Problem-Bug #595
closed
Parent project #544: [PJ230032]Traceability system for Delta line
ATA Casting traceability system delta line
Added by Teeradon Yuensakul over 1 year ago.
Updated about 2 months ago.
Assignee:
Teeradon Yuensakul
Programming skills:
PLC/Mitsubishi
Description
nvestigating problems with the Brogwroner line traceability system at ATA Casting
- Due date changed from 08 May 2024 to 14 May 2024
- % Done changed from 100 to 30
- Estimated time changed from 8.00 h to 40.00 h
- Parent task changed from #508 to #544
I think , Maybe product in some process is skiped , NG or not update to database .So when before packing the worker must scan QR-Code for checking OK every process . The scanner does not found product information.
- Status changed from New to In Progress
I think , Maybe product in some process is skiped , NG or not update to database .So when before packing the worker must scan QR-Code for checking OK every process . The scanner does not found product information.
- % Done changed from 30 to 60
- Project changed from Tomas Tech Co.,Ltd. to ATA Casting Technology Co., Ltd.
- Subject changed from ATA Casting to ATA Casting traceability system delta line
- Status changed from In Progress to Closed
- % Done changed from 60 to 100
Also available in: Atom
PDF