From 10 Oct 2023 to 19 Oct 2023

19 Oct 2023

21:59 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #67 (In Progress): Automatic label pasting machine Concept proposal
- Material Received Data
- RFID equipment spec
Nattapol Poeam
21:55 Tomas Tech Co.,Ltd. Sales support #30 (In Progress): [FY2023]Common management for Nattapol
Nattapol Poeam
21:49 MURATA(THAILAND)CO.,LTD. Sales support #40: Install PTL System at OfficeMate Suvinthawong
Quotation from SND Rev.2 Nattapol Poeam
21:45 Tomas Tech Co.,Ltd. Sales support #45: PTL DEMO kit concept for murata
Quote from ATT Rev.1 Nattapol Poeam
14:58 Tomas Tech Co.,Ltd. Sales support #45: PTL DEMO kit concept for murata
Update Concept PTL picking Cart Rev.1 Nattapol Poeam
20:57 Asian Stanley. International Limited Project progress work #59: Support installation HT-Label printing system
- Set up IP printer and test printing via server.
Soraya Norasing
20:51 Asian Stanley. International Limited Project progress work #59 (In Progress): Support installation HT-Label printing system
Soraya Norasing
20:47 A.N.I. LOGISTICS, LTD. Problem-Bug #135 (Close request): The power went off
Kittisak Isarapongporn
20:46 A.N.I. LOGISTICS, LTD. Problem-Bug #135 (Closed): The power went off
Support to restart the system and checking Kittisak Isarapongporn
20:40 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
Today: Development Stock Check
Tomorrow: Development edit Stock Check
Anonymous
18:10 Tomas Tech Co.,Ltd. Project progress work #35 (Close request): PLC alarm record and send to line notify
Kittisak Isarapongporn
14:04 Tomas Tech Co.,Ltd. Project progress work #35 (Confirmation request): PLC alarm record and send to line notify
Develop Software send picture from PLC to line notify OK krub. Kamol Anekchatnuntakool
14:55 ATA Casting Technology Co., Ltd. Problem-Bug #56: Packing system no need scan pallet no
Add Source Code krub. Kamol Anekchatnuntakool
10:17 ATA Casting Technology Co., Ltd. Problem-Bug #56 (Close request): Packing system no need scan pallet no
Kittisak Isarapongporn
07:58 ATA Casting Technology Co., Ltd. Problem-Bug #56 (Confirmation request): Packing system no need scan pallet no
Kamol Anekchatnuntakool
14:30 Asteer (Thailand) Co., Ltd. Project progress work #21: Handy terminal application system Development.
Change due date to 10/24/2023 because I revise software Shodensha 10/20/2023 - 10/21/2023 krub. Kamol Anekchatnuntakool
09:20 Asteer (Thailand) Co., Ltd. Project progress work #21: Handy terminal application system Development.
Develop HT send data to PLC. Kamol Anekchatnuntakool
12:47 A.N.I. LOGISTICS, LTD. Project progress work #134 (Closed): [Installation&On-site support] CKD process management system phase3 for ANI
Ryo Nozaki
12:47 A.N.I. LOGISTICS, LTD. Project progress work #133 (Closed): [Installation&On-site support] CKD process management system phase3 for ANI
Ryo Nozaki
12:47 A.N.I. LOGISTICS, LTD. Project progress work #132 (Closed): [Installation&On-site support] CKD process management system phase3 for ANI
Ryo Nozaki
12:39 A.N.I. LOGISTICS, LTD. Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java
Ryo Nozaki
12:38 A.N.I. LOGISTICS, LTD. Project progress work #130 (Closed): [Coding]Inner packing screen function C#
Ryo Nozaki
12:37 A.N.I. LOGISTICS, LTD. Project progress work #129 (Interruption): [Coding]PHP Pegasus web function
Ryo Nozaki
12:37 A.N.I. LOGISTICS, LTD. Project progress work #128 (Closed): [Internal Design] DB and various functions, man-hour calculation
Ryo Nozaki
12:35 A.N.I. LOGISTICS, LTD. Problem-Bug #58 (Closed): [CKD Pegasus system phase 1&2]Packing data not found error on Handy and Tablet in outer packing area
Ryo Nozaki
10:11 A.N.I. LOGISTICS, LTD. Problem-Bug #58 (Close request): [CKD Pegasus system phase 1&2]Packing data not found error on Handy and Tablet in outer packing area
Kittisak Isarapongporn
12:32 Thai Nippon foods Co.,Ltd. Project progress work #127 (Closed): [Installation&On-site support] Production IoT system for TNF
Ryo Nozaki
12:32 Thai Nippon foods Co.,Ltd. Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF
Ryo Nozaki
12:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #125 (Closed): [Installation&On-site support] Production IoT system for JATH
Ryo Nozaki
12:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH
Ryo Nozaki
12:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #123 (Closed): [Installation&On-site support] Production IoT system for JATH
Ryo Nozaki
12:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #122 (Closed): [Coding&UT] PHP web function
Ryo Nozaki
12:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #121 (Closed): [Coding&UT] PLC and DB linkage function
Ryo Nozaki
12:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen
Ryo Nozaki
12:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation
Ryo Nozaki
12:07 DENSO Philippines Corporation Project progress work #118 (Closed): [Installation]Link with smart device and PHP web Data reference, graph creation, scan Kanban registration functions at Philippines
Ryo Nozaki
12:06 DENSO Philippines Corporation Project progress work #117 (Closed): [Installation]Link with smart device and PHP web Data reference, graph creation, scan Kanban registration functions at Philippines
Ryo Nozaki
12:06 DENSO Philippines Corporation Project progress work #116 (Closed): [System Testing]Link with smart device and PHP web Data reference, graph creation, scan Kanban registration functions
Ryo Nozaki
12:05 DENSO Philippines Corporation Project progress work #115 (Closed): [System Testing]Link with smart device and PHP web Data reference, graph creation, scan Kanban registration functions
Ryo Nozaki
12:05 DENSO Philippines Corporation Project progress work #114 (Closed): [System Testing]Link with smart device and PHP web Data reference, graph creation, scan Kanban registration functions
Ryo Nozaki
12:04 DENSO Philippines Corporation Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01
Ryo Nozaki
12:02 DENSO Philippines Corporation Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01
Ryo Nozaki
12:01 DENSO Philippines Corporation Project progress work #111 (Closed): [Internal Design] DB and various functions, man-hour calculation
Ryo Nozaki
11:59 Asteer (Thailand) Co., Ltd. Project progress work #110 (Closed): [On-site support]Support after cutover
Ryo Nozaki
11:59 Asteer (Thailand) Co., Ltd. Project progress work #109 (Closed): [On-site support]Support after cutover
Ryo Nozaki
11:55 Ebisu Foods Co Ltd. Project progress work #108 (Closed): [Installation&On-site support]Project Warehouse management system for Ebisu
Ryo Nozaki
11:55 Ebisu Foods Co Ltd. Project progress work #107 (Closed): [Installation&On-site support]Project Warehouse management system for Ebisu
Ryo Nozaki
11:50 Minebea AccessSolutions Thai Ltd Project progress work #106 (Closed): [System Testing]ST with AS400
Ryo Nozaki
11:49 Minebea AccessSolutions Thai Ltd Project progress work #105 (Closed): [Coding]Data linkage function
Ryo Nozaki
11:47 Minebea AccessSolutions Thai Ltd Project progress work #104 (Closed): [Installation&On-site support]Project Stock management system for MAS-T
Ryo Nozaki
11:47 Minebea AccessSolutions Thai Ltd Project progress work #103 (Closed): [Installation&On-site support]Project Stock management system for MAS-T
Ryo Nozaki
11:47 Minebea AccessSolutions Thai Ltd Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T
Ryo Nozaki
11:44 Minebea AccessSolutions Thai Ltd Project progress work #101 (Closed): [System Testing]Handyterminal and Web
Ryo Nozaki
11:43 Minebea AccessSolutions Thai Ltd Project progress work #100 (Closed): [System Testing]Handyterminal and Web
Ryo Nozaki
11:42 Minebea AccessSolutions Thai Ltd Project progress work #99 (Closed): [System Testing]Handyterminal and Web
Ryo Nozaki
11:42 Minebea AccessSolutions Thai Ltd Project progress work #98 (Closed): [Coding]PHP Pegasus web function
Ryo Nozaki
11:39 Minebea AccessSolutions Thai Ltd Project progress work #97 (Closed): [Coding]Android handyterminal BTA500
Ryo Nozaki
11:38 Minebea AccessSolutions Thai Ltd Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation
Ryo Nozaki
11:35 Asian Stanley. International Limited Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points
Support installation for power supply and LAN cable for 20 points
- Control and coordinate between wiring or LAN ins...
Ryo Nozaki
11:29 ACME INDUSTRY CO.,LTD. Project progress work #94 (Closed): [On-site support]Support after cutover
Ryo Nozaki
11:29 ACME INDUSTRY CO.,LTD. Project progress work #93 (Interruption): [On-site support]Support after cutover
Ryo Nozaki
11:28 ACME INDUSTRY CO.,LTD. Project progress work #92 (Closed): [On-site support]Support after cutover
Ryo Nozaki
11:20 ADVICS Manufacturing(Thailand)Co.,Ltd. Project progress work #12: Addition function display
Update program complate
Wait customer comments
Santi Srichankaew
10:17 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #47 (Close request): create spectification document
Kittisak Isarapongporn
09:49 Asteer (Thailand) Co., Ltd. Project progress work #38: Devolop and debug PLC Mitsubishi Q Series
Deverlop PLC Keyencce test OK/NG data sendingnormal
next step
Deverlop to PLC Mitsubishi waiting demo PLC Mitsubi...
Santi Srichankaew
08:25 Ebisu Foods Co Ltd. Project progress work #16: WMS Web Development

Today
Waiting Team SAP Ebisu send API Link Sales Order to me
Yutthapong Sricha
08:10 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #50: Add delete function
Today
change design Outbound
add function cancel Outbound
update stack after cancel Outbound
calculate stock c...
Yutthapong Sricha
08:07 Asian Stanley. International Limited Problem-Bug #73 (In Progress): Found 500 return error
Today I will Monitor by remote Anydesk
Yutthapong Sricha
08:05 ATA Casting Technology Co., Ltd. Project progress work #91 (Closed): Modify Pegasus.
The customer has requested to modify the search for the number of Pallet digits from 9 to 14 for Pegasus. Kamol Anekchatnuntakool

18 Oct 2023

21:06 MURATA(THAILAND)CO.,LTD. Sales support #40 (In Progress): Install PTL System at OfficeMate Suvinthawong
Ryo Nozaki
21:04 MURATA(THAILAND)CO.,LTD. Sales support #40 (New): Install PTL System at OfficeMate Suvinthawong
Ryo Nozaki
08:23 MURATA(THAILAND)CO.,LTD. Sales support #40: Install PTL System at OfficeMate Suvinthawong
Wait SND team sent new Quotation for add price HUB and rack Atchai Konthong
20:43 A.N.I. LOGISTICS, LTD. Sales support #62 (In Progress): CKD project phase3 Proposal activities + requirements definition
Ryo Nozaki
18:57 A.N.I. LOGISTICS, LTD. Sales support #62 (Closed): CKD project phase3 Proposal activities + requirements definition
CKD project phase3 Proposal activities + requirements definition
Schedule : Pre-kick off meeting with Mr.Sakamoto ...
Ryo Nozaki
20:39 Nissan Motor (Thailand) Co., Ltd. Problem-Bug #90 (Closed): Found the problem on HT02
Ryo Nozaki
20:37 Nissan Motor (Thailand) Co., Ltd. Sales support #89 (Closed): New OCR project for Fac1 and Fac2
Handy terminal and plc for keyence concept
We will get po at Mid-Dec
Ryo Nozaki
20:34 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #88 (Closed): NSET - Compo detail (Add new slip)
NSET - Compo detail (Add new slip)
Vietnamese will now test.
Ryo Nozaki
20:33 Thai Nippon foods Co.,Ltd. Project progress work #87 (Closed): IoT Equipment for machine operation project
Ryo Nozaki
20:31 Thai Nippon foods Co.,Ltd. Sales support #86 (Closed): IoT Equipment for Water treatment project
Ryo Nozaki
20:14 Valeo Comfort and Driving Assistance Systems (Thailand) Limited Project progress work #85 (Closed): Scanner-PLC Data Convert suggetion
Ryo Nozaki
20:13 NTN Manufacturing(Thailand) Co., Ltd. Sales support #84 (Closed): NTN - iReporter suggetion
Recheck the form on tablet
Wait for P
Ryo Nozaki
20:12 ACME INDUSTRY CO.,LTD. Sales support #83 (Closed): PJ - line monitoring assembly & PJ- Machine operation monitoring Molding line
IoT project
PJ - line monitoring assembly & pj - Machine operation monitoring Molding line
Ryo Nozaki
20:10 NTPT Company Limited. Sales support #82 (Closed): NTPT - Warehouse system Proposal activities + requirements definition
Ryo Nozaki
20:09 NTPT Company Limited. Sales support #81 (Closed): NTPT - Documentation management Proposal activities + requirements definition
NTPT - Documentation management
Proposal activities + requirements definition
Ryo Nozaki
20:08 Tomas Tech Co.,Ltd. Sales support #80 (Closed): DPS operation training
'- Application software
- Database structure
- Studying the SDMAT software (40%)
Ryo Nozaki
20:06 Siam Denso Manufacturing Co.,Ltd. Sales support #79 (Closed): New line 23
Waiting for PO
Already survey and estimate the price.
Ryo Nozaki
20:06 Siam Denso Manufacturing Co.,Ltd. Problem-Bug #78 (Closed): Found problem about the alarm of sequnce
Will enter site to solve the problem. 18th Nov Ryo Nozaki
20:05 Siam Denso Manufacturing Co.,Ltd. Project progress work #77 (Closed): Data insertion test time
K.Kamol is testing. Will confirm user for installation plan.
Waiting for file from user.
Will install after inserte...
Ryo Nozaki
20:03 Nidec Techno Motor (Thailand) Co.,Ltd. Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy
Found partail number exceed problem
Still can't reproduce the problem.
Add the logger in application and sent t...
Ryo Nozaki
20:00 MAX(THAILAND)CO.,LTD. Problem-Bug #75 (Closed): Email function test
Ryo Nozaki
19:56 Asian Stanley. International Limited Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.
Request to add 2 access points on the low signal area.
Wiring is also need.
Request quote from SND
Ryo Nozaki
19:54 Asian Stanley. International Limited Problem-Bug #73 (Closed): Found 500 return error
Can't reproduce the problem
Increase the memory allocate for PHP to 1GB
Ryo Nozaki
19:51 Asian Stanley. International Limited Sales support #72 (Closed): Request the Windows server 2022 standard/ MSSQL2022 standard license
Request the Windows server 2022 standard/ MSSQL2022 standard license Ryo Nozaki
19:49 ATA Casting Technology Co., Ltd. Sales support #71 (In Progress): Machine operation monitoring
Wait feedback from customer Ryo Nozaki
19:48 ATA Casting Technology Co., Ltd. Sales support #71 (Closed): Machine operation monitoring
Ryo Nozaki
19:46 Kaneka (Thailand) Co., Ltd. Sales support #70 (In Progress): Kaneka - WMS pegasus Prepare quotation about M/A plan
Wait for feedback from Kaneka Ryo Nozaki
19:45 Kaneka (Thailand) Co., Ltd. Sales support #70 (Closed): Kaneka - WMS pegasus Prepare quotation about M/A plan
Send quote for Kaneka Ryo Nozaki
19:44 SIAM TRIX MANUFACTURING CO.,LTD. Sales support #69 (In Progress): Trix - Production planning software
Wait for Japanese person on this Friday 11Aug Ryo Nozaki
19:43 SIAM TRIX MANUFACTURING CO.,LTD. Sales support #69 (Closed): Trix - Production planning software
Ryo Nozaki
19:42 Ueda Plastic (Thailand) Co.,Ltd. Sales support #68 (Closed): User request to add the new function about stock check remaining
Ryo Nozaki
19:37 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #67 (Closed): Automatic label pasting machine Concept proposal
Ryo Nozaki
19:34 DAIFUKU (THAILAND) LTD. Project progress work #66 (Closed): [Area3]Camera control system
Ryo Nozaki
19:33 DAIFUKU (THAILAND) LTD. Project progress work #65 (Closed): [Area2]Camera control system
Ryo Nozaki
19:32 DAIFUKU (THAILAND) LTD. Project progress work #64 (Closed): [Area1]Camera control system
Ryo Nozaki
19:27 ACME INDUSTRY CO.,LTD. Sales support #63 (Closed): IoT project Proposal activities + requirements definition
Ryo Nozaki
19:11 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
Today: Development faction Change Location
Tomorrow: Development Stock Check
Anonymous
18:54 EBARA FOODS (THAILAND) CO., LTD. Sales support #61 (Closed): Proposal activities + proposal document creation
Production management system proposal activities.
Requires linkage with accounting system.
Ryo Nozaki
18:49 Shodensha (Thailand) Co., Ltd. Problem-Bug #60 (Closed): Procedure manual application development modifictaion problem
Ryo Nozaki
18:40 Asian Stanley. International Limited Project progress work #13 (Closed): Additional development of 4 screens
Ryo Nozaki
18:39 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14 (Closed): Develop 4 additional functions
Ryo Nozaki
18:39 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #15 (Closed): SMTP handy terminal system malfunction
Ryo Nozaki
18:38 Tomas Tech Co.,Ltd. Project progress work #35 (In Progress): PLC alarm record and send to line notify
please add source code file Ryo Nozaki
18:37 Asian Stanley. International Limited Problem-Bug #37 (In Progress): UPS have problem
This case is not yet closed.
Change the person in charge. We will take action by October 31st.
Ryo Nozaki
18:35 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #41 (Closed): ์ New condition
Ryo Nozaki
17:40 ATA Casting Technology Co., Ltd. Problem-Bug #56: Packing system no need scan pallet no
The customer has requested to edit the search for the number of Pallet digits from 9 to 14 for Pegasus. Kamol Anekchatnuntakool
17:25 Asian Stanley. International Limited Project progress work #59 (Closed): Support installation HT-Label printing system
-install and setup program on Handy, Server, Laptop, Printer.
-test printing label
-user training [program on handy...
Soraya Norasing
17:20 ADVICS Manufacturing(Thailand)Co.,Ltd. Project progress work #12: Addition function display
Wait customer comment Santi Srichankaew
17:10 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #55: handy terminal BT-A500 coding with Java Android.
Today: develop the functionality of the program page. And check database with customers, The customer created a new t... Soraya Norasing
14:34 A.N.I. LOGISTICS, LTD. Problem-Bug #58 (Closed): [CKD Pegasus system phase 1&2]Packing data not found error on Handy and Tablet in outer packing area
Problem:
The tablet didn't show some packing list data. [Fixed]
The handy still found the problem. [In progress]
...
Kittisak Isarapongporn
14:01 ACME INDUSTRY CO.,LTD. Project progress work #54 (Interruption): Meeting about the pegasus
Kittisak Isarapongporn
11:10 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #50 (In Progress): Add delete function
change design inbound
add function cancel inbound
update stack after cancel inbound
calculate stock card record...
Yutthapong Sricha
11:02 Ebisu Foods Co Ltd. Project progress work #16: WMS Web Development
Test report API sap to wms excerl
update create storeprocedure schedule waiting data form SAP and check trigger in...
Yutthapong Sricha
08:27 MURATA(THAILAND)CO.,LTD. Sales support #39: Install PTL System at food passion
Sent new Quotation to K.Soravit and wait MURATA PO Atchai Konthong
08:17 Tomas Tech Co.,Ltd. Sales support #43: Install SR-X300S at Pandora
Customer confirm install demo kit on station in next week
Buy small box for install power supply
Atchai Konthong

17 Oct 2023

22:20 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
Today: Development faction Stock Management
Tomorrow: Development API Stock Management
Anonymous
20:17 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #55 (In Progress): handy terminal BT-A500 coding with Java Android.
Today: Design and adjust screen layout on Android Studio and check the functionality of the login page.
Tomorrow: St...
Soraya Norasing
15:33 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #55 (Closed): handy terminal BT-A500 coding with Java Android.
HTA_NSET app modification add Entranceexit management.
Implement handy terminal coding with Android Java.
Soraya Norasing
20:13 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #47 (Confirmation request): create spectification document
Soraya Norasing
20:11 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #47 (In Progress): create spectification document
The spectification document is finished.
Sent email with attachment to customer.
Soraya Norasing
15:26 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #47: create spectification document
create specification document done Soraya Norasing
19:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #57 (Closed): Production IoT project requirements definition
Ryo Nozaki
19:56 ATA Casting Technology Co., Ltd. Problem-Bug #56 (Closed): Packing system no need scan pallet no
Packing system no need scan pallet no Ryo Nozaki

16 Oct 2023

17:44 Tomas Tech Co.,Ltd. Project progress work #35 (Close request): PLC alarm record and send to line notify
Kittisak Isarapongporn
17:44 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #15 (Close request): SMTP handy terminal system malfunction
Kittisak Isarapongporn
08:27 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #15 (Confirmation request): SMTP handy terminal system malfunction

Yutthapong Sricha
17:44 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14 (Close request): Develop 4 additional functions
Kittisak Isarapongporn
07:57 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14 (Confirmation request): Develop 4 additional functions
Noted Krub
HT_SMPT.zip is coding Handdy
SMPT.zip is web pegasus
Yutthapong Sricha
17:44 Asian Stanley. International Limited Project progress work #13 (Close request): Additional development of 4 screens
Kittisak Isarapongporn
08:20 Asian Stanley. International Limited Project progress work #13 (Confirmation request): Additional development of 4 screens
last update screen
Yutthapong Sricha
16:51 Asteer (Thailand) Co., Ltd. Project progress work #21: Handy terminal application system Development.
Change Due date : 10/19/2023. Kamol Anekchatnuntakool
16:41 ACME INDUSTRY CO.,LTD. Project progress work #54 (Interruption): Meeting about the pegasus
Kittisak Isarapongporn
16:40 ACME INDUSTRY CO.,LTD. Project progress work #53 (Closed): UAT about the WMS system
:: Last updated: 2023-10-16
Present the current develop software of pegasus and handy.
Kittisak Isarapongporn
16:36 ACME INDUSTRY CO.,LTD. Project progress work #52 (Closed): Issue topics
:: last updated: 2023-10-16
- Summarize the remaining topics and issues below.
1. Nisshin Ship & Air
- unit_qty...
Kittisak Isarapongporn
16:27 ACME INDUSTRY CO.,LTD. Project progress work #51 (Closed): Overall project development for web and handy
::2023-10-16
Development (Remaining topic/function)
+ Web
1. Overview report [Pending]
2. Tag Reprint [NEW] - s...
Kittisak Isarapongporn

12 Oct 2023

16:14 Tomas Tech Co.,Ltd. Project progress work #35 (Confirmation request): PLC alarm record and send to line notify
Kamol Anekchatnuntakool
12:01 Tomas Tech Co.,Ltd. Sales support #43: Install SR-X300S at Pandora
Install Demo kit and test run at Pandora plant
and wait for confirm install demo kit on station
Atchai Konthong
10:53 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #50 (Closed): Add delete function
Ryo Nozaki
10:52 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #15 (In Progress): SMTP handy terminal system malfunction
please add sauce code file Ryo Nozaki
10:51 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14 (In Progress): Develop 4 additional functions
please add source code file Ryo Nozaki

11 Oct 2023

22:01 Asian Stanley. International Limited Project progress work #42: HT-Label printing system
Today:
-Find the font for your label.(Still not finished)
-Edit the report with K.Ball (Finished editing)
Tomor...
Soraya Norasing
16:44 Tomas Tech Co.,Ltd. Sales support #45: PTL DEMO kit concept for murata
Get quotation of scanner from 3 company
and contact maker for build structure with e-mail
Atchai Konthong
13:44 NTPT Company Limited. Project progress work #49 (In Progress): ConMas i-Reporter tablet quote 43sets
Ryo Nozaki
13:43 NTPT Company Limited. Project progress work #49 (Closed): ConMas i-Reporter tablet quote 43sets
iPad wifi type Lead time 0.5month
Case With Hand Strap & Kick-Stand Lead time 2months ...
Ryo Nozaki
13:11 Tomas Tech Co.,Ltd. Project progress work #18 (Closed): Train Dr.Sum and MotionBoard at online
Ryo Nozaki
13:10 Tomas Tech Co.,Ltd. Project progress work #34 (Closed): PLC alarm record and send to line notify
Ryo Nozaki
11:07 Tomas Tech Co.,Ltd. Sales support #48 (Closed): Redmine email notifications
Redmine email notifications setting Ryo Nozaki
10:14 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #47 (Closed): create spectification document
create screen image and create spectification document for Direct Labor Management system Soraya Norasing
09:14 Tomas Tech Co.,Ltd. Sales support #46 (In Progress): Safety training adjustment
Safety training adjustment
Isuzu Engine Manufacturing Co.,(Thailand)LTD
Siam Denso Manufacturing Co.,Ltd
Siam Ai...
Ryo Nozaki
08:21 Asian Stanley. International Limited Project progress work #8: Support installation for power supply and LAN cable for 50 points
- Install the electrical cabinet and electrical rail in the Chip room and connect the wires.
- Install the LAN cabin...
Arunwit Isarapongporn
01:47 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #41 (Close request): ์ New condition
Kittisak Isarapongporn
01:47 Asian Stanley. International Limited Problem-Bug #37 (Close request): UPS have problem
Kittisak Isarapongporn

10 Oct 2023

23:26 MURATA(THAILAND)CO.,LTD. Sales support #40 (In Progress): Install PTL System at OfficeMate Suvinthawong
Get Quote from SND team Atchai Konthong
23:23 Tomas Tech Co.,Ltd. Sales support #43 (In Progress): Install SR-X300S at Pandora
Prepare part and test program before install in 11 Oct 13.00 PM. Atchai Konthong
08:37 Tomas Tech Co.,Ltd. Sales support #43: Install SR-X300S at Pandora
K.kamol create program excel file use with SR-X300S and install program and equipment at 11 Oct on 13.00 PM. Atchai Konthong
08:33 Tomas Tech Co.,Ltd. Sales support #43 (Closed): Install SR-X300S at Pandora
K.kamol create program excel file use with SR-X300S Atchai Konthong
23:15 Tomas Tech Co.,Ltd. Sales support #45 (In Progress): PTL DEMO kit concept for murata
Make requirement structure to Auto Tec team and get Quote of box from 3 supplier Atchai Konthong
13:37 Tomas Tech Co.,Ltd. Sales support #45 (Closed): PTL DEMO kit concept for murata
make concept and summrize drawing and quote for shelf and equipment 15 unit
- PTL Model MW 2040
- Shelf 3 floor...
Atchai Konthong
22:35 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #41 (Confirmation request): ์ New condition
Today : I've finished developing a new conditional function, An email has been sent to inform customers.
[HTA_NSET V...
Soraya Norasing
22:15 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
Today: Development faction Outbound Frozen, check stock and location Remaining amount
Tomorrow: Development API Outb...
Anonymous
08:49 Asian Stanley. International Limited Problem-Bug #37 (Confirmation request): UPS have problem
Customer Order UPS 35 Set, Found 2 sets with problems
now BCN Fixed and delivery to customer
Atchai Konthong
08:45 Asian Stanley. International Limited Project progress work #8: Support installation for power supply and LAN cable for 50 points
- Install the electrical cabinet and electrical rail in the Chip room and connect the wires.
- Install the LAN cable...
Arunwit Isarapongporn
08:40 Tomas Tech Co.,Ltd. Sales support #44 (Closed): CKD & Meji Meeting IOT Monitoring system
-CKD & Meji Meeting IOT Monitoring system at office
Concepts
Demokit flow meter control IO
Show status on mobile ...
Santi Srichankaew
 