Ryo Nozaki's activity
From 16 Oct 2023 to 25 Oct 2023
25 Oct 2023
- 18:46 A.N.I. LOGISTICS, LTD. Problem-Bug #146 (Closed): Enhance the Store procedure to generate Production outer schedule
- 18:46 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #136 (Closed): Install function Cancel inbound and outbound
- 18:46 A.N.I. LOGISTICS, LTD. Problem-Bug #135 (Closed): The power went off
- 18:46 SHODENSHA (THAILAND) CO., LTD. Problem-Bug #60 (Closed): Procedure manual application development modifictaion problem
- 18:46 ATA CASTING TECHNOLOGY CO., LTD. Problem-Bug #56 (Closed): Packing system no need scan pallet no
- 18:46 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #50 (Closed): Add delete function
- 18:46 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #47 (Closed): create spectification document
- 18:46 TOMAS TECH CO., LTD. Project progress work #35 (Closed): PLC alarm record and send to line notify
- 18:46 ASTEER (THAILAND) CO., LTD. Project progress work #21 (Closed): Handy terminal application system Development.
- 18:45 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #138 (In Progress): HTA_NSET completion fix bug.
- please add soruce code file
- 12:18 TOMAS TECH CO., LTD. Sales support #45 (Closed): PTL DEMO kit concept for murata
- 12:18 TOMAS TECH CO., LTD. 10.00 hours (Sales support #45 (Closed): PTL DEMO kit concept for murata)
24 Oct 2023
- 21:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #143 (Closed): Production IoT project requirements and support project)
- 21:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #143 (Closed): Production IoT project requirements and support project
- 21:40 ACME INDUSTRY CO.,LTD. 10.00 hours (Project progress work #142 (Closed): UAT about the WMS system and onsite support)
- 21:39 ACME INDUSTRY CO.,LTD. Project progress work #142 (Closed): UAT about the WMS system and onsite support
23 Oct 2023
- 21:15 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #10 (Closed): Creating a specification document)
- 21:14 A.N.I. LOGISTICS, LTD. 6.00 hours (Sales support #62 (Closed): CKD project phase3 Proposal activities + requirements definition)
21 Oct 2023
- 09:34 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 2.00 hours (Sales support #57 (Closed): Production IoT project requirements definition)
- Meeting with Kishio san and exprain about wiring problem
- 09:32 ADVICS MANUFACTURING (THAILAND) CO., LTD. 2.00 hours (Project progress work #12 (Closed): Addition function display)
- Site check with Keyence Kobayashi and Uchikoshi
- 09:31 MITSUI PRECISION THAI CO., LTD. 4.00 hours (Sales support #137 (Closed): Sales and presentation about Pegasus production management system)
- meeting with Nakajima and Tokutome MD
- 09:31 MITSUI PRECISION THAI CO., LTD. Sales support #137 (Closed): Sales and presentation about Pegasus production management system
20 Oct 2023
- 13:49 TOMAS TECH CO., LTD. 5.00 hours (Sales support #24 (Closed): [FY2023]Common management for Ryo Nozaki)
- Redmine check and make issue
- 13:48 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #8 (Closed): Support installation for power supply and LAN cable for 50 points)
- Check site
19 Oct 2023
- 12:47 A.N.I. LOGISTICS, LTD. Project progress work #134 (Closed): [Installation&On-site support] CKD process management system phase3 for ANI
- 12:47 A.N.I. LOGISTICS, LTD. Project progress work #133 (Closed): [Installation&On-site support] CKD process management system phase3 for ANI
- 12:47 A.N.I. LOGISTICS, LTD. Project progress work #132 (Closed): [Installation&On-site support] CKD process management system phase3 for ANI
- 12:39 A.N.I. LOGISTICS, LTD. Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java
- 12:38 A.N.I. LOGISTICS, LTD. Project progress work #130 (Closed): [Coding]Inner packing screen function C#
- 12:37 A.N.I. LOGISTICS, LTD. Project progress work #129 (Interruption): [Coding]PHP Pegasus web function
- 12:37 A.N.I. LOGISTICS, LTD. Project progress work #128 (Closed): [Internal Design] DB and various functions, man-hour calculation
- 12:35 A.N.I. LOGISTICS, LTD. Problem-Bug #58 (Closed): [CKD Pegasus system phase 1&2]Packing data not found error on Handy and Tablet in outer packing area
- 12:32 THAI NIPPON FOODS CO., LTD. Project progress work #127 (Closed): [Installation&On-site support] Production IoT system for TNF
- 12:32 THAI NIPPON FOODS CO., LTD. Project progress work #126 (Closed): [Installation&On-site support] Production IoT system for TNF
- 12:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #125 (Closed): [Installation&On-site support] Production IoT system for JATH
- 12:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #124 (Closed): [Installation&On-site support] Production IoT system for JATH
- 12:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #123 (Closed): [Installation&On-site support] Production IoT system for JATH
- 12:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #122 (Closed): [Coding&UT] PHP web function
- 12:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #121 (Closed): [Coding&UT] PLC and DB linkage function
- 12:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #120 (Closed): [Coding&UT] KV8000 Touch display and XD02 monitor screen
- 12:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #119 (Closed): [Internal Design] DB and various functions, man-hour calculation
- 12:07 DENSO PHILIPPINES CORPORATION Project progress work #118 (Closed): [Installation]Link with smart device and PHP web Data reference, graph creation, scan Kanban registration functions at Philippines
- 12:06 DENSO PHILIPPINES CORPORATION Project progress work #117 (Closed): [Installation]Link with smart device and PHP web Data reference, graph creation, scan Kanban registration functions at Philippines
- 12:06 DENSO PHILIPPINES CORPORATION Project progress work #116 (Closed): [System Testing]Link with smart device and PHP web Data reference, graph creation, scan Kanban registration functions
- 12:05 DENSO PHILIPPINES CORPORATION Project progress work #115 (Closed): [System Testing]Link with smart device and PHP web Data reference, graph creation, scan Kanban registration functions
- 12:05 DENSO PHILIPPINES CORPORATION Project progress work #114 (Closed): [System Testing]Link with smart device and PHP web Data reference, graph creation, scan Kanban registration functions
- 12:04 DENSO PHILIPPINES CORPORATION Project progress work #113 (Closed): [Coding]PHP web Data reference, graph creation, scan Kanban registration functions Phase01
- 12:02 DENSO PHILIPPINES CORPORATION Project progress work #112 (Closed): [Coding]Android smart watch , smart phone , Data linkage function Phase01
- 12:01 DENSO PHILIPPINES CORPORATION Project progress work #111 (Closed): [Internal Design] DB and various functions, man-hour calculation
- 11:59 ASTEER (THAILAND) CO., LTD. Project progress work #110 (Closed): [On-site support]Support after cutover
- 11:59 ASTEER (THAILAND) CO., LTD. Project progress work #109 (Closed): [On-site support]Support after cutover
- 11:55 EBISU FOODS CO., LTD. Project progress work #108 (Closed): [Installation&On-site support]Project Warehouse management system for Ebisu
- 11:55 EBISU FOODS CO., LTD. Project progress work #107 (Closed): [Installation&On-site support]Project Warehouse management system for Ebisu
- 11:50 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #106 (Closed): [System Testing]ST with AS400
- 11:49 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #105 (Closed): [Coding]Data linkage function
- 11:47 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #104 (Closed): [Installation&On-site support]Project Stock management system for MAS-T
- 11:47 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #103 (Closed): [Installation&On-site support]Project Stock management system for MAS-T
- 11:47 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #102 (Closed): [Installation&On-site support]Project Stock management system for MAS-T
- 11:44 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #101 (Closed): [System Testing]Handyterminal and Web
- 11:43 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #100 (Closed): [System Testing]Handyterminal and Web
- 11:42 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #99 (Closed): [System Testing]Handyterminal and Web
- 11:42 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #98 (Closed): [Coding]PHP Pegasus web function
- 11:39 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #97 (Closed): [Coding]Android handyterminal BTA500
- 11:38 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #96 (Closed): [Internal Design] DB and various functions, man-hour calculation
- 11:35 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #95 (Closed): Support installation for power supply and LAN cable for 20 points
- Support installation for power supply and LAN cable for 20 points
- Control and coordinate between wiring or LAN ins... - 11:29 ACME INDUSTRY CO.,LTD. Project progress work #94 (Closed): [On-site support]Support after cutover
- 11:29 ACME INDUSTRY CO.,LTD. Project progress work #93 (Interruption): [On-site support]Support after cutover
- 11:28 ACME INDUSTRY CO.,LTD. Project progress work #92 (Closed): [On-site support]Support after cutover
18 Oct 2023
- 21:06 MURATA(THAILAND)CO.,LTD. Sales support #40 (In Progress): Install PTL System at OfficeMate Suvinthawong
- 21:04 MURATA(THAILAND)CO.,LTD. Sales support #40 (New): Install PTL System at OfficeMate Suvinthawong
- 20:51 MINEBEA ACCESSSOLUTIONS THAI LTD. 15.00 hours (Project progress work #10 (Closed): Creating a specification document)
- 20:43 A.N.I. LOGISTICS, LTD. Sales support #62 (In Progress): CKD project phase3 Proposal activities + requirements definition
- 18:57 A.N.I. LOGISTICS, LTD. Sales support #62 (Closed): CKD project phase3 Proposal activities + requirements definition
- CKD project phase3 Proposal activities + requirements definition
Schedule : Pre-kick off meeting with Mr.Sakamoto ... - 20:39 NISSAN MOTOR (THAILAND) CO., LTD. Problem-Bug #90 (Closed): Found the problem on HT02
- 20:37 NISSAN MOTOR (THAILAND) CO., LTD. Sales support #89 (Closed): New OCR project for Fac1 and Fac2
- Handy terminal and plc for keyence concept
We will get po at Mid-Dec - 20:34 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #88 (Closed): NSET - Compo detail (Add new slip)
- NSET - Compo detail (Add new slip)
Vietnamese will now test. - 20:33 THAI NIPPON FOODS CO., LTD. Project progress work #87 (Closed): IoT Equipment for machine operation project
- 20:31 THAI NIPPON FOODS CO., LTD. Sales support #86 (Closed): IoT Equipment for Water treatment project
- 20:14 VALEO COMFORT AND DRIVING ASSISTANCE SYSTEMS (THAILAND) LIMITED Project progress work #85 (Closed): Scanner-PLC Data Convert suggetion
- 20:13 NTN MANUFACTURING (THAILAND) CO., LTD. Sales support #84 (Closed): NTN - iReporter suggetion
- Recheck the form on tablet
Wait for P - 20:12 ACME INDUSTRY CO.,LTD. Sales support #83 (Closed): PJ - line monitoring assembly & PJ- Machine operation monitoring Molding line
- IoT project
PJ - line monitoring assembly & pj - Machine operation monitoring Molding line - 20:10 NTPT COMPANY LIMITED. Sales support #82 (Closed): NTPT - Warehouse system Proposal activities + requirements definition
- 20:09 NTPT COMPANY LIMITED. Sales support #81 (Closed): NTPT - Documentation management Proposal activities + requirements definition
- NTPT - Documentation management
Proposal activities + requirements definition - 20:08 TOMAS TECH CO., LTD. Sales support #80 (Closed): DPS operation training
- '- Application software
- Database structure
- Studying the SDMAT software (40%) - 20:06 SIAM DENSO MANUFACTURING CO., LTD. Sales support #79 (Closed): New line 23
- Waiting for PO
Already survey and estimate the price. - 20:06 SIAM DENSO MANUFACTURING CO., LTD. Problem-Bug #78 (Closed): Found problem about the alarm of sequnce
- Will enter site to solve the problem. 18th Nov
- 20:05 SIAM DENSO MANUFACTURING CO., LTD. Project progress work #77 (Closed): Data insertion test time
- K.Kamol is testing. Will confirm user for installation plan.
Waiting for file from user.
Will install after inserte... - 20:03 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Problem-Bug #76 (Closed): NSET - Reprint FG slip & Traceability system by Handy
- Found partail number exceed problem
Still can't reproduce the problem.
Add the logger in application and sent t... - 20:00 MAX(THAILAND)CO.,LTD. Problem-Bug #75 (Closed): Email function test
- 19:56 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.
- Request to add 2 access points on the low signal area.
Wiring is also need.
Request quote from SND - 19:54 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #73 (Closed): Found 500 return error
- Can't reproduce the problem
Increase the memory allocate for PHP to 1GB - 19:51 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #72 (Closed): Request the Windows server 2022 standard/ MSSQL2022 standard license
- Request the Windows server 2022 standard/ MSSQL2022 standard license
- 19:49 ATA CASTING TECHNOLOGY CO., LTD. Sales support #71 (In Progress): Machine operation monitoring
- Wait feedback from customer
- 19:49 ATA CASTING TECHNOLOGY CO., LTD. 10.00 hours (Sales support #71 (Closed): Machine operation monitoring)
- 19:48 ATA CASTING TECHNOLOGY CO., LTD. Sales support #71 (Closed): Machine operation monitoring
- 19:46 KANEKA (THAILAND) CO., LTD. Sales support #70 (In Progress): Kaneka - WMS pegasus Prepare quotation about M/A plan
- Wait for feedback from Kaneka
- 19:46 KANEKA (THAILAND) CO., LTD. 1.00 hour (Sales support #70 (Closed): Kaneka - WMS pegasus Prepare quotation about M/A plan)
- 19:45 KANEKA (THAILAND) CO., LTD. Sales support #70 (Closed): Kaneka - WMS pegasus Prepare quotation about M/A plan
- Send quote for Kaneka
- 19:44 SIAM TRIX MANUFACTURING CO.,LTD. Sales support #69 (In Progress): Trix - Production planning software
- Wait for Japanese person on this Friday 11Aug
- 19:43 SIAM TRIX MANUFACTURING CO.,LTD. Sales support #69 (Closed): Trix - Production planning software
- 19:42 UEDA PLASTIC (THAILAND) CO., LTD. Sales support #68 (Closed): User request to add the new function about stock check remaining
- 19:40 EBARA FOODS (THAILAND) CO., LTD. 10.00 hours (Sales support #61 (Closed): Proposal activities + proposal document creation)
- 18:54 EBARA FOODS (THAILAND) CO., LTD. Sales support #61 (Closed): Proposal activities + proposal document creation
- Production management system proposal activities.
Requires linkage with accounting system. - 19:38 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. 4.00 hours (Sales support #67 (Closed): Automatic label pasting machine Concept proposal)
- 19:37 PANASONIC AUTOMOTIVE SYSTEMS ASIA PACIFIC CO.,LTD. Sales support #67 (Closed): Automatic label pasting machine Concept proposal
- 19:34 DAIFUKU (THAILAND) LTD. Project progress work #66 (Closed): [Area3]Camera control system
- 19:33 DAIFUKU (THAILAND) LTD. Project progress work #65 (Closed): [Area2]Camera control system
- 19:32 DAIFUKU (THAILAND) LTD. Project progress work #64 (Closed): [Area1]Camera control system
- 19:27 ACME INDUSTRY CO.,LTD. Sales support #63 (Closed): IoT project Proposal activities + requirements definition
- 18:49 SHODENSHA (THAILAND) CO., LTD. Problem-Bug #60 (Closed): Procedure manual application development modifictaion problem
- 18:41 DENSO PHILIPPINES CORPORATION 16.00 hours (Project progress work #22 (Closed): Make specification document for project)
- 18:40 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #13 (Closed): Additional development of 4 screens
- 18:39 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Project progress work #14 (Closed): Develop 4 additional functions
- 18:39 SANKO MOLD AND PLASTICS (THAILAND) COMPANY LIMITED. Problem-Bug #15 (Closed): SMTP handy terminal system malfunction
- 18:38 TOMAS TECH CO., LTD. Project progress work #35 (In Progress): PLC alarm record and send to line notify
- please add source code file
- 18:37 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #37 (In Progress): UPS have problem
- This case is not yet closed.
Change the person in charge. We will take action by October 31st. - 18:35 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #41 (Closed): ์ New condition
17 Oct 2023
- 19:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Sales support #57 (Closed): Production IoT project requirements definition
- 19:56 ATA CASTING TECHNOLOGY CO., LTD. Problem-Bug #56 (Closed): Packing system no need scan pallet no
- Packing system no need scan pallet no
Also available in: Atom