16 Nov 2023

23:10 ADVICS MANUFACTURING (THAILAND) CO., LTD. Sales support #164: IoT system for CNC line follow up
- Estimate cost
- Estimate time
* I'm not sure about data extraction from CNC machines.
Nattapol Poeam
23:10 ADVICS MANUFACTURING (THAILAND) CO., LTD. 2.00 hours (Sales support #164 (Closed): IoT system for CNC line follow up)
Estimate cost of loss analysis cnc line project Nattapol Poeam
16:24 TOMAS TECH CO., LTD. 3.00 hours (Project progress work #233 (Closed): Edit the data transmission concept of the Demo-Box line notify alert job.)
Support K.Santi and K.Kamol test Demo-Kit Nattapol Poeam
11:57 TOMAS TECH CO., LTD. Project progress work #233 (In Progress): Edit the data transmission concept of the Demo-Box line notify alert job.
Nattapol Poeam
11:57 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #233 (Closed): Edit the data transmission concept of the Demo-Box line notify alert job.)
Meeting about change new concept send and receive data between PC <> PLC Nattapol Poeam
11:54 TOMAS TECH CO., LTD. Project progress work #233 (Closed): Edit the data transmission concept of the Demo-Box line notify alert job.
- Change the concept of data transmission between PC and PLC. Previously using FTP File CSV method to PC caused a pro... Nattapol Poeam
16:00 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Project progress work #230 (In Progress): MC30OP80 program modification and create document for k.Boonyarit
Nattapol Poeam
16:00 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. 1.00 hour (Project progress work #230 (Closed): MC30OP80 program modification and create document for k.Boonyarit)
Make proposal addition program record data to CF-Card lineMC30 OP80 IEMT Nattapol Poeam
11:39 TOMAS TECH CO., LTD. Project progress work #165 (In Progress): IoT demo kit prepare box for Metarex at Nov
Nattapol Poeam

15 Nov 2023

16:56 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Internal meeting about make schedule and Explain the details of the work and the entire work scope of this work. Nattapol Poeam
15:53 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #216 (Confirmation request): NMT1&2,Trim Chassis shop To install OCR system project
Wait PO Nattapol Poeam
15:51 ADVICS MANUFACTURING (THAILAND) CO., LTD. Sales support #217 (In Progress): Meeting about Loss analysis system IoT project ( New Project )
[ Topic of today's meeting ] In-charge person K.Tanapiwat ( K.Got ),K.Noom <> Production ABS Section
>>> The custome...
Nattapol Poeam
15:51 ADVICS MANUFACTURING (THAILAND) CO., LTD. 6.00 hours (Sales support #217 (Closed): Meeting about Loss analysis system IoT project ( New Project ))
Meeting and site survey about monitoring system Nattapol Poeam
15:29 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 4.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
Explore additional work sites about testing reading Supplier barcodes and collecting additional information about cus... Nattapol Poeam
15:01 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Project progress work #218 (Confirmation request): Wiring lan cable and power cable of LineMC30 OP80
Nattapol Poeam
14:59 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. 5.00 hours (Project progress work #218 (Closed): Wiring lan cable and power cable of LineMC30 OP80)
Install complete Nattapol Poeam

14 Nov 2023

13:28 THAI NIPPON FOODS CO., LTD. Project progress work #201: Summary of all equipment for use in the Machine operation monitoring systems project.
List equipment of TNF_PJ230043
https://drive.google.com/drive/folders/1RhnGOBfTuZGQImPFWH4omgd_8RDj5-Ir?usp=drive_li...
Nattapol Poeam
13:28 THAI NIPPON FOODS CO., LTD. 3.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
Update list equipment of TNF project Nattapol Poeam
13:26 A.N.I. LOGISTICS, LTD. Project progress work #225 (In Progress): CCTV Installation
[ To day ]
- Contact supplier CCTV shadjan To bring CCTV equipment to test on 30/11/23 at 1:00 PM at A.N.I.
Equipme...
Nattapol Poeam
13:26 A.N.I. LOGISTICS, LTD. 1.00 hour (Project progress work #225 (Closed): CCTV Installation)
Contact supplier CCTV Nattapol Poeam
13:16 A.N.I. LOGISTICS, LTD. Project progress work #225 (Closed): CCTV Installation
CCTV Installation Nattapol Poeam

13 Nov 2023

17:11 THAI NIPPON FOODS CO., LTD. Sales support #175: EV charger installation project
Next action
> Support customer
> Wait PO
Nattapol Poeam
17:11 THAI NIPPON FOODS CO., LTD. 1.00 hour (Sales support #175 (Closed): EV charger installation project)
Update quotation and concept design about station charger Nattapol Poeam
17:03 THAI NIPPON FOODS CO., LTD. 2.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
Follow up quote form supplier Nattapol Poeam
17:00 TOMAS TECH CO., LTD. Project progress work #223 (In Progress): Internal check stock
Nattapol Poeam
17:00 TOMAS TECH CO., LTD. 3.00 hours (Project progress work #223 (Closed): Internal check stock)
Check stock equipment of project JTEKT,TNF,MAS Nattapol Poeam
16:59 TOMAS TECH CO., LTD. Project progress work #223 (Closed): Internal check stock
Check stock equipment all project Nattapol Poeam
16:54 KEYENCE (THAILAND) CO., LTD. Sales support #219 (Confirmation request): Keyence meeting
Purpose
- To update technics function and application
- To summarize onhand projects
- Update function PLC KV8000
...
Nattapol Poeam
16:54 KEYENCE (THAILAND) CO., LTD. 3.00 hours (Sales support #219 (Closed): Keyence meeting)
Meeting with team keyence Nattapol Poeam

10 Nov 2023

16:52 THAI NIPPON FOODS CO., LTD. Project progress work #201: Summary of all equipment for use in the Machine operation monitoring systems project.
Summarize equipment before order and requst a quotation supplier Nattapol Poeam
16:52 THAI NIPPON FOODS CO., LTD. 5.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
Summarize equipment before order Nattapol Poeam
15:30 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #67: Automatic label pasting machine Concept proposal
[ Today ]
Meeting agenda
1. Packet material
2. Layout machine
3. Process flow
[ Requiment from customer ]
1. Mo...
Nattapol Poeam
15:30 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 3.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
Meeting about review concept design with Panasonic team and Keyence team Nattapol Poeam
15:04 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #211: MACO monitor robot in production line IoT project
Update estimate cost MACO Nattapol Poeam
15:04 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. 1.00 hour (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Update estimate cost MACO Nattapol Poeam

09 Nov 2023

19:04 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #211: MACO monitor robot in production line IoT project
Wait price from Keyence Nattapol Poeam
19:04 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. 0.00 hour (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Make summarize price of equipment for MACO monitor robot in production line IoT project Nattapol Poeam
19:03 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. 0.00 hour (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Make summarize price of equipment for MACO monitor robot in production line IoT project Nattapol Poeam
16:58 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. 2.00 hours (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Estimate cost and summarize equipment next action follow up price Keyence Nattapol Poeam
08:40 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. 4.00 hours (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Meeting about the concept of machine operation monitoring systems Nattapol Poeam
08:39 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #211: MACO monitor robot in production line IoT project
[ To day ]
Meeting topic ( Request )
- Concept line production 14 Machine.
- Can monitor the operation of machines...
Nattapol Poeam
08:39 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. 4.00 hours (Project progress work #211 (Closed): MACO monitor robot in production line IoT project)
Meeting about the concept of machine operation monitoring systems Nattapol Poeam
17:12 THAI NIPPON FOODS CO., LTD. Project progress work #220 (In Progress): Design drawing and confirm equipment
Nattapol Poeam
17:09 THAI NIPPON FOODS CO., LTD. Project progress work #220 (Closed): Design drawing and confirm equipment
Design drawing
- TB Box
- I/O
Nattapol Poeam
17:00 THAI NIPPON FOODS CO., LTD. 5.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
Summarize equipment before order Nattapol Poeam
15:58 KEYENCE (THAILAND) CO., LTD. Sales support #219 (Closed): Keyence meeting
[ Purpose of the meeting ]
- To update technics function and application.
- To summarize onhand projects.
Nattapol Poeam
15:55 ISUZU ENGINE MANUFACTURING CO., (THAILAND) LTD. Project progress work #218 (Closed): Wiring lan cable and power cable of LineMC30 OP80
[ Task ]
- Wiring lan cable and power cable of LineMC30 OP80
- Config parameter SR2000
- Test trigger and monitor ...
Nattapol Poeam
15:50 ADVICS MANUFACTURING (THAILAND) CO., LTD. Sales support #217 (Closed): Meeting about Loss analysis system IoT project ( New Project )
In charge K.Tanapiwat [ Tel 086-156-8060 ]
Name production : Control
Onsite meeting Date 14/11/23 Time 10:00
Nattapol Poeam
11:01 NISSAN MOTOR (THAILAND) CO., LTD. 0.00 hour (Sales support #216 (Closed): NMT1&2,Trim Chassis shop To install OCR system project)
Specification OCR system installation project Plant1&2 Nattapol Poeam
10:57 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #216 (In Progress): NMT1&2,Trim Chassis shop To install OCR system project
Nattapol Poeam
10:57 NISSAN MOTOR (THAILAND) CO., LTD. 1.00 hour (Sales support #216 (Closed): NMT1&2,Trim Chassis shop To install OCR system project)
Meeting about concept NMT1&2,Trim Chassis shop To install OCR system project Nattapol Poeam
10:56 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #216 (Closed): NMT1&2,Trim Chassis shop To install OCR system project
[ Meeting topic ]
- A summary of the entire work scope of the project will be given to each maker who comes to the m...
Nattapol Poeam
09:39 ATA CASTING TECHNOLOGY CO., LTD. Problem-Bug #215 (In Progress): Request verification of the data collection of machine
Nattapol Poeam
09:36 ATA CASTING TECHNOLOGY CO., LTD. 4.00 hours (Problem-Bug #215 (Closed): Request verification of the data collection of machine)
On-site service to check and fix problems Nattapol Poeam
09:34 ATA CASTING TECHNOLOGY CO., LTD. Problem-Bug #215 (Closed): Request verification of the data collection of machine
The customer requested that the machine be inspected for traceability regarding recording data of the Laser mark and ... Nattapol Poeam

07 Nov 2023

22:38 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #211 (In Progress): MACO monitor robot in production line IoT project
Nattapol Poeam
22:38 MITSUBISHI HEAVY INDUSTRIES-MAHAJAK AIR CONDITIONERS CO., LTD. Project progress work #211 (Closed): MACO monitor robot in production line IoT project
In-Charge K.Anawill
On-site meeting
Nattapol Poeam
22:33 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Meeting about requiment from production section input data in production line and UI for monitoring Main UI Nattapol Poeam
22:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation)
Design function calculation time Bekido and other function Nattapol Poeam
22:26 PANDORA PRODUCTION CO., LTD. 8.00 hours (Sales support #210 (Closed): Auto trigger read QR-Code for Pandora project)
Make wiring box and install at site Nattapol Poeam
22:25 PANDORA PRODUCTION CO., LTD. Sales support #210 (In Progress): Auto trigger read QR-Code for Pandora project
Nattapol Poeam
22:25 PANDORA PRODUCTION CO., LTD. Sales support #210 (Closed): Auto trigger read QR-Code for Pandora project
Install and config SRX-300 for Read QR-Code from part customer Nattapol Poeam
22:19 BIG STAR CO., LTD. 4.00 hours (Sales support #209 (Closed): Shoe size sorting machine project Concept proposal )
Meeting and Site survey Nattapol Poeam
22:18 BIG STAR CO., LTD. Sales support #209 (In Progress): Shoe size sorting machine project Concept proposal
Nattapol Poeam
22:17 BIG STAR CO., LTD. Sales support #209 (Closed): Shoe size sorting machine project Concept proposal
Build a conveyor belt system for sorting shoes and sorting shoe sizes for BIG Star Co.,Ltd project Nattapol Poeam
22:09 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
Update specification R2 Nattapol Poeam
21:51 THAI NIPPON FOODS CO., LTD. 4.00 hours (Project progress work #87 (Closed): IoT Equipment for machine operation project)
Update specification R2 Nattapol Poeam
22:05 TAKEBE (THAILAND) CO., LTD. 4.00 hours (Sales support #208 (Closed): Takebe meeting about IoT monitoring system Project)
Meeting about IoT monitoring systems Nattapol Poeam
22:05 TAKEBE (THAILAND) CO., LTD. Sales support #208 (In Progress): Takebe meeting about IoT monitoring system Project
Nattapol Poeam
22:03 TAKEBE (THAILAND) CO., LTD. Sales support #208 (Closed): Takebe meeting about IoT monitoring system Project
People involved
Meji : Khun Kritsana chuay-rod ( Phone 080-942-9242 )
CKD : Khun Narongchai watcharenwong ( 084-694...
Nattapol Poeam
21:48 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #207 (Confirmation request): Meeting about review 3D Design
Nattapol Poeam
21:48 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 4.00 hours (Sales support #207 (Closed): Meeting about review 3D Design)
Nattapol Poeam
21:47 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #207 (Closed): Meeting about review 3D Design
Meeting about review 3D Design
- Conveyor design
- Tool robot design
- Sequence design
- Overall system
Nattapol Poeam
16:18 TOMAS TECH CO., LTD. Sales support #202 (Confirmation request): Meeting with the Keyence team about the new project Demo-kit.
The customer requested a case study on the Demo-Kit to present to supervisors involved in the decision to create the ... Nattapol Poeam
16:18 TOMAS TECH CO., LTD. 3.00 hours (Sales support #202 (Closed): Meeting with the Keyence team about the new project Demo-kit.)
Online meeting about Demo-kit YAMADA SOMBOON CO.,LTD Nattapol Poeam
09:58 TOMAS TECH CO., LTD. Sales support #202 (In Progress): Meeting with the Keyence team about the new project Demo-kit.
Nattapol Poeam
16:17 THAI NIPPON FOODS CO., LTD. Project progress work #201 (In Progress): Summary of all equipment for use in the Machine operation monitoring systems project.
Nattapol Poeam
16:13 THAI NIPPON FOODS CO., LTD. Project progress work #201 (Confirmation request): Summary of all equipment for use in the Machine operation monitoring systems project.
Nattapol Poeam
16:13 THAI NIPPON FOODS CO., LTD. 3.00 hours (Project progress work #201 (Closed): Summary of all equipment for use in the Machine operation monitoring systems project.)
Online meeting about Demo-kit YAMADA SOMBOON CO.,LTD Nattapol Poeam
09:56 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 8.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
Update document Nattapol Poeam
 