Activity
From 23 Oct 2023 to 01 Nov 2023
01 Nov 2023
- 17:38 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #55: handy terminal BT-A500 coding with Java Android.
- [Today]
-developmet fuction check user, insert data
[4/11/23]
-developmet fuction check plan manpower
*At presen... - 17:28 ACME INDUSTRY CO.,LTD. Project progress work #52 (In Progress): Issue topics
- 17:27 ACME INDUSTRY CO.,LTD. Project progress work #51 (In Progress): Overall project development for web and handy
- 17:21 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: Development fix scan qr-code funtion Inbound and Test Inbound
Tomorrow: Development 2 languages and Check tha... - 16:33 Ebisu Foods Co Ltd. Project progress work #16: WMS Web Development
- Tag Label Manage
- Tag generator
- Tag label list - 16:30 Ebisu Foods Co Ltd. Project progress work #16: WMS Web Development
- Change schema database LabelStatus
add lbl_inbound_date , lbl_expiry_date
Change trigger insertAfter_LabelStat... - 16:20 Ebisu Foods Co Ltd. Project progress work #16: WMS Web Development
- Modify sql
trigger insertAfter_Inbound
Store procedure sp_update_stock
test by manual insert inbound
Modify... - 16:08 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #172 (Confirmation request): change item Package Type Not calurate stock card record
- 16:08 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #172 (Closed): change item Package Type Not calurate stock card record
- คุณโอ๋ มีการเปลี่ยน จำนวน ต่อ package ของ item สินค้า 6 รายการ
Stock Card ไม่มีการคำนวน จำนวน package ใหม่ในระบบ ว... - 15:49 Tomas Tech Co.,Ltd. Sales support #171 (In Progress): Ishida meeting and weight system IoT concept
- 15:48 Tomas Tech Co.,Ltd. Sales support #171 (Closed): Ishida meeting and weight system IoT concept
- 15:40 Minebea AccessSolutions Thai Ltd Project progress work #96 (In Progress): [Internal Design] DB and various functions, man-hour calculation
- 15:13 ACME INDUSTRY CO.,LTD. Project progress work #170 (Close request): Add the item picture preview
- 15:12 ACME INDUSTRY CO.,LTD. Project progress work #170: Add the item picture preview
- - Add javascript functions thumbnail_click(evt,e) and thumbnail_preview(e) on viewer page (item_master.php).
- Inse... - 10:39 ACME INDUSTRY CO.,LTD. Project progress work #170 (Closed): Add the item picture preview
- Show item picture display dialog when clicking on the thumbnail.
- 08:13 Tomas Tech Co.,Ltd. Project progress work #169 (Closed): Pandora Setup Demo SR Scanner.
- Pandora Setup Demo SR Scanner.
- 08:10 Tomas Tech Co.,Ltd. Project progress work #168 (Closed): Modify REDMINE Line Notify system.
- Modify REDMINE Line Notify system.
31 Oct 2023
- 23:12 Tomas Tech Co.,Ltd. Project progress work #166: IoT monitoring at web screen development PHP
- Developed using PHP based on the web screen that can be viewed on the KV-XD02. The DB structure shall be in the same ...
- 23:10 Tomas Tech Co.,Ltd. Project progress work #166 (In Progress): IoT monitoring at web screen development PHP
- Meeting K.Nackki
overview process to Me - 23:12 Tomas Tech Co.,Ltd. Project progress work #167 (New): IoT monitoring at web screen development follow and design DB
- Developed using PHP based on the web screen that can be viewed on the KV-XD02. The DB structure shall be in the same ...
- 22:22 Tomas Tech Co.,Ltd. Project progress work #165 (Closed): IoT demo kit prepare box for Metarex at Nov
- 22:08 ADVICS Manufacturing(Thailand)Co.,Ltd. Sales support #164 (Closed): IoT system for CNC line follow up
- 20:27 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #55: handy terminal BT-A500 coding with Java Android.
- -developmentp call API fuction query data when scan user.
- 19:14 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: Development edit Inbound & Outbound
Tomorrow: Development Inbound and Test Outbound - 18:16 ACME INDUSTRY CO.,LTD. Project progress work #163 (Closed): Import BOM/Modify script to manage uncontrol items and outsource details
- Import BOM/Modify script to manage uncontrol items and outsource details
- 18:10 ACME INDUSTRY CO.,LTD. Project progress work #162 (Close request): Found BT connection failed to Sato WS4 label printer
- Create the example Android project for Bluetooth Sato WS4 Desktop label printer.
Sent the example source code and lo... - 18:04 ACME INDUSTRY CO.,LTD. Project progress work #162 (Closed): Found BT connection failed to Sato WS4 label printer
- Found BT connection failed to Sato WS4 label printer
Integrate the SATO SDK v1.0.0 to WMS android application of ACM... - 17:49 A.N.I. LOGISTICS, LTD. Problem-Bug #161: Found duplicated scan & part name cannot be displayed in reports
- All issues fixed.
- 17:48 A.N.I. LOGISTICS, LTD. Problem-Bug #161 (Close request): Found duplicated scan & part name cannot be displayed in reports
- 17:47 A.N.I. LOGISTICS, LTD. Problem-Bug #161 (Closed): Found duplicated scan & part name cannot be displayed in reports
- Support issues on 2023-10-31
- Duplicated scan
Cause: use multiple handhelds scan the label
Solution: remove the l... - 17:30 Asian Stanley. International Limited Project progress work #158 (Close request): HT-Label printing system [modify to support the multiple machine]
- 17:30 Tomas Tech Co.,Ltd. Project progress work #155 (Close request): Redmine Line Notify Software.
- 16:53 Tomas Tech Co.,Ltd. Project progress work #155 (Confirmation request): Redmine Line Notify Software.
- Develop Redmine Line Notify Software.
- 17:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #120 (In Progress): [Coding&UT] KV8000 Touch display and XD02 monitor screen
- -Deverlop PLC bekido function
-Deverlop HMI data monitor
-Deverlop template XD02 web monitor
30 Oct 2023
- 23:41 Asian Stanley. International Limited Project progress work #158 (Confirmation request): HT-Label printing system [modify to support the multiple machine]
- -modify the HT-Label printing system to support the multiple machine has been completed.
-fixed edittext of old_lot_... - 23:33 Asian Stanley. International Limited Project progress work #158 (In Progress): HT-Label printing system [modify to support the multiple machine]
- 19:24 Siam Denso Manufacturing Co.,Ltd. Project progress work #160 (Closed): Add line control for ANDS
- 19:23 NTPT Company Limited. Project progress work #159 (Closed): ConMas i-Reporter teaching for NTPT staff
- 16:43 Tomas Tech Co.,Ltd. Project progress work #155: Redmine Line Notify Software.
- Develop Redmine Line Notify Software.
- 05:47 ATA Casting Technology Co., Ltd. Project progress work #91 (In Progress): Modify Pegasus.
- please close sub task first
- 05:45 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (In Progress): HTA_NSET completion fix bug.
- please add source code file
- 05:44 ATA Casting Technology Co., Ltd. Project progress work #148 (Closed): Modify the store procedure to support the extended length of pallet
- 05:43 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (In Progress): Inbound Inquiry Report problem
- add source code
- 05:42 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #153 (Closed): HTA_NSET completion fix bug.
- 05:42 Asian Stanley. International Limited Project progress work #42 (In Progress): HT-Label printing system
- add sauce code
29 Oct 2023
- 11:34 Settings associated with automatic email delivery
- Settings associated with automatic email delivery
Recommended setting: Automatic mail sorting
Outlook has an auto... - 11:14 Minebea AccessSolutions Thai Ltd Project progress work #96: [Internal Design] DB and various functions, man-hour calculation
- k.nack please start design DB and various functions, man-hour calculation
28 Oct 2023
- 13:38 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #153 (Close request): HTA_NSET completion fix bug.
- 13:38 Asian Stanley. International Limited Project progress work #42 (Close request): HT-Label printing system
27 Oct 2023
- 17:56 Asian Stanley. International Limited Project progress work #158 (Closed): HT-Label printing system [modify to support the multiple machine]
- -Handy modify to support the multiple machine
- 17:54 Asian Stanley. International Limited Project progress work #42 (Confirmation request): HT-Label printing system
- 17:53 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #153 (Confirmation request): HTA_NSET completion fix bug.
- “Problem”
1.)[Completion] : The qty is enough but cannot be printed.
2.)[Component Detail] : Handy alert "Server co... - 17:39 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (Close request): Inbound Inquiry Report problem
- 10:08 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (Confirmation request): Inbound Inquiry Report problem
- 10:07 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (Closed): Inbound Inquiry Report problem
- list Inbound showing incomplete information
I am checking found problem user login on handy
but not found user on... - 17:39 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (Close request): HTA_NSET completion fix bug.
- 16:42 ATA Casting Technology Co., Ltd. Project progress work #149: Request to test the modified with new packing app
- Request Modify Pallet Status change link tblPalletStatus Table to tblPackingData Table Pegasus System krub.
- 16:13 Tomas Tech Co.,Ltd. Project progress work #155 (In Progress): Redmine Line Notify Software.
- Develop Redmine Line Notify Software.
- 08:03 Tomas Tech Co.,Ltd. Project progress work #155 (Closed): Redmine Line Notify Software.
- Develop Redmine Line Notify Software.
- 15:38 Nissan Motor (Thailand) Co., Ltd. Sales support #157 (Closed): Plant surgery install Trim and Chassis
- -check layout installation line Trim 1,2
-check layout installation line chassis 1,2
-check layout installation lin... - 10:08 Asian Stanley. International Limited Sales support #36: UPS can not use in some position at LINE model H9J
- [27/10/2023]
Maker BCN
- Sent 2 UPS machines that submitted a claim back to ASI. - 09:52 Asian Stanley. International Limited Project progress work #8: Support installation for power supply and LAN cable for 50 points
- Add document Infrastructure settings list_R1.xlsx
- 09:50 Tomas Tech Co.,Ltd. Sales support #46 (In Progress): Safety training adjustment
- Safety training adjustment
Isuzu Engine Manufacturing Co.,(Thailand)LTD
- The latest update has sent a list of ad...
26 Oct 2023
- 18:53 Siam Denso Manufacturing Co.,Ltd. Problem-Bug #78 (Closed): Found problem about the alarm of sequnce
- 18:52 A.N.I. LOGISTICS, LTD. Problem-Bug #147 (Closed): Found the problem schedule not found on receive area of pc 37356X931008
- 18:51 Tomas Tech Co.,Ltd. Project progress work #144 (Closed): PLC alarm record and send to wdt-clients2.
- 17:16 Tomas Tech Co.,Ltd. Project progress work #144 (Close request): PLC alarm record and send to wdt-clients2.
- 16:06 Tomas Tech Co.,Ltd. Project progress work #144 (Confirmation request): PLC alarm record and send to wdt-clients2.
- Develop and test PLC alarm record send to wdt-clients2.
- 18:51 ATA Casting Technology Co., Ltd. Project progress work #149 (In Progress): Request to test the modified with new packing app
- please add source code and change progress 100%
- 17:16 ATA Casting Technology Co., Ltd. Project progress work #149 (Close request): Request to test the modified with new packing app
- 10:30 ATA Casting Technology Co., Ltd. Project progress work #149 (Confirmation request): Request to test the modified with new packing app
- Test Packing app insert to tblPackingData table OK krub. but packing app is not use tblPalletStatus table krub.
- 18:50 Asian Stanley. International Limited Problem-Bug #152 (Closed): Found the incorrect barcode generated
- 17:15 Asian Stanley. International Limited Problem-Bug #152 (Close request): Found the incorrect barcode generated
- The Code39 barcode library has been replaced with FreeSpire.
- 15:13 Asian Stanley. International Limited Problem-Bug #152 (Closed): Found the incorrect barcode generated
- Problem/Issue:
Found an error of incorrect barcode generated in label print software.
Causes:
It would have oc... - 18:48 Asian Stanley. International Limited Project progress work #42 (In Progress): HT-Label printing system
- please add source code
- 17:16 Asian Stanley. International Limited Project progress work #42 (Close request): HT-Label printing system
- 13:37 Asian Stanley. International Limited Project progress work #42 (Confirmation request): HT-Label printing system
- 18:47 Asian Stanley. International Limited Project progress work #59 (Closed): Support installation HT-Label printing system
- 17:16 Asian Stanley. International Limited Project progress work #59 (Close request): Support installation HT-Label printing system
- 13:36 Asian Stanley. International Limited Project progress work #59 (Confirmation request): Support installation HT-Label printing system
- 25/10/2023
- test application
- User training - 18:45 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #154 (Closed): Warehouse automation system introduce
- 18:45 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #154 (Closed): Warehouse automation system introduce
- 17:57 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (Confirmation request): HTA_NSET completion fix bug.
- 17:57 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #153: HTA_NSET completion fix bug.
- Still checking for program errors.
- 17:54 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #153 (Closed): HTA_NSET completion fix bug.
- List of bugs as reported by the customer in the attached file.
- 17:50 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #55: handy terminal BT-A500 coding with Java Android.
- create api file for connect database
- 15:06 A.N.I. LOGISTICS, LTD. Problem-Bug #151 (Interruption): Changed request: HATC's date format will be changed on this November
- Problem/Issues:
K.Khwanchai informs the HATC's date format will be changed to '01-Nov-23' on November.
He will sen... - 10:51 ATA Casting Technology Co., Ltd. Project progress work #150 (Interruption): Request Modify Pallet Status change link tblPalletStatus Table to tblPackingData Table Pegasus System krub.
- Because customer check tblPackingData Table Data with Pallet Status of Pegasus System krub.
25 Oct 2023
- 20:00 Siam Denso Manufacturing Co.,Ltd. Problem-Bug #78 (Close request): Found problem about the alarm of sequnce
- 12:24 Siam Denso Manufacturing Co.,Ltd. Problem-Bug #78 (Confirmation request): Found problem about the alarm of sequnce
- [21/10/23]
Solved the problem of Alarm of sequence for all 8 lines. - 19:59 ATA Casting Technology Co., Ltd. Project progress work #91 (Close request): Modify Pegasus.
- 19:59 ATA Casting Technology Co., Ltd. Project progress work #148 (Close request): Modify the store procedure to support the extended length of pallet
- 19:54 ATA Casting Technology Co., Ltd. Project progress work #148 (Closed): Modify the store procedure to support the extended length of pallet
- Modify the store procedure and change the table schema to support the extended 14-character length of the pallet.
Li... - 19:58 ATA Casting Technology Co., Ltd. Project progress work #149 (Closed): Request to test the modified with new packing app
- Request to test the modification with the new packing app to support the new extended 14-character length of the pall...
- 19:40 A.N.I. LOGISTICS, LTD. Problem-Bug #147 (Close request): Found the problem schedule not found on receive area of pc 37356X931008
- 19:39 A.N.I. LOGISTICS, LTD. Problem-Bug #147 (Closed): Found the problem schedule not found on receive area of pc 37356X931008
- Problem:
Schedule not found on receive area of pc 37356X931008
Causes:
There are some incorrect data in the mast... - 18:46 A.N.I. LOGISTICS, LTD. Problem-Bug #146 (Closed): Enhance the Store procedure to generate Production outer schedule
- 14:03 A.N.I. LOGISTICS, LTD. Problem-Bug #146 (Close request): Enhance the Store procedure to generate Production outer schedule
- 14:02 A.N.I. LOGISTICS, LTD. Problem-Bug #146 (Closed): Enhance the Store procedure to generate Production outer schedule
- Problem: Found the problem that the import function will reject all data when the duplicate occurs.
Solutions: Add... - 18:46 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (Closed): Install function Cancel inbound and outbound
- 18:46 A.N.I. LOGISTICS, LTD. Problem-Bug #135 (Closed): The power went off
- 18:46 Shodensha (Thailand) Co., Ltd. Problem-Bug #60 (Closed): Procedure manual application development modifictaion problem
- 18:46 ATA Casting Technology Co., Ltd. Problem-Bug #56 (Closed): Packing system no need scan pallet no
- 18:46 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #50 (Closed): Add delete function
- 18:46 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #47 (Closed): create spectification document
- 18:46 Tomas Tech Co.,Ltd. Project progress work #35 (Closed): PLC alarm record and send to line notify
- 18:46 Asteer (Thailand) Co., Ltd. Project progress work #21 (Closed): Handy terminal application system Development.
- 18:45 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (In Progress): HTA_NSET completion fix bug.
- please add soruce code file
- 16:55 Tomas Tech Co.,Ltd. Project progress work #144 (In Progress): PLC alarm record and send to wdt-clients2.
- Develop and test PLC alarm record send to wdt-clients2.
- 11:30 Tomas Tech Co.,Ltd. Project progress work #144 (Closed): PLC alarm record and send to wdt-clients2.
- Develop and test PLC alarm record and send to wdt-clients2.
- 16:43 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: Development edit Inbound & Outbound for API
Tomorrow: Development edit unit & qty to insert table Inbound & O... - 13:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #145 (Closed): Plant survey install IOT JTEKT
- Layout location install PLC
Layout location install HMI
Layout location install Bekido monitor
Layout location wir... - 12:18 Asian Stanley. International Limited Project progress work #95 (In Progress): Support installation for power supply and LAN cable for 20 points
- [25/10/23]
-Survey the area where the printer, electrical cabinet, LAN cabinet, and wire rails are installed above t... - 12:18 Tomas Tech Co.,Ltd. Sales support #45 (Closed): PTL DEMO kit concept for murata
- 12:11 Asian Stanley. International Limited Project progress work #8: Support installation for power supply and LAN cable for 50 points
- [24/10/23]
-Setup IP address and setting application for all remaining Handy terminal devices.
-The setup printer n...
24 Oct 2023
- 21:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #143 (Closed): Production IoT project requirements and support project
- 21:39 ACME INDUSTRY CO.,LTD. Project progress work #142 (Closed): UAT about the WMS system and onsite support
- 19:45 Asian Stanley. International Limited Project progress work #59: Support installation HT-Label printing system
- Today
-Set IP addresses and setting application for all remaining Handy devices.
-Set printer name.
-set preset on... - 18:59 Asteer (Thailand) Co., Ltd. Project progress work #21 (Close request): Handy terminal application system Development.
- 16:06 Asteer (Thailand) Co., Ltd. Project progress work #21 (Confirmation request): Handy terminal application system Development.
- Develop HT Software Finish krub.
- 18:59 Shodensha (Thailand) Co., Ltd. Problem-Bug #60 (Close request): Procedure manual application development modifictaion problem
- 18:59 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (Close request): Install function Cancel inbound and outbound
- 16:44 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (Confirmation request): Install function Cancel inbound and outbound
- Installation Web Pegasus completed.
- 07:46 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (In Progress): Install function Cancel inbound and outbound
- 18:59 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (Close request): HTA_NSET completion fix bug.
- 16:45 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
- Today: Development edit Stock Adjusment
Tomorrow: Development edit Inbound & Outbound for API - 08:00 Asian Stanley. International Limited Problem-Bug #73: Found 500 return error
- To day will montitor web on TV screen by Anydesk.
- 07:56 Ebisu Foods Co Ltd. Project progress work #16: WMS Web Development
- Today 24-Oct-2023
1. checking test and Triggers Inbound (insertAfter_Inbound/updateModifired_Inbound)
2. Waitting S...