Actions
Parent project #6731
open[PJ260035] Traceability system for TOYO ADVANCED
Start date:
17 Feb 2026
Due date:
17 Feb 2026 (32 days late)
Description
1 Hardwar
1-1 Control panel box 1 Set
1-2 Juntion box and Tower light ( 2 sets ) 1 Set
1-3 Server PC + Display + UPS 1 Set
1-4 Support SR-x300 and Sensor 2 Set
2 Software
2-1 Traceability system server app development costs 1 Job
2-2 Traceability system Handy terminal app development costs 1 Job
3 Internal work
3-1 Drawing design 1 Job
3-2 Assembly 1 Job
3-3 Wiring 1 Job
4 Installation
4-1 Installation at onsite 1 Job
4-2 System Configuration 1 Job
4-3 Test & Commistioning 1 Job
4-4 Packing and Transportation 1 Job
- Does not include Keyence hardware
- This does not include equipment operation guarantee or product warranty.
- Include dashboard screen only 1screen. User can not change themselves spec and design.
No data to display