For internal project work assignment report without Nozaki

« December 2025 | February »

Apply Clear

Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1

28

29

30

31

1

2

3

2

4

5

Project progress work #3192: [Coding] SIT Project progress work #3192: [Coding] SIT

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 05 Jan 2026
Due date: 11 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
Project progress work #3190: [Coding] Web application Project progress work #3190: [Coding] Web application

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 05 Jan 2026
Due date: 11 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
Project progress work #3189: [Coding] SIT Project progress work #3189: [Coding] SIT

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 05 Jan 2026
Due date: 11 Jan 2026
Assignee: Suphawat Tinaso
Priority: Normal
Project progress work #3187: [Coding] Windows applicatio... Project progress work #3187: [Coding] Windows application & Database

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 05 Jan 2026
Due date: 11 Jan 2026
Assignee: Suphawat Tinaso
Priority: Normal
Project progress work #3186: [Coding] SIT Project progress work #3186: [Coding] SIT

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 05 Jan 2026
Due date: 11 Jan 2026
Assignee: Sermsak Prowee
Priority: Normal

6

7

8

9

10

3

11

Project progress work #3192: [Coding] SIT Project progress work #3192: [Coding] SIT

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 05 Jan 2026
Due date: 11 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
Project progress work #3190: [Coding] Web application Project progress work #3190: [Coding] Web application

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 05 Jan 2026
Due date: 11 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
Project progress work #3189: [Coding] SIT Project progress work #3189: [Coding] SIT

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 05 Jan 2026
Due date: 11 Jan 2026
Assignee: Suphawat Tinaso
Priority: Normal
Project progress work #3187: [Coding] Windows applicatio... Project progress work #3187: [Coding] Windows application & Database

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 05 Jan 2026
Due date: 11 Jan 2026
Assignee: Suphawat Tinaso
Priority: Normal
Project progress work #3186: [Coding] SIT Project progress work #3186: [Coding] SIT

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 05 Jan 2026
Due date: 11 Jan 2026
Assignee: Sermsak Prowee
Priority: Normal
Project progress work #2810: [Coding] Master PLC Project progress work #2810: [Coding] Master PLC

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 01 Dec 2025
Due date: 11 Jan 2026
Assignee: Sermsak Prowee
Priority: Normal

12

Project progress work #3245: [Installation&On-site suppo... Project progress work #3245: [Installation&On-site support] Teaching for UT/User Testing & Trial/Supports user feedback

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Sermsak Prowee
Priority: Normal
Project progress work #3244: [Installation&On-site suppo... Project progress work #3244: [Installation&On-site support] Web application validation check

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
Project progress work #3243: [Installation&On-site suppo... Project progress work #3243: [Installation&On-site support] Windows application validation check

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Suphawat Tinaso
Priority: Normal
Project progress work #3242: [Installation&On-site suppo... Project progress work #3242: [Installation&On-site support] PLC Validation check

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Sermsak Prowee
Priority: Normal
Project progress work #3241: [Installation&On-site suppo... Project progress work #3241: [Installation&On-site support] Data validation

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee:
Priority: Normal
Project progress work #3240: [Installation&On-site suppo... Project progress work #3240: [Installation&On-site support] Web application installation

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
Project progress work #3239: [Installation&On-site suppo... Project progress work #3239: [Installation&On-site support] Windows application installation

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Suphawat Tinaso
Priority: Normal
Project progress work #3238: [Installation&On-site suppo... Project progress work #3238: [Installation&On-site support] DB Set up and modification

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Suphawat Tinaso
Priority: Normal
Project progress work #3237: [Installation&On-site suppo... Project progress work #3237: [Installation&On-site support] Software Installation

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee:
Priority: Normal
Project progress work #3236: [Installation&On-site suppo... Project progress work #3236: [Installation&On-site support] Software master PLC System Installation

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Sermsak Prowee
Priority: Normal
Project progress work #3235: [Installation&On-site suppo... Project progress work #3235: [Installation&On-site support] Final Inspection machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3234: [Installation&On-siiite sup... Project progress work #3234: [Installation&On-siiite support] Insulator Assy machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3233: [Installation&On-site suppo... Project progress work #3233: [Installation&On-site support] Guage Check machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3232: [Installation&On-site suppo... Project progress work #3232: [Installation&On-site support] Leak test machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3231: [Installation &On-site supp... Project progress work #3231: [Installation &On-site support] Tube Assy machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3230: [Installation&On-site suppo... Project progress work #3230: [Installation&On-site support] Pump assy machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3229: [Installation&On-site suppo... Project progress work #3229: [Installation&On-site support] 500D Welding machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3228: [Installation&On-site suppo... Project progress work #3228: [Installation&On-site support] Welding No.2 Machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3227: [Installation&On-site suppo... Project progress work #3227: [Installation&On-site support] Welding No.1 Machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3226: [Installation&On-site suppo... Project progress work #3226: [Installation&On-site support] Bracket Welding machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3225: [Installation&On-site suppo... Project progress work #3225: [Installation&On-site support] Boring machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3204: [Coding] Final Inspection m... Project progress work #3204: [Coding] Final Inspection machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3203: [Coding] Insulator Assy mac... Project progress work #3203: [Coding] Insulator Assy machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3202: [Coding] Guage Check machin... Project progress work #3202: [Coding] Guage Check machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3201: [Coding] Leak test machine ... Project progress work #3201: [Coding] Leak test machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3200: [Coding] Tube Assy machine ... Project progress work #3200: [Coding] Tube Assy machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3199: [Coding] Pump assy machine ... Project progress work #3199: [Coding] Pump assy machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3198: [Coding] 500D Welding machi... Project progress work #3198: [Coding] 500D Welding machine [ Zone 1 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3197: [Coding] Welding No.2 machi... Project progress work #3197: [Coding] Welding No.2 machine [ Zone 1 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3196: [Coding] Welding No.1 machi... Project progress work #3196: [Coding] Welding No.1 machine [ Zone 1 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3195: [Coding] Bracket Welding ma... Project progress work #3195: [Coding] Bracket Welding machine [ Zone 1 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3194: [Coding] Boring machine [ Z... Project progress work #3194: [Coding] Boring machine [ Zone 1 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3193: [Coding] Machine data prepare Project progress work #3193: [Coding] Machine data prepare

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal

13

14

15

16

Project progress work #3245: [Installation&On-site suppo... Project progress work #3245: [Installation&On-site support] Teaching for UT/User Testing & Trial/Supports user feedback

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Sermsak Prowee
Priority: Normal
Project progress work #3244: [Installation&On-site suppo... Project progress work #3244: [Installation&On-site support] Web application validation check

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
Project progress work #3243: [Installation&On-site suppo... Project progress work #3243: [Installation&On-site support] Windows application validation check

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Suphawat Tinaso
Priority: Normal
Project progress work #3242: [Installation&On-site suppo... Project progress work #3242: [Installation&On-site support] PLC Validation check

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Sermsak Prowee
Priority: Normal
Project progress work #3241: [Installation&On-site suppo... Project progress work #3241: [Installation&On-site support] Data validation

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee:
Priority: Normal
Project progress work #3240: [Installation&On-site suppo... Project progress work #3240: [Installation&On-site support] Web application installation

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Phattarapong Kammee
Priority: Normal
Project progress work #3239: [Installation&On-site suppo... Project progress work #3239: [Installation&On-site support] Windows application installation

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Suphawat Tinaso
Priority: Normal
Project progress work #3238: [Installation&On-site suppo... Project progress work #3238: [Installation&On-site support] DB Set up and modification

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Suphawat Tinaso
Priority: Normal
Project progress work #3237: [Installation&On-site suppo... Project progress work #3237: [Installation&On-site support] Software Installation

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee:
Priority: Normal
Project progress work #3236: [Installation&On-site suppo... Project progress work #3236: [Installation&On-site support] Software master PLC System Installation

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Sermsak Prowee
Priority: Normal
Project progress work #3235: [Installation&On-site suppo... Project progress work #3235: [Installation&On-site support] Final Inspection machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3234: [Installation&On-siiite sup... Project progress work #3234: [Installation&On-siiite support] Insulator Assy machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3233: [Installation&On-site suppo... Project progress work #3233: [Installation&On-site support] Guage Check machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3232: [Installation&On-site suppo... Project progress work #3232: [Installation&On-site support] Leak test machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3231: [Installation &On-site supp... Project progress work #3231: [Installation &On-site support] Tube Assy machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3230: [Installation&On-site suppo... Project progress work #3230: [Installation&On-site support] Pump assy machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3229: [Installation&On-site suppo... Project progress work #3229: [Installation&On-site support] 500D Welding machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3228: [Installation&On-site suppo... Project progress work #3228: [Installation&On-site support] Welding No.2 Machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3227: [Installation&On-site suppo... Project progress work #3227: [Installation&On-site support] Welding No.1 Machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3226: [Installation&On-site suppo... Project progress work #3226: [Installation&On-site support] Bracket Welding machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3225: [Installation&On-site suppo... Project progress work #3225: [Installation&On-site support] Boring machine

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3222: [Installation&On-site support] Project progress work #3222: [Installation&On-site support]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 13 Dec 2025
Due date: 16 Jan 2026
Assignee:
Priority: Normal
Project progress work #3204: [Coding] Final Inspection m... Project progress work #3204: [Coding] Final Inspection machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3203: [Coding] Insulator Assy mac... Project progress work #3203: [Coding] Insulator Assy machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3202: [Coding] Guage Check machin... Project progress work #3202: [Coding] Guage Check machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3201: [Coding] Leak test machine ... Project progress work #3201: [Coding] Leak test machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3200: [Coding] Tube Assy machine ... Project progress work #3200: [Coding] Tube Assy machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3199: [Coding] Pump assy machine ... Project progress work #3199: [Coding] Pump assy machine [ Zone 2 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal
Project progress work #3198: [Coding] 500D Welding machi... Project progress work #3198: [Coding] 500D Welding machine [ Zone 1 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3197: [Coding] Welding No.2 machi... Project progress work #3197: [Coding] Welding No.2 machine [ Zone 1 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3196: [Coding] Welding No.1 machi... Project progress work #3196: [Coding] Welding No.1 machine [ Zone 1 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3195: [Coding] Bracket Welding ma... Project progress work #3195: [Coding] Bracket Welding machine [ Zone 1 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3194: [Coding] Boring machine [ Z... Project progress work #3194: [Coding] Boring machine [ Zone 1 ]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Purinat Thongbaiyai
Priority: Normal
Project progress work #3193: [Coding] Machine data prepare Project progress work #3193: [Coding] Machine data prepare

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 12 Jan 2026
Due date: 16 Jan 2026
Assignee: Nattapong Sukcharoen
Priority: Normal

17

4

18

19

20

21

22

23

24

5

25

26

27

28

29

30

31