Activity
From 13 Nov 2023 to 22 Nov 2023
22 Nov 2023
- 22:04 Asian Stanley. International Limited 8.00 hours (Problem-Bug #254 (Closed): Found a problem with data not being sent for printing, duplicate lot no.)
- 21:42 Nidec Techno Motor (Thailand) Co.,Ltd. 1.00 hour (Project progress work #257 (Closed): Change design layout and modify function cancel)
- [Fixed] - change message alert from "Can't insert data" to "Already recorded" - set gravity to left.
- 19:27 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- 19:26 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #88 (Closed): NSET - Compo detail (Add new slip))
- 19:26 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- 17:01 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #248 (Closed): Check List Equipment for Install in Cabinet)
- 16:46 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
- Modify the spec revision 3 and update the TODO list
- 16:45 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- DB Design and confirm the outbound spec detail
- 16:44 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
- Develop Drink order system.
- 16:38 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- Modify structure, Store procedure, Item Master API SAP to WMS
- 13:07 Ebisu Foods Co Ltd. 7.00 hours (Project progress work #16 (Closed): WMS Web Development )
- API SAP to WMS
- 13:17 Tomas Tech Co.,Ltd. 1.00 hour (Project progress work #166 (In Progress): IoT monitoring at web screen development PHP)
- 08:40 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 2.00 hours (Sales support #249 (Closed): Traning safety at IEMT)
- Training safety at IEMT
- 08:38 Thai Nippon foods Co.,Ltd. 4.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Program design
- 08:36 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #256 (Closed): Metalex 2023)
- Set up booths for exhibitions
21 Nov 2023
- 17:53 Tomas Tech Co.,Ltd. 7.00 hours (Sales support #255 (Closed): Safety training at IEMT)
- safety trainning at IEMT
- 17:49 Asian Stanley. International Limited 2.00 hours (Problem-Bug #254 (Closed): Found a problem with data not being sent for printing, duplicate lot no.)
- 17:34 A.N.I. LOGISTICS, LTD. 3.00 hours (Problem-Bug #253 (Closed): Found a problem of not being able to use the tablet when the internet was down.)
- 17:21 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- Study the specifications and understand. and meeting with K.nack
- 17:19 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #97 (Closed): [Coding]Android handyterminal BTA500)
- 17:20 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #52 (Closed): Issue topics)
- Integrate and test the BT print function
- 17:15 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
- UAT and teaching
- 17:14 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
- Modify the spec from the last meeting and prepare the data for tomorrow meeting.
- 17:10 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Hold the meeting about the spec confirm and assign the job to dev team
- 17:04 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
- Develop Drink order system.
- 17:02 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #248 (Closed): Check List Equipment for Install in Cabinet)
- Go to Bitec Bang-na at 1:00 Pm. With Mr.Santi &Mr.Nattapol for the setting demo PLC.
- 16:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
- Deverlop PLC calculate bekido function
- 08:36 4.00 hours (Project progress work #252 (Closed): Traning Safety IEMT)
- Traning Safety IEMT
- 08:33 Ebisu Foods Co Ltd. 4.00 hours (Project progress work #16 (Closed): WMS Web Development )
- modify store procedure for API SAP to WMS
- 08:06 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #241 (Closed): Learning Keyence PLC)
- Learning Plc Keyence
20 Nov 2023
- 22:58 A.N.I. LOGISTICS, LTD. 2.00 hours (Sales support #251 (Closed): ConMas i-Reporter proposal for A.N.I. LOGISTICS, LTD.)
- 22:56 FILCON FABRICS & TECHNOLOGY CO.,LTD. 4.00 hours (Sales support #250 (Closed): ConMas i-Reporter proposal for FILCON FABRICS & TECHNOLOGY CO.,LTD. )
- 22:54 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #10 (Closed): Creating a specification document)
- 17:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Internal meeting about function caculation
- 17:01 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #247 (Closed): [Coding]Drink order system C#)
- Develop Drink order system.
- 16:47 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #248 (Closed): Check List Equipment for Install in Cabinet)
- 16:37 Asian Stanley. International Limited 8.00 hours (Problem-Bug #37 (Closed): UPS have problem)
- 30/11/2023 K.Arunwit to changed UPS
- 08:42 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #241 (Closed): Learning Keyence PLC)
19 Nov 2023
- 10:30 PT.OKAYA INDONESIA 3.00 hours (Project progress work #245 (Closed): Make quote and delivery for HANDY TERMINAL 1 set PT PANASONIC GOBEL ENERGY INDONESIA)
- 10:27 A.N.I. LOGISTICS, LTD. 3.00 hours (Project progress work #244 (Closed): Make quote and delivery for ANI)
18 Nov 2023
- 20:51 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #88 (Closed): NSET - Compo detail (Add new slip))
- 20:51 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
- 20:50 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- 17:57 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
- Add the unconfirm function to Inbound inquiry report (Revoke the confirm by QC)
- 17:56 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Spec confirmation with k.Ryo and meeting about the handy functions, will hold the meeting to update to K.So again on ...
- 17:22 Thai Nippon foods Co.,Ltd. 6.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
- Program design
- 16:52 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- 16:17 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #24 (Closed): [FY2023]Common management for Ryo Nozaki)
- Meeting with Asprova
- 16:15 Asteer (Thailand) Co., Ltd. 8.00 hours (Project progress work #109 (Closed): [On-site support]Support after cutover)
- On site support -Install Software -Test Software -Modify Software
- 16:13 Asteer (Thailand) Co., Ltd. 6.00 hours (Project progress work #240 (Closed): [Installation&On-site support] Handy terminal for Pokayoke system)
- Install complete and we must modification of some comment
- 16:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Sales support #239 (Closed): Handy terminal system re-placement for keyence handy terminal)
- Meeting with Japanese person of Mazda and Keyence
- 16:07 NIKKO NILKHOSOL CO., LTD. 4.00 hours (Sales support #238 (Closed): Proposal for Production management sysytem)
- 16:06 Thai Honda Manufacturing Co., Ltd 4.00 hours (Sales support #237 (Closed): Make proposal for IoT system)
- 16:04 FTS AUTOMOTIVE (THAILAND) CO.,LTD 4.00 hours (Sales support #231 (Closed): Replace procejet from D100 to KV8000 and XD02)
- 16:04 YAMADA SOMBOON CO., LTD 2.00 hours (Sales support #235 (Closed): Demo-kit for YAMADA SOMBOON)
- Make concept demo-kit
- 16:03 NHK SPRING(THAILAND) CO.,LTD. 4.00 hours (Project progress work #236 (Closed): ConMas i-Reporter proposal for NHK SPRING(THAILAND) CO.,LTD. )
- 15:20 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
- Test Data linkage function.
17 Nov 2023
- 19:08 Asian Stanley. International Limited 1.00 hour (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
- 19:06 Asian Stanley. International Limited 8.00 hours (Project progress work #224 (Closed): Modify handy application for support rank card of PLCC line.)
- 16:59 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #223 (Closed): Internal check stock)
- Internal check stock
- 16:58 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #233 (Closed): Edit the data transmission concept of the Demo-Box line notify alert job.)
- Revised concept about format PLC send to PLC and Data memory
- 16:56 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
- Prorgam design
- 16:55 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
- 16:40 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #52 (Closed): Issue topics)
- Fix the store procedure to support to create the schedule with minimum outbound qty
- 16:38 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #52 (Closed): Issue topics)
- Show outsource information in schedule / check and fix the schedule generate related with outsource BOM
- 16:37 Ebisu Foods Co Ltd. 5.00 hours (Project progress work #16 (Closed): WMS Web Development )
- create schema database import return request API form SAP , create store convert to ProductionSchedule
- 16:34 Asian Stanley. International Limited 3.00 hours (Problem-Bug #234 (Closed): show datetime SERVER on device resberry pi )
- Modify screen 1,2,3
- 11:36 NTPT Company Limited. 8.00 hours (Project progress work #49 (Closed): ConMas i-Reporter tablet quote 43sets)
- Setup Applications of ConMas i-Reporter tablet quote 43sets
- 11:34 NTPT Company Limited. 8.00 hours (Project progress work #49 (Closed): ConMas i-Reporter tablet quote 43sets)
- Setup Applications of ConMas i-Reporter tablet quote 43sets
- 11:33 NTPT Company Limited. 8.00 hours (Project progress work #49 (Closed): ConMas i-Reporter tablet quote 43sets)
- Setup Applications of ConMas i-Reporter tablet quote 43sets
16 Nov 2023
- 23:10 ADVICS Manufacturing(Thailand)Co.,Ltd. 2.00 hours (Sales support #164 (Closed): IoT system for CNC line follow up)
- Estimate cost of loss analysis cnc line project
- 21:52 Asian Stanley. International Limited 8.00 hours (Project progress work #224 (Closed): Modify handy application for support rank card of PLCC line.)
- 17:00 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
- 16:56 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
- Develop Data linkage function.
- 16:53 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- Change Label / Modify store API Sales Order convert to ProductionSchedule /
- 16:52 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
- Create OUTSOURCE information to remark / Cancel the confirmation by QC staff
- 16:24 Tomas Tech Co.,Ltd. 3.00 hours (Project progress work #233 (Closed): Edit the data transmission concept of the Demo-Box line notify alert job.)
- Support K.Santi and K.Kamol test Demo-Kit
- 11:57 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #233 (Closed): Edit the data transmission concept of the Demo-Box line notify alert job.)
- Meeting about change new concept send and receive data between PC <> PLC
- 16:00 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 1.00 hour (Project progress work #230 (Closed): MC30OP80 program modification and create document for k.Boonyarit)
- Make proposal addition program record data to CF-Card lineMC30 OP80 IEMT
- 14:12 Asteer (Thailand) Co., Ltd. 4.00 hours (Project progress work #110 (Closed): [On-site support]Support after cutover)
- 14:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- 13:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
- 13:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Sales support #139 (Closed): Meeting Kick off IOT bekido and OA monitoring)
15 Nov 2023
- 22:45 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.)
- 22:41 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.)
- develop insert function and responce
- 17:35 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #52 (Closed): Issue topics)
- Test and fix bug
- 17:07 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
- 16:56 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
- Internal meeting about make schedule and Explain the details of the work and the entire work scope of this work.
- 16:50 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- 16:49 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
- Develop Export Inventory information File.
- 16:29 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #176 (Closed): SATO label print via Bluetooth)
- 15:51 ADVICS Manufacturing(Thailand)Co.,Ltd. 6.00 hours (Sales support #217 (Closed): Meeting about Loss analysis system IoT project ( New Project ))
- Meeting and site survey about monitoring system
- 15:29 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 4.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
- Explore additional work sites about testing reading Supplier barcodes and collecting additional information about cus...
- 15:19 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
- 15:19 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
- Meeting at online
- 14:59 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 5.00 hours (Project progress work #218 (Closed): Wiring lan cable and power cable of LineMC30 OP80)
- Install complete
- 14:12 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- SO SAP , strore proceder sql import sales order / change Label formatter
- 14:10 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- Install WMS Pegasus ON server Ebisu , config DBConfig.php , global_env.php, Memcached_pool.php
- 13:17 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #31 (Closed): [FY2023]Common management for Santi)
- PC deverlop
- 13:14 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #165 (Closed): IoT demo kit prepare box for Metarex at Nov)
- IoT demo kit prepare box for Metarex at Nov
- 13:13 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #165 (Closed): IoT demo kit prepare box for Metarex at Nov)
- IoT demo kit prepare box for Metarex at Nov
- 10:33 JYOHO SYSTEMS S.A. DE C.V. 2.00 hours (Sales support #229 (Closed): Sales pegasus package and contact for mexico costomer)
- 10:31 ADVICS Manufacturing(Thailand)Co.,Ltd. 3.00 hours (Sales support #228 (Closed): MOC line manual create)
- 10:30 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #227 (Closed): Webseminar 2023/11/14)
- 10:29 A.N.I. LOGISTICS, LTD. 4.00 hours (Sales support #62 (Closed): CKD project phase3 Proposal activities + requirements definition)
14 Nov 2023
- 16:58 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
- Create the TO-DO list and modify the specification revision 2
- 16:54 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #176 (Closed): SATO label print via Bluetooth)
- Test and develop the print BT function
- 16:51 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
- Develop Export Outbound information File.
- 16:51 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
- Design drawing
- 13:28 Thai Nippon foods Co.,Ltd. 3.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
- Update list equipment of TNF project
- 13:26 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #225 (Closed): CCTV Installation)
- Contact supplier CCTV
- 13:13 Asian Stanley. International Limited 8.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
- Support to start using the system for Label printing system
- 10:10 Asian Stanley. International Limited 1.00 hour (Sales support #178 (Closed): Support to start using the system for Label printing system)
- 09:59 Asian Stanley. International Limited 8.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
- Support to start using the system for Label printing system
- 13:13 Asian Stanley. International Limited 8.00 hours (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
- Support installation HT-Label printing system Phase 2
- 10:05 Asian Stanley. International Limited 8.00 hours (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
- Starting to allow operators to try using it on the production line. Found a problem with the format of the rank card....
13 Nov 2023
- 17:30 ACME INDUSTRY CO.,LTD. 3.00 hours (Project progress work #176 (Closed): SATO label print via Bluetooth)
- Studying and test the example source code from SATO dev team
- 17:27 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
- Teaching about schedule operation for part control, press, kashime and QC
- 17:11 Thai Nippon foods Co.,Ltd. 1.00 hour (Sales support #175 (Closed): EV charger installation project)
- Update quotation and concept design about station charger
- 17:03 Thai Nippon foods Co.,Ltd. 2.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
- Follow up quote form supplier
- 17:00 Tomas Tech Co.,Ltd. 3.00 hours (Project progress work #223 (Closed): Internal check stock)
- Check stock equipment of project JTEKT,TNF,MAS
- 16:54 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
- config remote ebisu and clen database Master
- 16:54 Keyence (Thailand) Co., Ltd. 3.00 hours (Sales support #219 (Closed): Keyence meeting)
- Meeting with team keyence
- 16:53 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
- 16:50 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
- Develop Export Inbound information File.
- 16:50 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #10 (Closed): Creating a specification document)
- 16:49 YKK (Thailand) Co., Ltd. 4.00 hours (Sales support #222 (Closed): ConMas i-Reporter proposal for YKK)
- 16:47 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #142 (Closed): UAT about the WMS system and onsite support)
- 16:34 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
- Design drawing
- 08:44 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #44 (Closed): CKD & Meji Meeting IOT Monitoring system)
- Meeting
- 08:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Sales support #57 (Closed): Production IoT project requirements definition)
- meeting
- 08:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
- Develop web monitor
- 08:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Sales support #139 (Closed): Meeting Kick off IOT bekido and OA monitoring)
- Meeting
- 08:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Sales support #145 (Closed): Plant survey install IOT JTEKT )
- Survey plant
- 08:36 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #165 (Closed): IoT demo kit prepare box for Metarex at Nov)
- Develop
Also available in: Atom