21 Nov 2024
- 16:44 8.00 hours (Project progress work #807 (Closed): Coding Frontend New Menu )
- Coding Frontend Overall Chart
20 Nov 2024
- 16:44 8.00 hours (Project progress work #807 (Closed): Coding Frontend New Menu )
- Coding Frontend Bekido Chart and Fix Frontend Electric Summary
19 Nov 2024
- 16:37 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- Coding Frontend Bekido Chart
18 Nov 2024
- 21:50 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Develop program function NG and Troubleshooting
- 21:49 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Develop program function NG and Troubleshooting
- 16:33 8.00 hours (Project progress work #807 (Closed): Coding Frontend New Menu )
- Coding Frontend Meter Capacity
- 16:33 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 16:32 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 01:14 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Wiring cabinet
- 01:14 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Wiring cabinet
- 01:14 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Wiring cabinet
- 01:13 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Wiring cabinet
- 01:12 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Wiring cabinet
- 01:11 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Wiring cabinet
- 01:10 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Wiring cabinet
- 01:10 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Wiring cabinet
17 Nov 2024
- 23:56 8.00 hours (Project progress work #700 (Closed): PR Electrical part )
- Make PO
- 22:44 8.00 hours (Project progress work #699 (Closed): Electrical Diagram)
- Meeting at site
16 Nov 2024
- 17:38 10.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 15:48 11.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 15:48 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 15:46 6.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 15:46 9.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 15:44 10.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:45 9.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:44 11.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:43 12.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:41 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:40 12.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:32 12.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:31 11.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:31 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:30 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:30 11.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 13:52 12.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 13:46 10.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation Addon monitoring
- 17:03 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- Coding backend Production Monitoring Gantt Chart
- 16:18 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:18 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:18 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:18 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:17 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:16 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:16 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:15 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
15 Nov 2024
- 20:22 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- Coding backend Alarm Analysis Chart
- 09:29 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:29 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:26 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:20 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Training Manul JTEKT infrastructure project
- 09:15 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:15 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Manul JTEKT infrastructure project
- 09:14 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Manul JTEKT infrastructure project
- 09:14 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
14 Nov 2024
- 16:20 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- Coding backend Alarm Analysis
13 Nov 2024
- 16:25 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- Coding backend Electric Summary
12 Nov 2024
- 16:17 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- develop backend Production Monitoring Data Chart and Input Information
Also available in: Atom