Problem-Bug #15
closed
Parent project #578: [PJ230026]Handy terminal stock management system for modification
SMTP handy terminal system malfunction
Added by Yutthapong Sricha about 2 years ago.
Updated over 1 year ago.
Description
[Problem]
1.Stock card not recalculate stock after sync data (Inbound) to PEGASUS
2.Improper display settings
3.Handy terminal freeze compatible
Add Request:
4.How to refer to data on a handy terminal [Simple inbound and outbound]
5.Regarding data reflection on stock card.
[Cause]
1.Inadequacies in cooperative program
2.It forgot to set it
3.The processing load during scanning is high.
[Solution]
1. The revised version will be reflected today, September 18th (Mon).
2. We will implement the settings on the display by September 20th (Wed). It can check the test version of the screen using the link below.
https://tom-demo-01.proen.app.ruk-com.cloud/smpt/pegasus/stock_card_board.php
3. Implemented changes to SQL during scan processing. Freezes were eliminated by lowering the load.
Additionally, the number of data kept on the handheld terminal was changed from 100 days to 7 days.
[Sauce code link]
Files
- % Done changed from 0 to 90
- Status changed from New to In Progress
- % Done changed from 90 to 100
21-Aug-2023 On site Sanko Mold
1. Install remote handy on Desktop ( for future update by remote )
2. Check Handdy sync master Data from Desktop and sync inbound outbound to pegasus result OK.
3. Check calurate Stock Card Record , and forecate moniter TV Data update real time.
4. Monitor Handdy ค้าง ยังไม่พบอาการ
5. User request Change Design Forecast ON TV etc. font size, color, speed scroll
6. Barcode บางส่วนไม่อ่าน จากการตรวจสอบ Barcode ผิด (มี Space ด้านหลังเกินมา 2 ตัว) แจ้งลูกค้าเรียบร้อยแล้ว ลูกค้าจะทำการตรวจสอบและแก้ไขต่อไป
7. set chrome bookmark website pegasus for 10 users
8. set Authority menu Stock Card Record , Stock forecast on Tv for department Production (PD) , Warehouse (WH)
9. set microsoft edge bookmark websit pegasus ให้ นายญี่ปุ่น
Develop Rev 6 completed.
- Status changed from Confirmation request to Close request
- Status changed from Close request to In Progress
please add sauce code file
- Tracker changed from Project progress work to Problem-Bug
- Status changed from Confirmation request to Close request
- Status changed from Close request to Closed
- Project changed from 21 to SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED.
- Parent task set to #578
Also available in: Atom
PDF