36

31

1

Tomas Tech Co.,Ltd. - Project progress work #1213: Spec meeting Robot Palletiz... Project progress work #1213: Spec meeting Robot Palletizer (Kao)

Project: Tomas Tech Co.,Ltd.
Status: New
Start date: 15 Aug 2025
Due date: 01 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal
ATA Casting Technology Co., Ltd. - Project progress work #1218: [Requirements definition] Project progress work #1218: [Requirements definition]

Project: ATA Casting Technology Co., Ltd.
Status: New
Start date: 01 Sep 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal
ATA Casting Technology Co., Ltd. - Parent project #1217: [PJ250051] Change location ... Parent project #1217: [PJ250051] Change location SR1000 traceability NMT line for ATA 50%

Project: ATA Casting Technology Co., Ltd.
Status: In Progress
Start date: 01 Sep 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal

2

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1370: [Coding] Mix material Project progress work #1370: [Coding] Mix material

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 02 Sep 2025
Due date: 03 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
NIPPN (Thailand) Co.,Ltd. - Parent project #1290: [PJ250053] WIFI Wiring for ... Parent project #1290: [PJ250053] WIFI Wiring for NIPPN (Thailand) Co.,Ltd.

Project: NIPPN (Thailand) Co.,Ltd.
Status: In Progress
Start date: 02 Sep 2025
Due date:
Assignee: Nattapol Poeam
Priority: Normal

3

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1370: [Coding] Mix material Project progress work #1370: [Coding] Mix material

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 02 Sep 2025
Due date: 03 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2707: [Installation&On-site support] Project progress work #2707: [Installation&On-site support]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2706: [Coding] Project progress work #2706: [Coding]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2705: [Internal Design] Project progress work #2705: [Internal Design]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2704: [Requirement definition] Project progress work #2704: [Requirement definition]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Parent project #2703: [PJ250065] CKD system for L... Parent project #2703: [PJ250065] CKD system for Logistics Alliance (Thailand) CO.,LTD - CYLC 100%

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: In Progress
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2702: [Installation&On-site support] Project progress work #2702: [Installation&On-site support]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2701: [Coding] Project progress work #2701: [Coding]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2700: [Internal Design] Project progress work #2700: [Internal Design]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Project progress work #2699: [Requirement definition] Project progress work #2699: [Requirement definition]

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: New
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal
LOGISTICS ALLIANCE (THAILAND) CO.,LTD. - Parent project #2698: [PJ250064] CKD modification... Parent project #2698: [PJ250064] CKD modification function Scope: Development of SoW stock CKD end month

Project: LOGISTICS ALLIANCE (THAILAND) CO.,LTD.
Status: In Progress
Start date: 03 Sep 2025
Due date:
Assignee: Kittisak Isarapongporn
Priority: Normal

4

NIPPN (Thailand) Co.,Ltd. - Parent project #1656: [PJ250060] Hardware for NIP... Parent project #1656: [PJ250060] Hardware for NIPPN (Thailand) Co.,Ltd. 50%

Project: NIPPN (Thailand) Co.,Ltd.
Status: In Progress
Start date: 04 Sep 2025
Due date: 04 Sep 2025
Assignee: Ryo Nozaki
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1371: [Coding] Inbound WIP - Inj ... Project progress work #1371: [Coding] Inbound WIP - Inj & Press

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 04 Sep 2025
Due date: 08 Sep 2025
Assignee: Soraya Norasing
Priority: Normal

5

Tomas Tech Co.,Ltd. - Sales support #1229: Palletizer - Kao (Concept) Sales support #1229: Palletizer - Kao (Concept)

Project: Tomas Tech Co.,Ltd.
Status: New
Start date: 25 Aug 2025
Due date: 05 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal
Tomas Tech Co.,Ltd. - Project progress work #1223: [Requirement definition] Project progress work #1223: [Requirement definition]

Project: Tomas Tech Co.,Ltd.
Status: New
Start date: 18 Aug 2025
Due date: 05 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal
Tomas Tech Co.,Ltd. - Project progress work #1210: Standard for ME-Drawing Tem... Project progress work #1210: Standard for ME-Drawing Template / Parts list format

Project: Tomas Tech Co.,Ltd.
Status: New
Start date: 20 Aug 2025
Due date: 05 Sep 2025
Assignee: Warit Chunlaka
Priority: Normal
Tomas Tech Co.,Ltd. - Parent project #533: [PJ******]General and admin... Parent project #533: [PJ******]General and administrative expenses

Project: Tomas Tech Co.,Ltd.
Status: New
Start date: 02 Oct 2023
Due date: 05 Sep 2025
Assignee: Ryo Nozaki
Priority: Normal

6

FTS AUTOMOTIVE (THAILAND) CO.,LTD - Project progress work #1283: [Installation&On-site support] Project progress work #1283: [Installation&On-site support]

Project: FTS AUTOMOTIVE (THAILAND) CO.,LTD
Status: New
Start date: 06 Sep 2025
Due date: 01 Dec 2025
Assignee:
Priority: Normal
THAI MATTO NS CO.,LTD. - Project progress work #1166: [Coding] Schedule Project progress work #1166: [Coding] Schedule

Project: THAI MATTO NS CO.,LTD.
Status: In Progress
Start date: 06 Sep 2025
Due date: 16 Dec 2025
Assignee:
Priority: Normal
37

7

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1200: [Coding] Add new page Repor... Project progress work #1200: [Coding] Add new page Report delivery (monthly delivery report) Page

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 07 Sep 2025
Due date: 07 Sep 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal

8

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1371: [Coding] Inbound WIP - Inj ... Project progress work #1371: [Coding] Inbound WIP - Inj & Press

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 04 Sep 2025
Due date: 08 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
Asian Stanley. International Limited - Parent project #1244: [PJ250047] Process control ... Parent project #1244: [PJ250047] Process control system project modification report 10%

Project: Asian Stanley. International Limited
Status: In Progress
Start date: 25 Aug 2025
Due date: 08 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1201: [Coding] Add new Report sto... Project progress work #1201: [Coding] Add new Report stockcard (open,rec,issue,stock) Page

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 08 Sep 2025
Due date: 08 Sep 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal

9

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1372: [Coding] Outbound Purge mat... Project progress work #1372: [Coding] Outbound Purge material L3 - Assy & Inj & Press

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 09 Sep 2025
Due date: 10 Sep 2025
Assignee: Soraya Norasing
Priority: Normal

10

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1372: [Coding] Outbound Purge mat... Project progress work #1372: [Coding] Outbound Purge material L3 - Assy & Inj & Press

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 09 Sep 2025
Due date: 10 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3148: [Installation&On-site support] Project progress work #3148: [Installation&On-site support]

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 10 Sep 2025
Due date: 15 Dec 2025
Assignee: Kittisak Isarapongporn
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1202: [Coding] Purchase instructi... Project progress work #1202: [Coding] Purchase instructions 3 months change to 4 months

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 10 Sep 2025
Due date: 13 Sep 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal

11

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1373: [Coding] Return parts to WH Project progress work #1373: [Coding] Return parts to WH

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 11 Sep 2025
Due date: 13 Sep 2025
Assignee: Soraya Norasing
Priority: Normal

12

13

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1373: [Coding] Return parts to WH Project progress work #1373: [Coding] Return parts to WH

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 11 Sep 2025
Due date: 13 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1202: [Coding] Purchase instructi... Project progress work #1202: [Coding] Purchase instructions 3 months change to 4 months

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 10 Sep 2025
Due date: 13 Sep 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
38

14

NTPT Company Limited. - Project progress work #1298: [Requirement definition] Project progress work #1298: [Requirement definition]

Project: NTPT Company Limited.
Status: New
Start date: 25 Aug 2025
Due date: 14 Sep 2025
Assignee: Nattapol Poeam
Priority: Normal
AIKAI LOGISTICS (THAILAND) CO., LTD - Project progress work #1033: [Requirement definition] Project progress work #1033: [Requirement definition]

Project: AIKAI LOGISTICS (THAILAND) CO., LTD
Status: In Progress
Start date: 12 Jun 2025
Due date: 14 Sep 2025
Assignee: Anek Sanohkham
Priority: Normal

15

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1203: [Coding] Add new page Repor... Project progress work #1203: [Coding] Add new page Report QC Page

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 15 Sep 2025
Due date: 15 Sep 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1374: [Coding] Create label templ... Project progress work #1374: [Coding] Create label template for QC Type & Modify label template

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 15 Sep 2025
Due date: 16 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
NTPT Company Limited. - Project progress work #1303: [Coding] Project progress work #1303: [Coding]

Project: NTPT Company Limited.
Status: New
Start date: 15 Sep 2025
Due date: 05 Oct 2025
Assignee: Konlawat Saechee
Priority: Normal
NTPT Company Limited. - Project progress work #1302: [Coding] Project progress work #1302: [Coding]

Project: NTPT Company Limited.
Status: New
Start date: 15 Sep 2025
Due date: 05 Oct 2025
Assignee: Nattaporn Chaiya
Priority: Normal
NTPT Company Limited. - Project progress work #1300: [Coding] Project progress work #1300: [Coding]

Project: NTPT Company Limited.
Status: In Progress
Start date: 15 Sep 2025
Due date: 05 Oct 2025
Assignee: Suphawat Tinaso
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #1066: [Coding] Handy development Project progress work #1066: [Coding] Handy development

Project: A.N.I. LOGISTICS, LTD.
Status: In Progress
Start date: 15 Sep 2025
Due date: 16 Oct 2025
Assignee: Priroj Neamjarn
Priority: Normal

16

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1374: [Coding] Create label templ... Project progress work #1374: [Coding] Create label template for QC Type & Modify label template

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 15 Sep 2025
Due date: 16 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1366: [Coding] Software developme... Project progress work #1366: [Coding] Software development (Handy)

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 16 Jul 2025
Due date: 16 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1204: [Coding] Add Setting hide s... Project progress work #1204: [Coding] Add Setting hide show column (Stock Inquiry/Report, Stock Inventory Report)

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 16 Sep 2025
Due date: 17 Sep 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal

17

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1204: [Coding] Add Setting hide s... Project progress work #1204: [Coding] Add Setting hide show column (Stock Inquiry/Report, Stock Inventory Report)

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 16 Sep 2025
Due date: 17 Sep 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal

18

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1205: [Coding] Add Language menu ... Project progress work #1205: [Coding] Add Language menu english to japanese

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: In Progress
Start date: 18 Sep 2025
Due date: 19 Sep 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal

19

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1205: [Coding] Add Language menu ... Project progress work #1205: [Coding] Add Language menu english to japanese

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: In Progress
Start date: 18 Sep 2025
Due date: 19 Sep 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal

20

39

21

22

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1660: [Installation&On-site suppo... Project progress work #1660: [Installation&On-site support] Software installation

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 22 Sep 2025
Due date: 22 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1185: [Installation&On-site support] Project progress work #1185: [Installation&On-site support]

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 22 Sep 2025
Due date: 01 Oct 2025
Assignee: Soraya Norasing
Priority: Normal

23

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1661: [Installation&On-site suppo... Project progress work #1661: [Installation&On-site support] Teaching for UT

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 23 Sep 2025
Due date: 24 Sep 2025
Assignee: Soraya Norasing
Priority: Normal

24

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1661: [Installation&On-site suppo... Project progress work #1661: [Installation&On-site support] Teaching for UT

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 23 Sep 2025
Due date: 24 Sep 2025
Assignee: Soraya Norasing
Priority: Normal

25

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1662: [Installation&On-site suppo... Project progress work #1662: [Installation&On-site support] trainning User WH/Assy

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 25 Sep 2025
Due date: 25 Sep 2025
Assignee: Soraya Norasing
Priority: Normal

26

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1663: [Installation&On-site suppo... Project progress work #1663: [Installation&On-site support] trainning User Inj/Press

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 26 Sep 2025
Due date: 26 Sep 2025
Assignee: Soraya Norasing
Priority: Normal

27

NTPT Company Limited. - Project progress work #1304: [Installation&On-site support] Project progress work #1304: [Installation&On-site support]

Project: NTPT Company Limited.
Status: New
Start date: 27 Sep 2025
Due date:
Assignee:
Priority: Normal
40

28

29

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1665: [Installation&On-site suppo... Project progress work #1665: [Installation&On-site support] Supports user feedback

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 29 Sep 2025
Due date: 30 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1664: [Installation&On-site suppo... Project progress work #1664: [Installation&On-site support] User Testing & Trial

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 29 Sep 2025
Due date: 30 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
THAI INABA FOODS COMPANY LIMITED - Project progress work #1511: [Coding] QC Process Project progress work #1511: [Coding] QC Process

Project: THAI INABA FOODS COMPANY LIMITED
Status: In Progress
Start date: 29 Sep 2025
Due date: 09 Oct 2025
Assignee: Nattaporn Chaiya
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1199: [Coding] Gen pdf Assembly O... Project progress work #1199: [Coding] Gen pdf Assembly Order Sheet Report (Assy,Press,Inj)

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 29 Sep 2025
Due date: 06 Oct 2025
Assignee: Ronnagon Kongsuwan
Priority: Normal

30

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1665: [Installation&On-site suppo... Project progress work #1665: [Installation&On-site support] Supports user feedback

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 29 Sep 2025
Due date: 30 Sep 2025
Assignee: Soraya Norasing
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1664: [Installation&On-site suppo... Project progress work #1664: [Installation&On-site support] User Testing & Trial

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 29 Sep 2025
Due date: 30 Sep 2025
Assignee: Soraya Norasing
Priority: Normal

1

YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1667: [Installation&On-site suppo... Project progress work #1667: [Installation&On-site support] Go live

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 01 Oct 2025
Due date: 01 Oct 2025
Assignee: Soraya Norasing
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1666: [Installation&On-site suppo... Project progress work #1666: [Installation&On-site support] Teaching for Go live

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 01 Oct 2025
Due date: 01 Oct 2025
Assignee: Soraya Norasing
Priority: Normal
YAMATO ELECTRIC (THAILAND) CO.,LTD - Project progress work #1185: [Installation&On-site support] Project progress work #1185: [Installation&On-site support]

Project: YAMATO ELECTRIC (THAILAND) CO.,LTD
Status: Close request
Start date: 22 Sep 2025
Due date: 01 Oct 2025
Assignee: Soraya Norasing
Priority: Normal
Asian Stanley. International Limited - Parent project #3248: [PJ2500XX] Handy terminal P... Parent project #3248: [PJ2500XX] Handy terminal Process control system modification fee

Project: Asian Stanley. International Limited
Status: In Progress
Start date: 01 Oct 2025
Due date: 16 Mar 2026
Assignee: Soraya Norasing
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3072: [Coding] WS api and fronten... Project progress work #3072: [Coding] WS api and frontend script fixing

Project: A.N.I. LOGISTICS, LTD.
Status: New
Start date: 01 Oct 2025
Due date: 03 Dec 2025
Assignee:
Priority: Normal
A.N.I. LOGISTICS, LTD. - Project progress work #3054: [Coding] Handy UI Script Project progress work #3054: [Coding] Handy UI Script

Project: A.N.I. LOGISTICS, LTD.
Status: In Progress
Start date: 01 Oct 2025
Due date: 02 Dec 2025
Assignee: Tanong Amnuaypornsri
Priority: Normal

2

3

THAI MATTO NS CO.,LTD. - Project progress work #1601: [Installation&On-site suppo... Project progress work #1601: [Installation&On-site support]

Project: THAI MATTO NS CO.,LTD.
Status: New
Start date: 03 Oct 2025
Due date: 08 Feb 2026
Assignee: Kittisak Isarapongporn
Priority: Normal

4