11:34 Settings associated with automatic email delivery
Settings associated with automatic email delivery
Recommended setting: Automatic mail sorting
Outlook has an auto...
Ryo Nozaki
11:14 Minebea AccessSolutions Thai Ltd Project progress work #96: [Internal Design] DB and various functions, man-hour calculation
k.nack please start design DB and various functions, man-hour calculation Ryo Nozaki

28 Oct 2023

13:38 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #153 (Close request): HTA_NSET completion fix bug.
Kittisak Isarapongporn
13:38 Asian Stanley. International Limited Project progress work #42 (Close request): HT-Label printing system
Kittisak Isarapongporn

27 Oct 2023

17:56 Asian Stanley. International Limited Project progress work #158 (Closed): HT-Label printing system [modify to support the multiple machine]
-Handy modify to support the multiple machine
Soraya Norasing
17:54 Asian Stanley. International Limited Project progress work #42 (Confirmation request): HT-Label printing system
Soraya Norasing
17:53 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #153 (Confirmation request): HTA_NSET completion fix bug.
“Problem”
1.)[Completion] : The qty is enough but cannot be printed.
2.)[Component Detail] : Handy alert "Server co...
Soraya Norasing
17:39 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (Close request): Inbound Inquiry Report problem
Kittisak Isarapongporn
10:08 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (Confirmation request): Inbound Inquiry Report problem
Yutthapong Sricha
10:07 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #156 (Closed): Inbound Inquiry Report problem
list Inbound showing incomplete information
I am checking found problem user login on handy
but not found user on...
Yutthapong Sricha
17:39 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (Close request): HTA_NSET completion fix bug.
Kittisak Isarapongporn
16:42 ATA Casting Technology Co., Ltd. Project progress work #149: Request to test the modified with new packing app
Request Modify Pallet Status change link tblPalletStatus Table to tblPackingData Table Pegasus System krub. Kamol Anekchatnuntakool
16:13 Tomas Tech Co.,Ltd. Project progress work #155 (In Progress): Redmine Line Notify Software.
Develop Redmine Line Notify Software. Kamol Anekchatnuntakool
08:03 Tomas Tech Co.,Ltd. Project progress work #155 (Closed): Redmine Line Notify Software.
Develop Redmine Line Notify Software. Kamol Anekchatnuntakool
15:38 Nissan Motor (Thailand) Co., Ltd. Sales support #157 (Closed): Plant surgery install Trim and Chassis
-check layout installation line Trim 1,2
-check layout installation line chassis 1,2
-check layout installation lin...
Santi Srichankaew
10:08 Asian Stanley. International Limited Sales support #36: UPS can not use in some position at LINE model H9J
[27/10/2023]
Maker BCN
- Sent 2 UPS machines that submitted a claim back to ASI.
Arunwit Isarapongporn
09:52 Asian Stanley. International Limited Project progress work #8: Support installation for power supply and LAN cable for 50 points
Add document Infrastructure settings list_R1.xlsx Arunwit Isarapongporn
09:50 Tomas Tech Co.,Ltd. Sales support #46 (In Progress): Safety training adjustment
Safety training adjustment
Isuzu Engine Manufacturing Co.,(Thailand)LTD
- The latest update has sent a list of ad...
Arunwit Isarapongporn

26 Oct 2023

18:53 Siam Denso Manufacturing Co.,Ltd. Problem-Bug #78 (Closed): Found problem about the alarm of sequnce
Ryo Nozaki
18:52 A.N.I. LOGISTICS, LTD. Problem-Bug #147 (Closed): Found the problem schedule not found on receive area of pc 37356X931008
Ryo Nozaki
18:51 Tomas Tech Co.,Ltd. Project progress work #144 (Closed): PLC alarm record and send to wdt-clients2.
Ryo Nozaki
17:16 Tomas Tech Co.,Ltd. Project progress work #144 (Close request): PLC alarm record and send to wdt-clients2.
Kittisak Isarapongporn
16:06 Tomas Tech Co.,Ltd. Project progress work #144 (Confirmation request): PLC alarm record and send to wdt-clients2.
Develop and test PLC alarm record send to wdt-clients2. Redmine Admin
18:51 ATA Casting Technology Co., Ltd. Project progress work #149 (In Progress): Request to test the modified with new packing app
please add source code and change progress 100% Ryo Nozaki
17:16 ATA Casting Technology Co., Ltd. Project progress work #149 (Close request): Request to test the modified with new packing app
Kittisak Isarapongporn
10:30 ATA Casting Technology Co., Ltd. Project progress work #149 (Confirmation request): Request to test the modified with new packing app
Test Packing app insert to tblPackingData table OK krub. but packing app is not use tblPalletStatus table krub. Kamol Anekchatnuntakool
18:50 Asian Stanley. International Limited Problem-Bug #152 (Closed): Found the incorrect barcode generated
Ryo Nozaki
17:15 Asian Stanley. International Limited Problem-Bug #152 (Close request): Found the incorrect barcode generated
The Code39 barcode library has been replaced with FreeSpire. Kittisak Isarapongporn
15:13 Asian Stanley. International Limited Problem-Bug #152 (Closed): Found the incorrect barcode generated
Problem/Issue:
Found an error of incorrect barcode generated in label print software.
Causes:
It would have oc...
Kittisak Isarapongporn
18:48 Asian Stanley. International Limited Project progress work #42 (In Progress): HT-Label printing system
please add source code Ryo Nozaki
17:16 Asian Stanley. International Limited Project progress work #42 (Close request): HT-Label printing system
Kittisak Isarapongporn
13:37 Asian Stanley. International Limited Project progress work #42 (Confirmation request): HT-Label printing system
Soraya Norasing
18:47 Asian Stanley. International Limited Project progress work #59 (Closed): Support installation HT-Label printing system
Ryo Nozaki
17:16 Asian Stanley. International Limited Project progress work #59 (Close request): Support installation HT-Label printing system
Kittisak Isarapongporn
13:36 Asian Stanley. International Limited Project progress work #59 (Confirmation request): Support installation HT-Label printing system
25/10/2023
- test application
- User training
Soraya Norasing
18:45 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #154 (Closed): Warehouse automation system introduce
Ryo Nozaki
18:45 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #154 (Closed): Warehouse automation system introduce
Ryo Nozaki
17:57 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (Confirmation request): HTA_NSET completion fix bug.
Soraya Norasing
17:57 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #153: HTA_NSET completion fix bug.
Still checking for program errors. Soraya Norasing
17:54 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #153 (Closed): HTA_NSET completion fix bug.
List of bugs as reported by the customer in the attached file. Soraya Norasing
17:50 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #55: handy terminal BT-A500 coding with Java Android.
create api file for connect database Soraya Norasing
15:06 A.N.I. LOGISTICS, LTD. Problem-Bug #151 (Interruption): Changed request: HATC's date format will be changed on this November
Problem/Issues:
K.Khwanchai informs the HATC's date format will be changed to '01-Nov-23' on November.
He will sen...
Kittisak Isarapongporn
10:51 ATA Casting Technology Co., Ltd. Project progress work #150 (Interruption): Request Modify Pallet Status change link tblPalletStatus Table to tblPackingData Table Pegasus System krub.
Because customer check tblPackingData Table Data with Pallet Status of Pegasus System krub. Kamol Anekchatnuntakool

25 Oct 2023

20:00 Siam Denso Manufacturing Co.,Ltd. Problem-Bug #78 (Close request): Found problem about the alarm of sequnce
Kittisak Isarapongporn
12:24 Siam Denso Manufacturing Co.,Ltd. Problem-Bug #78 (Confirmation request): Found problem about the alarm of sequnce
[21/10/23]
Solved the problem of Alarm of sequence for all 8 lines.
Arunwit Isarapongporn
19:59 ATA Casting Technology Co., Ltd. Project progress work #91 (Close request): Modify Pegasus.
Kittisak Isarapongporn
19:59 ATA Casting Technology Co., Ltd. Project progress work #148 (Close request): Modify the store procedure to support the extended length of pallet
Kittisak Isarapongporn
19:54 ATA Casting Technology Co., Ltd. Project progress work #148 (Closed): Modify the store procedure to support the extended length of pallet
Modify the store procedure and change the table schema to support the extended 14-character length of the pallet.
Li...
Kittisak Isarapongporn
19:58 ATA Casting Technology Co., Ltd. Project progress work #149 (Closed): Request to test the modified with new packing app
Request to test the modification with the new packing app to support the new extended 14-character length of the pall... Kittisak Isarapongporn
19:40 A.N.I. LOGISTICS, LTD. Problem-Bug #147 (Close request): Found the problem schedule not found on receive area of pc 37356X931008
Kittisak Isarapongporn
19:39 A.N.I. LOGISTICS, LTD. Problem-Bug #147 (Closed): Found the problem schedule not found on receive area of pc 37356X931008
Problem:
Schedule not found on receive area of pc 37356X931008
Causes:
There are some incorrect data in the mast...
Kittisak Isarapongporn
18:46 A.N.I. LOGISTICS, LTD. Problem-Bug #146 (Closed): Enhance the Store procedure to generate Production outer schedule
Ryo Nozaki
14:03 A.N.I. LOGISTICS, LTD. Problem-Bug #146 (Close request): Enhance the Store procedure to generate Production outer schedule
Kittisak Isarapongporn
14:02 A.N.I. LOGISTICS, LTD. Problem-Bug #146 (Closed): Enhance the Store procedure to generate Production outer schedule
Problem: Found the problem that the import function will reject all data when the duplicate occurs.
Solutions: Add...
Kittisak Isarapongporn
18:46 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (Closed): Install function Cancel inbound and outbound
Ryo Nozaki
18:46 A.N.I. LOGISTICS, LTD. Problem-Bug #135 (Closed): The power went off
Ryo Nozaki
18:46 Shodensha (Thailand) Co., Ltd. Problem-Bug #60 (Closed): Procedure manual application development modifictaion problem
Ryo Nozaki
18:46 ATA Casting Technology Co., Ltd. Problem-Bug #56 (Closed): Packing system no need scan pallet no
Ryo Nozaki
18:46 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #50 (Closed): Add delete function
Ryo Nozaki
18:46 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #47 (Closed): create spectification document
Ryo Nozaki
18:46 Tomas Tech Co.,Ltd. Project progress work #35 (Closed): PLC alarm record and send to line notify
Ryo Nozaki
18:46 Asteer (Thailand) Co., Ltd. Project progress work #21 (Closed): Handy terminal application system Development.
Ryo Nozaki
18:45 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (In Progress): HTA_NSET completion fix bug.
please add soruce code file Ryo Nozaki
16:55 Tomas Tech Co.,Ltd. Project progress work #144 (In Progress): PLC alarm record and send to wdt-clients2.
Develop and test PLC alarm record send to wdt-clients2. Kamol Anekchatnuntakool
11:30 Tomas Tech Co.,Ltd. Project progress work #144 (Closed): PLC alarm record and send to wdt-clients2.
Develop and test PLC alarm record and send to wdt-clients2. Kamol Anekchatnuntakool
16:43 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
Today: Development edit Inbound & Outbound for API
Tomorrow: Development edit unit & qty to insert table Inbound & O...
Anonymous
13:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #145 (Closed): Plant survey install IOT JTEKT
Layout location install PLC
Layout location install HMI
Layout location install Bekido monitor
Layout location wir...
Santi Srichankaew
12:18 Asian Stanley. International Limited Project progress work #95 (In Progress): Support installation for power supply and LAN cable for 20 points
[25/10/23]
-Survey the area where the printer, electrical cabinet, LAN cabinet, and wire rails are installed above t...
Arunwit Isarapongporn
12:18 Tomas Tech Co.,Ltd. Sales support #45 (Closed): PTL DEMO kit concept for murata
Ryo Nozaki
12:11 Asian Stanley. International Limited Project progress work #8: Support installation for power supply and LAN cable for 50 points
[24/10/23]
-Setup IP address and setting application for all remaining Handy terminal devices.
-The setup printer n...
Arunwit Isarapongporn

24 Oct 2023

21:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #143 (Closed): Production IoT project requirements and support project
Ryo Nozaki
21:39 ACME INDUSTRY CO.,LTD. Project progress work #142 (Closed): UAT about the WMS system and onsite support
Ryo Nozaki
19:45 Asian Stanley. International Limited Project progress work #59: Support installation HT-Label printing system
Today
-Set IP addresses and setting application for all remaining Handy devices.
-Set printer name.
-set preset on...
Soraya Norasing
18:59 Asteer (Thailand) Co., Ltd. Project progress work #21 (Close request): Handy terminal application system Development.
Kittisak Isarapongporn
16:06 Asteer (Thailand) Co., Ltd. Project progress work #21 (Confirmation request): Handy terminal application system Development.
Develop HT Software Finish krub. Kamol Anekchatnuntakool
18:59 Shodensha (Thailand) Co., Ltd. Problem-Bug #60 (Close request): Procedure manual application development modifictaion problem
Kittisak Isarapongporn
18:59 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (Close request): Install function Cancel inbound and outbound
Kittisak Isarapongporn
16:44 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (Confirmation request): Install function Cancel inbound and outbound
Installation Web Pegasus completed.
Yutthapong Sricha
07:46 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (In Progress): Install function Cancel inbound and outbound
Yutthapong Sricha
18:59 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (Close request): HTA_NSET completion fix bug.
Kittisak Isarapongporn
16:45 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
Today: Development edit Stock Adjusment
Tomorrow: Development edit Inbound & Outbound for API
Anonymous
08:00 Asian Stanley. International Limited Problem-Bug #73: Found 500 return error
To day will montitor web on TV screen by Anydesk.
Yutthapong Sricha
07:56 Ebisu Foods Co Ltd. Project progress work #16: WMS Web Development
Today 24-Oct-2023
1. checking test and Triggers Inbound (insertAfter_Inbound/updateModifired_Inbound)
2. Waitting S...
Yutthapong Sricha

21 Oct 2023

17:46 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (Confirmation request): HTA_NSET completion fix bug.
“Problem”
1.)The slip can be printed even if the qty is incomplete. Normally it must be unprintable.
2.)Adjust scr...
Soraya Norasing
13:41 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (In Progress): HTA_NSET completion fix bug.
Soraya Norasing
13:41 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #138 (Closed): HTA_NSET completion fix bug.
List of bugs as reported by the customer in the attached file. Soraya Norasing
15:36 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring
Deverlop HMI Bekido and OA monitoring
PLC creat program
Santi Srichankaew
15:33 ADVICS Manufacturing(Thailand)Co.,Ltd. Sales support #140 (Closed): IOT Monitoring
-Alarm CNC monitoring mo FANUC
-Concept IOT
Santi Srichankaew
15:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #139 (Closed): Meeting Kick off IOT bekido and OA monitoring
-Scope of work
-Part support
-Schedule work flow
-HMI monitor viewer
-Layout plants
Next metting
24/10/2023 ...
Santi Srichankaew
15:29 Shodensha (Thailand) Co., Ltd. Problem-Bug #60 (Confirmation request): Procedure manual application development modifictaion problem
I revise Manual Software finish krub. Kamol Anekchatnuntakool
13:38 Asian Stanley. International Limited Project progress work #59: Support installation HT-Label printing system
[20/10/23]
-setup handy and install application on handy
-test printing label form handy to printer server. and fo...
Soraya Norasing
12:41 Asian Stanley. International Limited Problem-Bug #73: Found 500 return error
Fixed error
1. set time interval load data every 30 second.
2. add script auto refresh page if have error code 500....
Yutthapong Sricha
09:31 Mitsui Precision Thai Co.,Ltd Sales support #137 (Closed): Sales and presentation about Pegasus production management system
Ryo Nozaki
08:44 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (Closed): Install function Cancel inbound and outbound
24 Oct 2023
I will install function Cancel inbound and outbound
Today K.Oh holiday krub.
Yutthapong Sricha

20 Oct 2023

18:36 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
Today: Development edit Stock Check
Tomorrow: Development Stock Adjusment
Anonymous
17:22 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #50 (Close request): Add delete function
Kittisak Isarapongporn
08:14 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #50 (Confirmation request): Add delete function
function cancel outbound pegasus completed
change design inbound
add function cancel inbound
update stack after ...
Yutthapong Sricha
16:14 Shodensha (Thailand) Co., Ltd. Problem-Bug #60: Procedure manual application development modifictaion problem
Revise manual application krub. Kamol Anekchatnuntakool
09:54 Shodensha (Thailand) Co., Ltd. Problem-Bug #60 (In Progress): Procedure manual application development modifictaion problem
Revise manual application krub. Kamol Anekchatnuntakool
07:40 Asian Stanley. International Limited Project progress work #8: Support installation for power supply and LAN cable for 50 points
19/10/2023
- The power distribution cabinet and lag hub cabinet have been installed and connected to the Network.
-...
Arunwit Isarapongporn
 