From 09 Nov 2023 to 18 Nov 2023

18 Nov 2023

20:51 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #88 (Closed): NSET - Compo detail (Add new slip))
Anonymous
20:51 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
20:50 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
17:57 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
Add the unconfirm function to Inbound inquiry report (Revoke the confirm by QC) Kittisak Isarapongporn
17:56 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Spec confirmation with k.Ryo and meeting about the handy functions, will hold the meeting to update to K.So again on ... Kittisak Isarapongporn
17:22 Thai Nippon foods Co.,Ltd. 6.00 hours (Project progress work #243 (Closed): [ Task ] Program design and development )
Program design Nattapol Poeam
16:52 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Yutthapong Sricha
16:17 Tomas Tech Co.,Ltd. 4.00 hours (Sales support #24 (Closed): [FY2023]Common management for Ryo Nozaki)
Meeting with Asprova Ryo Nozaki
16:15 Asteer (Thailand) Co., Ltd. 8.00 hours (Project progress work #109 (Closed): [On-site support]Support after cutover)
On site support -Install Software -Test Software -Modify Software Kamol Anekchatnuntakool
16:13 Asteer (Thailand) Co., Ltd. 6.00 hours (Project progress work #240 (Closed): [Installation&On-site support] Handy terminal for Pokayoke system)
Install complete and we must modification of some comment Ryo Nozaki
16:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Sales support #239 (Closed): Handy terminal system re-placement for keyence handy terminal)
Meeting with Japanese person of Mazda and Keyence Ryo Nozaki
16:07 NIKKO NILKHOSOL CO., LTD. 4.00 hours (Sales support #238 (Closed): Proposal for Production management sysytem)
Ryo Nozaki
16:06 Thai Honda Manufacturing Co., Ltd 4.00 hours (Sales support #237 (Closed): Make proposal for IoT system)
Ryo Nozaki
16:04 FTS AUTOMOTIVE (THAILAND) CO.,LTD 4.00 hours (Sales support #231 (Closed): Replace procejet from D100 to KV8000 and XD02)
Ryo Nozaki
16:04 YAMADA SOMBOON CO., LTD 2.00 hours (Sales support #235 (Closed): Demo-kit for YAMADA SOMBOON)
Make concept demo-kit Nattapol Poeam
16:03 NHK SPRING(THAILAND) CO.,LTD. 4.00 hours (Project progress work #236 (Closed): ConMas i-Reporter proposal for NHK SPRING(THAILAND) CO.,LTD. )
Ryo Nozaki
15:20 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
Test Data linkage function. Kamol Anekchatnuntakool

17 Nov 2023

19:08 Asian Stanley. International Limited 1.00 hour (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
Soraya Norasing
19:06 Asian Stanley. International Limited 8.00 hours (Project progress work #224 (Closed): Modify handy application for support rank card of PLCC line.)
Soraya Norasing
16:59 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #223 (Closed): Internal check stock)
Internal check stock Nattapol Poeam
16:58 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #233 (Closed): Edit the data transmission concept of the Demo-Box line notify alert job.)
Revised concept about format PLC send to PLC and Data memory Nattapol Poeam
16:56 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
Prorgam design Nattapol Poeam
16:55 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
Suchin Viyasing
16:40 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #52 (Closed): Issue topics)
Fix the store procedure to support to create the schedule with minimum outbound qty Kittisak Isarapongporn
16:38 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #52 (Closed): Issue topics)
Show outsource information in schedule / check and fix the schedule generate related with outsource BOM Kittisak Isarapongporn
16:37 Ebisu Foods Co Ltd. 5.00 hours (Project progress work #16 (Closed): WMS Web Development )
create schema database import return request API form SAP , create store convert to ProductionSchedule Yutthapong Sricha
16:34 Asian Stanley. International Limited 3.00 hours (Problem-Bug #234 (Closed): show datetime SERVER on device resberry pi )
Modify screen 1,2,3 Yutthapong Sricha
11:36 NTPT Company Limited. 8.00 hours (Project progress work #49 (Closed): ConMas i-Reporter tablet quote 43sets)
Setup Applications of ConMas i-Reporter tablet quote 43sets Arunwit Isarapongporn
11:34 NTPT Company Limited. 8.00 hours (Project progress work #49 (Closed): ConMas i-Reporter tablet quote 43sets)
Setup Applications of ConMas i-Reporter tablet quote 43sets Arunwit Isarapongporn
11:33 NTPT Company Limited. 8.00 hours (Project progress work #49 (Closed): ConMas i-Reporter tablet quote 43sets)
Setup Applications of ConMas i-Reporter tablet quote 43sets Arunwit Isarapongporn

16 Nov 2023

23:10 ADVICS Manufacturing(Thailand)Co.,Ltd. 2.00 hours (Sales support #164 (Closed): IoT system for CNC line follow up)
Estimate cost of loss analysis cnc line project Nattapol Poeam
21:52 Asian Stanley. International Limited 8.00 hours (Project progress work #224 (Closed): Modify handy application for support rank card of PLCC line.)
Soraya Norasing
17:00 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
Suchin Viyasing
16:56 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
Develop Data linkage function. Kamol Anekchatnuntakool
16:53 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Change Label / Modify store API Sales Order convert to ProductionSchedule / Yutthapong Sricha
16:52 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #51 (Closed): Overall project development for web and handy)
Create OUTSOURCE information to remark / Cancel the confirmation by QC staff Kittisak Isarapongporn
16:24 Tomas Tech Co.,Ltd. 3.00 hours (Project progress work #233 (Closed): Edit the data transmission concept of the Demo-Box line notify alert job.)
Support K.Santi and K.Kamol test Demo-Kit Nattapol Poeam
11:57 Tomas Tech Co.,Ltd. 2.00 hours (Project progress work #233 (Closed): Edit the data transmission concept of the Demo-Box line notify alert job.)
Meeting about change new concept send and receive data between PC <> PLC Nattapol Poeam
16:00 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 1.00 hour (Project progress work #230 (Closed): MC30OP80 program modification and create document for k.Boonyarit)
Make proposal addition program record data to CF-Card lineMC30 OP80 IEMT Nattapol Poeam
14:12 Asteer (Thailand) Co., Ltd. 4.00 hours (Project progress work #110 (Closed): [On-site support]Support after cutover)
Santi Srichankaew
14:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Santi Srichankaew
13:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH)
Santi Srichankaew
13:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Sales support #139 (Closed): Meeting Kick off IOT bekido and OA monitoring)
Santi Srichankaew

15 Nov 2023

22:45 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.)
Soraya Norasing
22:41 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.)
develop insert function and responce Soraya Norasing
17:35 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #52 (Closed): Issue topics)
Test and fix bug Kittisak Isarapongporn
17:07 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
Suchin Viyasing
16:56 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Internal meeting about make schedule and Explain the details of the work and the entire work scope of this work. Nattapol Poeam
16:50 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
16:49 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
Develop Export Inventory information File. Kamol Anekchatnuntakool
16:29 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #176 (Closed): SATO label print via Bluetooth)
Kittisak Isarapongporn
15:51 ADVICS Manufacturing(Thailand)Co.,Ltd. 6.00 hours (Sales support #217 (Closed): Meeting about Loss analysis system IoT project ( New Project ))
Meeting and site survey about monitoring system Nattapol Poeam
15:29 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 4.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
Explore additional work sites about testing reading Supplier barcodes and collecting additional information about cus... Nattapol Poeam
15:19 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Kittisak Isarapongporn
15:19 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Meeting at online Kittisak Isarapongporn
14:59 Isuzu Engine Manufacturing Co.,(Thailand) Ltd. 5.00 hours (Project progress work #218 (Closed): Wiring lan cable and power cable of LineMC30 OP80)
Install complete Nattapol Poeam
14:12 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
SO SAP , strore proceder sql import sales order / change Label formatter Yutthapong Sricha
14:10 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Install WMS Pegasus ON server Ebisu , config DBConfig.php , global_env.php, Memcached_pool.php Yutthapong Sricha
13:17 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #31 (Closed): [FY2023]Common management for Santi)
PC deverlop Santi Srichankaew
13:14 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #165 (Closed): IoT demo kit prepare box for Metarex at Nov)
IoT demo kit prepare box for Metarex at Nov Santi Srichankaew
13:13 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #165 (Closed): IoT demo kit prepare box for Metarex at Nov)
IoT demo kit prepare box for Metarex at Nov Santi Srichankaew
10:33 JYOHO SYSTEMS S.A. DE C.V. 2.00 hours (Sales support #229 (Closed): Sales pegasus package and contact for mexico costomer)
Ryo Nozaki
10:31 ADVICS Manufacturing(Thailand)Co.,Ltd. 3.00 hours (Sales support #228 (Closed): MOC line manual create)
Ryo Nozaki
10:30 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #227 (Closed): Webseminar 2023/11/14)
Ryo Nozaki
10:29 A.N.I. LOGISTICS, LTD. 4.00 hours (Sales support #62 (Closed): CKD project phase3 Proposal activities + requirements definition)
Ryo Nozaki

14 Nov 2023

16:58 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #226 (Closed): CKD project requirement and document preparation)
Create the TO-DO list and modify the specification revision 2 Kittisak Isarapongporn
16:54 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #176 (Closed): SATO label print via Bluetooth)
Test and develop the print BT function Kittisak Isarapongporn
16:51 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
Develop Export Outbound information File. Kamol Anekchatnuntakool
16:51 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
Design drawing Suchin Viyasing
13:28 Thai Nippon foods Co.,Ltd. 3.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
Update list equipment of TNF project Nattapol Poeam
13:26 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #225 (Closed): CCTV Installation)
Contact supplier CCTV Nattapol Poeam
13:13 Asian Stanley. International Limited 8.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
Support to start using the system for Label printing system Arunwit Isarapongporn
10:10 Asian Stanley. International Limited 1.00 hour (Sales support #178 (Closed): Support to start using the system for Label printing system)
Soraya Norasing
09:59 Asian Stanley. International Limited 8.00 hours (Sales support #178 (Closed): Support to start using the system for Label printing system)
Support to start using the system for Label printing system Soraya Norasing
13:13 Asian Stanley. International Limited 8.00 hours (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
Support installation HT-Label printing system Phase 2 Arunwit Isarapongporn
10:05 Asian Stanley. International Limited 8.00 hours (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
Starting to allow operators to try using it on the production line. Found a problem with the format of the rank card.... Soraya Norasing

13 Nov 2023

17:30 ACME INDUSTRY CO.,LTD. 3.00 hours (Project progress work #176 (Closed): SATO label print via Bluetooth)
Studying and test the example source code from SATO dev team Kittisak Isarapongporn
17:27 ACME INDUSTRY CO.,LTD. 5.00 hours (Project progress work #204 (Closed): UAT about the WMS system and onsite support)
Teaching about schedule operation for part control, press, kashime and QC Kittisak Isarapongporn
17:11 Thai Nippon foods Co.,Ltd. 1.00 hour (Sales support #175 (Closed): EV charger installation project)
Update quotation and concept design about station charger Nattapol Poeam
17:03 Thai Nippon foods Co.,Ltd. 2.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
Follow up quote form supplier Nattapol Poeam
17:00 Tomas Tech Co.,Ltd. 3.00 hours (Project progress work #223 (Closed): Internal check stock)
Check stock equipment of project JTEKT,TNF,MAS Nattapol Poeam
16:54 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
config remote ebisu and clen database Master Yutthapong Sricha
16:54 Keyence (Thailand) Co., Ltd. 3.00 hours (Sales support #219 (Closed): Keyence meeting)
Meeting with team keyence Nattapol Poeam
16:53 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
16:50 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
Develop Export Inbound information File. Kamol Anekchatnuntakool
16:50 Minebea AccessSolutions Thai Ltd 4.00 hours (Project progress work #10 (Closed): Creating a specification document)
Ryo Nozaki
16:49 YKK (Thailand) Co., Ltd. 4.00 hours (Sales support #222 (Closed): ConMas i-Reporter proposal for YKK)
Ryo Nozaki
16:47 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #142 (Closed): UAT about the WMS system and onsite support)
Ryo Nozaki
16:34 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
Design drawing Suchin Viyasing
08:44 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #44 (Closed): CKD & Meji Meeting IOT Monitoring system)
Meeting Santi Srichankaew
08:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Sales support #57 (Closed): Production IoT project requirements definition)
meeting Santi Srichankaew
08:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen )
Develop web monitor Santi Srichankaew
08:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Sales support #139 (Closed): Meeting Kick off IOT bekido and OA monitoring)
Meeting Santi Srichankaew
08:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Sales support #145 (Closed): Plant survey install IOT JTEKT )
Survey plant Santi Srichankaew
08:36 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #165 (Closed): IoT demo kit prepare box for Metarex at Nov)
Develop Santi Srichankaew

12 Nov 2023

15:08 Asian Stanley. International Limited 8.00 hours (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
-Set up and test the printers completed. -User training Soraya Norasing

10 Nov 2023

16:56 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
16:49 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
16:53 A.N.I. LOGISTICS, LTD. 4.00 hours (Problem-Bug #221 (Closed): Found the problem with the handy show "Schedule not found")
Finding the problem causes Kittisak Isarapongporn
16:52 Thai Nippon foods Co.,Ltd. 5.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
Summarize equipment before order Nattapol Poeam
16:49 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Test API ItemMaster , Supplier , Customer , recheck convert qty unit Yutthapong Sricha
16:49 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #88 (Closed): NSET - Compo detail (Add new slip))
Anonymous
16:49 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
16:46 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
Develop Import Delivery instruction information File. Kamol Anekchatnuntakool
16:13 Thai Nippon foods Co.,Ltd. 8.00 hours (Project progress work #220 (Closed): Design drawing and confirm equipment)
Design drawing & Check price equipment from supplier. Suchin Viyasing
15:30 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 3.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
Meeting about review concept design with Panasonic team and Keyence team Nattapol Poeam
15:04 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd 1.00 hour (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Update estimate cost MACO Nattapol Poeam
08:15 Tomas Tech Co.,Ltd. 8.00 hours (Sales support #43 (Closed): Install SR-X300S at Pandora)
File support Santi Srichankaew

09 Nov 2023

21:45 Asian Stanley. International Limited 8.00 hours (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
Install Server and config application&DB on Server, Config printer IP address&Setting printer name Arunwit Isarapongporn
21:45 Asian Stanley. International Limited 8.00 hours (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
Install Server and config application&DB on Server, Config printer IP address&Setting printer name Arunwit Isarapongporn
21:13 Asian Stanley. International Limited 8.00 hours (Project progress work #197 (Closed): Support installation HT-Label printing system Phase 2)
Soraya Norasing
19:10 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd 4.00 hours (Project progress work #213 (Closed): Proposal IoT system for Maco production line)
Ryo Nozaki
19:04 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd 0.00 hour (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Make summarize price of equipment for MACO monitor robot in production line IoT project Nattapol Poeam
19:03 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd 0.00 hour (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Make summarize price of equipment for MACO monitor robot in production line IoT project Nattapol Poeam
16:58 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd 2.00 hours (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Estimate cost and summarize equipment next action follow up price Keyence Nattapol Poeam
08:40 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd 4.00 hours (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Meeting about the concept of machine operation monitoring systems Nattapol Poeam
08:39 Mitsubishi Heavy Industries-Mahajak Air Conditioners Co., Ltd 4.00 hours (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Meeting about the concept of machine operation monitoring systems Nattapol Poeam
18:43 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #191 (Closed): Test Program )
Leaning function PLC Mistubishi Suchin Viyasing
17:51 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Yutthapong Sricha
17:50 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #16 (Closed): WMS Web Development )
Yutthapong Sricha
17:15 ACME INDUSTRY CO.,LTD. 4.00 hours (Project progress work #163 (Closed): Import BOM/Modify script to manage uncontrol items and outsource details)
Import BOM Kittisak Isarapongporn
17:10 A.N.I. LOGISTICS, LTD. 4.00 hours (Problem-Bug #214 (Closed): Found the problem with the handy being able to scan the other label [STAGING AREA])
Adjust the code and testing Kittisak Isarapongporn
17:07 Ebisu Foods Co Ltd. 8.00 hours (Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.)
Anonymous
17:07 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy)
Anonymous
17:07 Nidec Techno Motor (Thailand) Co.,Ltd. 8.00 hours (Project progress work #88 (Closed): NSET - Compo detail (Add new slip))
Anonymous
17:06 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #203 (Closed): Test Program & Make document)
Design drawing Suchin Viyasing
17:00 Thai Nippon foods Co.,Ltd. 5.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
Summarize equipment before order Nattapol Poeam
16:46 Minebea AccessSolutions Thai Ltd 8.00 hours (Project progress work #105 (Closed): [Coding]Data linkage function)
Develop Import Purchase order information File. Kamol Anekchatnuntakool
11:01 Nissan Motor (Thailand) Co., Ltd. 0.00 hour (Sales support #216 (Closed): NMT1&2,Trim Chassis shop To install OCR system project)
Specification OCR system installation project Plant1&2 Nattapol Poeam
10:57 Nissan Motor (Thailand) Co., Ltd. 1.00 hour (Sales support #216 (Closed): NMT1&2,Trim Chassis shop To install OCR system project)
Meeting about concept NMT1&2,Trim Chassis shop To install OCR system project Nattapol Poeam
09:36 ATA Casting Technology Co., Ltd. 4.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
On-site service to check and fix problems Nattapol Poeam
08:22 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #193 (Closed): Test Program )
Leaning function PLC Mistubishi Suchin Viyasing
08:21 Tomas Tech Co.,Ltd. 8.00 hours (Project progress work #194 (Closed): Test Program & Outside)
Leaning function PLC Mistubishi & Outside Suchin Viyasing
 