Project

General

Profile

Activity

From 03 Oct 2023 to 12 Oct 2023

12 Oct 2023

16:14 Tomas Tech Co.,Ltd. Project progress work #35 (Confirmation request): PLC alarm record and send to line notify
Kamol Anekchatnuntakool
12:01 Tomas Tech Co.,Ltd. Sales support #43: Install SR-X300S at Pandora
Install Demo kit and test run at Pandora plant
and wait for confirm install demo kit on station
Atchai Konthong
10:53 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #50 (Closed): Add delete function
Ryo Nozaki
10:52 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #15 (In Progress): SMTP handy terminal system malfunction
please add sauce code file Ryo Nozaki
10:51 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14 (In Progress): Develop 4 additional functions
please add source code file Ryo Nozaki

11 Oct 2023

22:01 Asian Stanley. International Limited Project progress work #42: HT-Label printing system
Today:
-Find the font for your label.(Still not finished)
-Edit the report with K.Ball (Finished editing)
Tomor...
Soraya Norasing
16:44 Tomas Tech Co.,Ltd. Sales support #45: PTL DEMO kit concept for murata
Get quotation of scanner from 3 company
and contact maker for build structure with e-mail
Atchai Konthong
13:44 NTPT Company Limited. Project progress work #49 (In Progress): ConMas i-Reporter tablet quote 43sets
Ryo Nozaki
13:43 NTPT Company Limited. Project progress work #49 (Closed): ConMas i-Reporter tablet quote 43sets
iPad wifi type Lead time 0.5month
Case With Hand Strap & Kick-Stand Lead time 2months ...
Ryo Nozaki
13:11 Tomas Tech Co.,Ltd. Project progress work #18 (Closed): Train Dr.Sum and MotionBoard at online
Ryo Nozaki
13:10 Tomas Tech Co.,Ltd. Project progress work #34 (Closed): PLC alarm record and send to line notify
Ryo Nozaki
11:07 Tomas Tech Co.,Ltd. Sales support #48 (Closed): Redmine email notifications
Redmine email notifications setting Ryo Nozaki
10:14 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #47 (Closed): create spectification document
create screen image and create spectification document for Direct Labor Management system Soraya Norasing
09:14 Tomas Tech Co.,Ltd. Sales support #46 (In Progress): Safety training adjustment
Safety training adjustment
Isuzu Engine Manufacturing Co.,(Thailand)LTD
Siam Denso Manufacturing Co.,Ltd
Siam Ai...
Ryo Nozaki
08:21 Asian Stanley. International Limited Project progress work #8: Support installation for power supply and LAN cable for 50 points
- Install the electrical cabinet and electrical rail in the Chip room and connect the wires.
- Install the LAN cabin...
Arunwit Isarapongporn
01:47 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #41 (Close request): ์ New condition
Kittisak Isarapongporn
01:47 Asian Stanley. International Limited Problem-Bug #37 (Close request): UPS have problem
Kittisak Isarapongporn

10 Oct 2023

23:26 MURATA(THAILAND)CO.,LTD. Sales support #40 (In Progress): Install PTL System at OfficeMate Suvinthawong
Get Quote from SND team Atchai Konthong
23:23 Tomas Tech Co.,Ltd. Sales support #43 (In Progress): Install SR-X300S at Pandora
Prepare part and test program before install in 11 Oct 13.00 PM. Atchai Konthong
08:37 Tomas Tech Co.,Ltd. Sales support #43: Install SR-X300S at Pandora
K.kamol create program excel file use with SR-X300S and install program and equipment at 11 Oct on 13.00 PM. Atchai Konthong
08:33 Tomas Tech Co.,Ltd. Sales support #43 (Closed): Install SR-X300S at Pandora
K.kamol create program excel file use with SR-X300S Atchai Konthong
23:15 Tomas Tech Co.,Ltd. Sales support #45 (In Progress): PTL DEMO kit concept for murata
Make requirement structure to Auto Tec team and get Quote of box from 3 supplier Atchai Konthong
13:37 Tomas Tech Co.,Ltd. Sales support #45 (Closed): PTL DEMO kit concept for murata
make concept and summrize drawing and quote for shelf and equipment 15 unit
- PTL Model MW 2040
- Shelf 3 floor...
Atchai Konthong
22:35 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #41 (Confirmation request): ์ New condition
Today : I've finished developing a new conditional function, An email has been sent to inform customers.
[HTA_NSET V...
Soraya Norasing
22:15 Ebisu Foods Co Ltd. Project progress work #17: WMS handy terminal BT-A500 coding with Java Android.
Today: Development faction Outbound Frozen, check stock and location Remaining amount
Tomorrow: Development API Outb...
Anonymous
08:49 Asian Stanley. International Limited Problem-Bug #37 (Confirmation request): UPS have problem
Customer Order UPS 35 Set, Found 2 sets with problems
now BCN Fixed and delivery to customer
Atchai Konthong
08:45 Asian Stanley. International Limited Project progress work #8: Support installation for power supply and LAN cable for 50 points
- Install the electrical cabinet and electrical rail in the Chip room and connect the wires.
- Install the LAN cable...
Arunwit Isarapongporn
08:40 Tomas Tech Co.,Ltd. Sales support #44 (Closed): CKD & Meji Meeting IOT Monitoring system
-CKD & Meji Meeting IOT Monitoring system at office
Concepts
Demokit flow meter control IO
Show status on mobile ...
Santi Srichankaew

09 Oct 2023

23:30 Asteer (Thailand) Co., Ltd. Project progress work #38 (In Progress): Devolop and debug PLC Mitsubishi Q Series
Postpone the completion schedule because of K.Kamol have urgent work. Atchai Konthong
23:27 MURATA(THAILAND)CO.,LTD. Sales support #39: Install PTL System at food passion
Wait K.Ryo Make PO for SND Team and PO for turnover box cart Atchai Konthong
23:20 Asian Stanley. International Limited Sales support #36: UPS can not use in some position at LINE model H9J
Maker was informed that it will be builds completed by the end of this month for 2 Unit transformer isolate Atchai Konthong
17:18 Asian Stanley. International Limited Project progress work #13: Additional development of 4 screens
update set auto redirect
every 5 minutes
step direct
1. screen1
2. screen3
3. screen4
4. screen2
after scre...
Yutthapong Sricha
11:06 Asian Stanley. International Limited Project progress work #13: Additional development of 4 screens
image Screen 1-4 Fixed Data date 19-Aug-2023
code in asi.zip set Data date is Current time

Code is run on loc...
Yutthapong Sricha
17:16 Asian Stanley. International Limited Project progress work #42: HT-Label printing system
Project development on Handy Terminal is complete.
[Project issues are awaiting resolution.]
-The customer would ...
Soraya Norasing
17:00 Asian Stanley. International Limited Project progress work #42 (In Progress): HT-Label printing system
Soraya Norasing
16:59 Asian Stanley. International Limited Project progress work #42 (Closed): HT-Label printing system
Label printing development project scheduled to be delivered to Asian Stanley
Implement handy terminal coding with A...
Soraya Norasing
17:15 Tomas Tech Co.,Ltd. Project progress work #34 (Close request): PLC alarm record and send to line notify
Kittisak Isarapongporn
17:15 Tomas Tech Co.,Ltd. Project progress work #18 (Close request): Train Dr.Sum and MotionBoard at online
Kittisak Isarapongporn
17:15 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #15 (Close request): SMTP handy terminal system malfunction
Kittisak Isarapongporn
10:46 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #15 (Confirmation request): SMTP handy terminal system malfunction
21-Aug-2023 On site Sanko Mold
1. Install remote handy on Desktop ( for future update by remote )
2. Check Handdy ...
Yutthapong Sricha
17:15 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14 (Close request): Develop 4 additional functions
Kittisak Isarapongporn
10:38 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14: Develop 4 additional functions
start project 7-Aug-2023 (Rev4 barcode data item+customer)
and change Revise process (Rev5 barcode date item only bu...
Yutthapong Sricha
16:27 Asteer (Thailand) Co., Ltd. Project progress work #21 (In Progress): Handy terminal application system Development.
Develop Handy terminal system. Kamol Anekchatnuntakool

08 Oct 2023

01:54 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #41: ์ New condition
05/10/23 : Study the original source code of the program.
07/10/23 : Check information on the database and started f...
Soraya Norasing
01:34 Nidec Techno Motor (Thailand) Co.,Ltd. Project progress work #41 (Closed): ์ New condition
Added verification conditions before printing labels. Soraya Norasing

07 Oct 2023

16:41 Asian Stanley. International Limited Sales support #36 (In Progress): UPS can not use in some position at LINE model H9J
Atchai Konthong
15:34 Asian Stanley. International Limited Sales support #36 (Closed): UPS can not use in some position at LINE model H9J
UPS model 100 VCA can't use because main power have Wiring delta type only in some position when checked with BCN tea... Atchai Konthong
16:41 Asian Stanley. International Limited Problem-Bug #37 (In Progress): UPS have problem
Atchai Konthong
15:43 Asian Stanley. International Limited Problem-Bug #37 (Closed): UPS have problem
Customer Order UPS 35 Set, Found 2 sets with problems
The UPS that was returned for inspection was found to be dam...
Atchai Konthong
16:40 MURATA(THAILAND)CO.,LTD. Sales support #39 (In Progress): Install PTL System at food passion
Atchai Konthong
16:30 MURATA(THAILAND)CO.,LTD. Sales support #39 (Closed): Install PTL System at food passion
Customer need install PTL 40 Unit and Turnover box cart 40 Unit
Now we have Quote for Install form SND and Quote f...
Atchai Konthong
16:39 MURATA(THAILAND)CO.,LTD. Sales support #40 (Closed): Install PTL System at OfficeMate Suvinthawong
Customer need to install PTL 600 set
Atchai Konthong
16:00 Asteer (Thailand) Co., Ltd. Project progress work #38 (Closed): Devolop and debug PLC Mitsubishi Q Series
Start Devolop 10/9/2023
Devolop ladder for transfer data Handy and PLC
Using DM
D4000~
Atchai Konthong
15:18 Tomas Tech Co.,Ltd. Project progress work #35 (In Progress): PLC alarm record and send to line notify
Kamol Anekchatnuntakool
15:18 Tomas Tech Co.,Ltd. Project progress work #35 (Closed): PLC alarm record and send to line notify
Develop connect auto change date name csv File. Kamol Anekchatnuntakool
15:13 Tomas Tech Co.,Ltd. Project progress work #34 (Confirmation request): PLC alarm record and send to line notify
Complete Santi Srichankaew
15:07 Tomas Tech Co.,Ltd. Project progress work #34 (Closed): PLC alarm record and send to line notify
Deverloper machine alarm sennd notity
[Response]
K.Kamol Program send line nottfy
k.Santi Program PLC record SD ...
Santi Srichankaew
15:05 Tomas Tech Co.,Ltd. Sales support #20 (New): [FY2023]Common management for Soraya
Ryo Nozaki
15:00 Tomas Tech Co.,Ltd. Sales support #20 (In Progress): [FY2023]Common management for Soraya
Ryo Nozaki
13:55 Tomas Tech Co.,Ltd. Sales support #20: [FY2023]Common management for Soraya
regarding NTPT i-Reporter meeting and support for customer Redmine Admin
13:54 Tomas Tech Co.,Ltd. Sales support #20 (Closed): [FY2023]Common management for Soraya
Redmine Admin
15:05 Tomas Tech Co.,Ltd. Sales support #33 (Closed): [FY2023]Common management for Anek
Ryo Nozaki
15:04 Tomas Tech Co.,Ltd. Sales support #32 (Closed): [FY2023]Common management for Yutthapong
Ryo Nozaki
15:04 Tomas Tech Co.,Ltd. Sales support #31 (Closed): [FY2023]Common management for Santi
Ryo Nozaki
15:04 Tomas Tech Co.,Ltd. Sales support #30 (Closed): [FY2023]Common management for Nattapol
Ryo Nozaki
15:04 Tomas Tech Co.,Ltd. Sales support #29 (Closed): [FY2023]Common management for Narupot
Ryo Nozaki
15:03 Tomas Tech Co.,Ltd. Sales support #28 (Closed): [FY2023]Common management for Kittisak
Ryo Nozaki
15:03 Tomas Tech Co.,Ltd. Sales support #27 (Closed): [FY2023]Common management for Kamol
Ryo Nozaki
15:02 Tomas Tech Co.,Ltd. Sales support #26 (Closed): [FY2023]Common management for Atchai
Ryo Nozaki
15:01 Tomas Tech Co.,Ltd. Sales support #25 (Closed): [FY2023]Common management for Arunwit
Ryo Nozaki
15:01 Tomas Tech Co.,Ltd. Sales support #24 (Closed): [FY2023]Common management for Ryo Nozaki
Ryo Nozaki
14:57 ATA Casting Technology Co., Ltd. Project progress work #23 (In Progress): Addition to function skip process
wait result customer changed machine operation flow. Santi Srichankaew
14:54 ATA Casting Technology Co., Ltd. Project progress work #23 (Closed): Addition to function skip process
[Problem]
-Lamp display show incorrect step operation
-Machine laser on start long time
-data leak test no.83 not...
Santi Srichankaew
14:41 DENSO Philippines Corporation Project progress work #22 (In Progress): Make specification document for project
Ryo Nozaki
14:40 DENSO Philippines Corporation Project progress work #22 (Closed): Make specification document for project
Ryo Nozaki
14:35 Asteer (Thailand) Co., Ltd. Project progress work #21 (Closed): Handy terminal application system Development.
Start Develop 10/09/2023 Kamol Anekchatnuntakool
12:45 Tomas Tech Co.,Ltd. Project progress work #18 (Confirmation request): Train Dr.Sum and MotionBoard at online
Yutthapong Sricha
12:44 Tomas Tech Co.,Ltd. Project progress work #18 (Closed): Train Dr.Sum and MotionBoard at online
Train Dr.Sum and MotionBoard Yutthapong Sricha
12:32 Ebisu Foods Co Ltd. Project progress work #17 (In Progress): WMS handy terminal BT-A500 coding with Java Android.
Anonymous
12:30 Ebisu Foods Co Ltd. Project progress work #17 (Closed): WMS handy terminal BT-A500 coding with Java Android.
A WMS development project scheduled to be delivered to Ebisu foods.
Implement handy terminal coding with Android Java.
Anonymous
12:27 Ebisu Foods Co Ltd. Project progress work #16 (In Progress): WMS Web Development
Yutthapong Sricha
12:26 Ebisu Foods Co Ltd. Project progress work #16 (Closed): WMS Web Development
A WMS development project scheduled to be delivered to Ebisu foods.
Implement web coding with PHP.
Yutthapong Sricha
12:22 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #15 (In Progress): SMTP handy terminal system malfunction
Yutthapong Sricha
12:19 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #15 (Closed): SMTP handy terminal system malfunction
[Problem]
1.Stock card not recalculate stock after sync data (Inbound) to PEGASUS
2.Improper display settings
3.Ha...
Yutthapong Sricha
12:21 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14: Develop 4 additional functions
[Sauce code link]
MS teams Link
Yutthapong Sricha
12:06 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14 (Confirmation request): Develop 4 additional functions
Yutthapong Sricha
12:05 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14 (Closed): Develop 4 additional functions
Add the following features:
1.Simple Inbound
2.Simple Outbound
3.Stock card information displayed on web screen
4...
Yutthapong Sricha
11:59 Asian Stanley. International Limited Project progress work #13 (In Progress): Additional development of 4 screens
Yutthapong Sricha
11:58 Asian Stanley. International Limited Project progress work #13 (Closed): Additional development of 4 screens
Additional development of 4 screens
1.Adding actual information to production plans.
2.Adding actual information to...
Yutthapong Sricha
00:03 ATA Casting Technology Co., Ltd. Project progress work #9 (In Progress): Installation update scripts delta line of traceability system
Issue ATA -06-10-2023
1. Function search
- Part No. separated between BorgWarner and Delta.
2. Function search...
Arunwit Isarapongporn

06 Oct 2023

23:58 Asian Stanley. International Limited Project progress work #8: Support installation for power supply and LAN cable for 50 points
Install power plugs and LAN connections in chip room for 50 point Arunwit Isarapongporn
08:54 Asian Stanley. International Limited Project progress work #8 (In Progress): Support installation for power supply and LAN cable for 50 points
today install 10 position
and tomorrow install 10point
Arunwit Isarapongporn
08:52 Asian Stanley. International Limited Project progress work #8 (Closed): Support installation for power supply and LAN cable for 50 points
Support installation for power supply and LAN cable for 50 points
- Control and coordinate between wiring or LAN ins...
Arunwit Isarapongporn
16:43 ADVICS Manufacturing(Thailand)Co.,Ltd. Project progress work #12 (In Progress): Addition function display
Santi Srichankaew
16:36 ADVICS Manufacturing(Thailand)Co.,Ltd. Project progress work #12 (Closed): Addition function display
-Add result Model-L
-Add result Model-R
-Export daily report result Model-L
-Export daily report result Model-R
-...
Santi Srichankaew
11:46 UFM Fuji Super Co., Ltd. Project progress work #11 (Closed): [PJ230048] Sales Handy terminal
Ryo Nozaki
11:44 UFM Fuji Super Co., Ltd. Project progress work #11 (In Progress): [PJ230048] Sales Handy terminal
Ryo Nozaki
11:43 UFM Fuji Super Co., Ltd. Project progress work #11 (Closed): [PJ230048] Sales Handy terminal
Ryo Nozaki
11:32 Minebea AccessSolutions Thai Ltd Project progress work #10 (In Progress): Creating a specification document
Ryo Nozaki
11:31 Minebea AccessSolutions Thai Ltd Project progress work #10 (Closed): Creating a specification document
Creating a specification document from Aug 31st version R1 Ryo Nozaki
09:05 ATA Casting Technology Co., Ltd. Project progress work #9 (Closed): Installation update scripts delta line of traceability system
Update scripts web application of traceability system and update SQL trigers on DB3 Arunwit Isarapongporn
 

Also available in: Atom