Activity
From 09 Sep 2024 to 18 Sep 2024
18 Sep 2024
17 Sep 2024
- 09:29 8.00 hours (Project progress work #459 (Closed): support user for process control system)
- install RAM and Harddisk on Server process control & Check label printer @PLCC room
- 09:17 8.00 hours (Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.)
- Installation&On-site support about Access point in Chip room
- 08:33 8.00 hours (Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.)
- Installation of access points in mold rooms
- 08:31 8.00 hours (Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.)
- Installation of access points in mold rooms
11 Sep 2024
- 10:28 4.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
- Fix slow data loading issues, fix API, test the system with customers.