From 12 Nov 2024 to 21 Nov 2024

21 Nov 2024

16:44 8.00 hours (Project progress work #807 (Closed): Coding Frontend New Menu )
Coding Frontend Overall Chart Jirayu Naewprayong

20 Nov 2024

16:44 8.00 hours (Project progress work #807 (Closed): Coding Frontend New Menu )
Coding Frontend Bekido Chart and Fix Frontend Electric Summary Jirayu Naewprayong

19 Nov 2024

16:37 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
Coding Frontend Bekido Chart Jirayu Naewprayong

18 Nov 2024

21:50 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Develop program function NG and Troubleshooting Nattapol Poeam
21:49 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
Develop program function NG and Troubleshooting Nattapol Poeam
16:33 8.00 hours (Project progress work #807 (Closed): Coding Frontend New Menu )
Coding Frontend Meter Capacity Jirayu Naewprayong
16:33 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
16:32 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
01:14 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Wiring cabinet Phatthadon Inthachot
01:14 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Wiring cabinet Phatthadon Inthachot
01:14 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Wiring cabinet Phatthadon Inthachot
01:13 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Wiring cabinet Phatthadon Inthachot
01:12 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Wiring cabinet Phatthadon Inthachot
01:11 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Wiring cabinet Phatthadon Inthachot
01:10 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Wiring cabinet Phatthadon Inthachot
01:10 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Wiring cabinet Phatthadon Inthachot

17 Nov 2024

23:56 8.00 hours (Project progress work #700 (Closed): PR Electrical part )
Make PO Phatthadon Inthachot
22:44 8.00 hours (Project progress work #699 (Closed): Electrical Diagram)
Meeting at site Phatthadon Inthachot

16 Nov 2024

17:38 10.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
15:48 11.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
15:48 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
15:46 6.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
15:46 9.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
15:44 10.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
14:45 9.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
14:44 11.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
14:43 12.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
14:41 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
14:40 12.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
14:32 12.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
14:31 11.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
14:31 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
14:30 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
14:30 11.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
13:52 12.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Nattapong Sukcharoen
13:46 10.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support Installation Addon monitoring Nattapong Sukcharoen
17:03 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
Coding backend Production Monitoring Gantt Chart Jirayu Naewprayong
16:18 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Assembly hardware and wiring Nattapong Sukcharoen
16:18 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Assembly hardware and wiring Nattapong Sukcharoen
16:18 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Assembly hardware and wiring Nattapong Sukcharoen
16:18 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Assembly hardware and wiring Nattapong Sukcharoen
16:17 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Assembly hardware and wiring Nattapong Sukcharoen
16:16 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Assembly hardware and wiring Nattapong Sukcharoen
16:16 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Assembly hardware and wiring Nattapong Sukcharoen
16:15 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
Assembly hardware and wiring Nattapong Sukcharoen

15 Nov 2024

20:22 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
Coding backend Alarm Analysis Chart Jirayu Naewprayong
09:29 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:29 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:28 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:27 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:27 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:27 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:27 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:26 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:25 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:23 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:23 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:23 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:23 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:22 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:21 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:21 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:21 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:21 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:21 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
Program and Dashboard Development Panupong Raksakit
09:20 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Training Manul JTEKT infrastructure project Panupong Raksakit
09:15 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:15 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Manul JTEKT infrastructure project Panupong Raksakit
09:14 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Manul JTEKT infrastructure project Panupong Raksakit
09:14 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:13 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:12 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:11 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:10 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:09 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:09 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:09 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:09 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit
09:09 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
Program and Dashboard Development Panupong Raksakit

14 Nov 2024

16:20 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
Coding backend Alarm Analysis Jirayu Naewprayong

13 Nov 2024

16:25 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
Coding backend Electric Summary Jirayu Naewprayong

12 Nov 2024

16:17 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
develop backend Production Monitoring Data Chart and Input Information Jirayu Naewprayong
 