation HT-Label printing system Phase 2
-remote update Handy & windows app Soraya Norasing
19:06 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #224 (Confirmation request): Modify handy application for support rank card of PLCC line.
[Handy-Update list]
-PLCC rank card can be scanned.
-Notify if the machine is working Show the time the machine is ...
Soraya Norasing
16:56 THAI NIPPON FOODS CO., LTD. Project progress work #87: IoT Equipment for machine operation project
- Pick up your equipment at TNF.
- Design data from machine and I/O
Nattapol Poeam
16:55 THAI NIPPON FOODS CO., LTD. Project progress work #220 (Confirmation request): Design drawing and confirm equipment
Suchin Viyasing
16:35 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #234 (Confirmation request): show datetime SERVER on device resberry pi
Yutthapong Sricha
16:34 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #234 (Closed): show datetime SERVER on device resberry pi
ปัญหาเกิดจาก ResberryPi ไม่สามารถใช้ internet เพื่อ sync เวลาปัจจุบันได้ทำให้เวลา แสดงผล website ที่มีการอ้างอิงเวลา ... Yutthapong Sricha

16 Nov 2023

23:10 ADVICS MANUFACTURING (THAILAND) CO., LTD. Sales support #164: IoT system for CNC line follow up
- Estimate cost
- Estimate time
* I'm not sure about data extraction from CNC machines.
Nattapol Poeam
21:52 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #224 (In Progress): Modify handy application for support rank card of PLCC line.
-Explain the work that needs to be fixed to the Windows app to K.Ball.
-Test Windows App.
-fix the Handy App, scan ...
Soraya Norasing
16:56 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105: [Coding]Data linkage function
Develop Data linkage function.
% Done : 95 %
Kamol Anekchatnuntakool
16:53 ADVICS MANUFACTURING (THAILAND) CO., LTD. Problem-Bug #174 (Close request): Data outstanding on table bekido [support on site ]
Kittisak Isarapongporn
13:35 ADVICS MANUFACTURING (THAILAND) CO., LTD. Problem-Bug #174 (Confirmation request): Data outstanding on table bekido [support on site ]
Problem
Model RH can not counter display
Cause
Fuction RH can not read value
action
Add function cuonter
Santi Srichankaew
16:53 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #145 (Close request): Plant survey install IOT JTEKT
Kittisak Isarapongporn
13:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #145 (Confirmation request): Plant survey install IOT JTEKT
Plant survey install IOT JTEKT Santi Srichankaew
16:53 ADVICS MANUFACTURING (THAILAND) CO., LTD. Sales support #140 (Close request): IOT Monitoring
Kittisak Isarapongporn
13:53 ADVICS MANUFACTURING (THAILAND) CO., LTD. Sales support #140 (Confirmation request): IOT Monitoring
Suevey CNC machine . Santi Srichankaew
13:53 ADVICS MANUFACTURING (THAILAND) CO., LTD. Sales support #140 (In Progress): IOT Monitoring
CNC IOT monitoring Santi Srichankaew
16:53 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #139 (Close request): Meeting Kick off IOT bekido and OA monitoring
Kittisak Isarapongporn
13:59 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #139 (Confirmation request): Meeting Kick off IOT bekido and OA monitoring
Meeting Kick off IOT bekido and OA monitoring Santi Srichankaew
13:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #139 (In Progress): Meeting Kick off IOT bekido and OA monitoring
Meeting Kick off IOT bekido and OA monitoring Santi Srichankaew
16:53 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #57 (Close request): Production IoT project requirements definition
Kittisak Isarapongporn
14:00 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #57 (Confirmation request): Production IoT project requirements definition
Production IoT project requirements definition Santi Srichankaew
16:53 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #55 (Close request): handy terminal BT-A500 coding with Java Android.
Kittisak Isarapongporn
16:53 TOMAS TECH CO., LTD. Sales support #44 (Close request): CKD & Meji Meeting IOT Monitoring system
Kittisak Isarapongporn
14:05 TOMAS TECH CO., LTD. Sales support #44 (Confirmation request): CKD & Meji Meeting IOT Monitoring system
CKD & Meji Meeting IOT Monitoring system Santi Srichankaew
16:00 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Project progress work #230 (In Progress): MC30OP80 program modification and create document for k.Boonyarit
Nattapol Poeam
14:12 ASTEER (THAILAND) CO., LTD. Project progress work #110: [On-site support]Support after cutover
Waiting installationon site Santi Srichankaew
14:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #141 (In Progress): [Task]Deverlop HMI Bekido and OA monitoring
Deverlop plc Bekido and OA monitoring
Deverlop HMI Bekido and OA monitoring
Santi Srichankaew
14:08 TOMAS TECH CO., LTD. Sales support #31 (In Progress): [FY2023]Common management for Santi
[FY2023]Common management for Santi Santi Srichankaew
13:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #124 (In Progress): [Installation&On-site support] Production IoT system for JATH
Deverlob PLC bekido LINK machine
Deverlob HMI bekido LINK machine
Deverlob web monitoring bekido LINK machine
Santi Srichankaew
13:52 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #157 (In Progress): Plant surgery install Trim and Chassis
Survey NMT plant Santi Srichankaew
11:57 TOMAS TECH CO., LTD. Project progress work #233 (In Progress): Edit the data transmission concept of the Demo-Box line notify alert job.
Nattapol Poeam
11:54 TOMAS TECH CO., LTD. Project progress work #233 (Closed): Edit the data transmission concept of the Demo-Box line notify alert job.
- Change the concept of data transmission between PC and PLC. Previously using FTP File CSV method to PC caused a pro... Nattapol Poeam
11:39 TOMAS TECH CO., LTD. Project progress work #165 (In Progress): IoT demo kit prepare box for Metarex at Nov
Nattapol Poeam
11:15 FTS AUTOMOTIVE (THAILAND) CO.,LTD Sales support #232 (Closed): Replace project from D100 to KV8000 and XD02
Customers utilize the D100 to collect data from Omron PLCs.
Replace D100 with KV8000 and XD02.
Installation and wir...
Ryo Nozaki
11:15 FTS AUTOMOTIVE (THAILAND) CO.,LTD Sales support #231 (In Progress): Replace procejet from D100 to KV8000 and XD02
Ryo Nozaki
11:15 FTS AUTOMOTIVE (THAILAND) CO.,LTD Sales support #231 (Closed): Replace procejet from D100 to KV8000 and XD02
Customers utilize the D100 to collect data from Omron PLCs.
Replace D100 with KV8000 and XD02.
Installation and wir...
Ryo Nozaki
 