Activity
From 11 Jun 2026 to 20 Jun 2026
12 Jun 2026
- 16:36 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #8545 (Closed): [Installation&On-site support] Onsite technical training.
- 16:35 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #8545 (Closed): [Installation&On-site support] Onsite technical training.
- 16:36 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #6543 (Closed): [Installation&On-site support] Design & Installation Line WA640
- 16:35 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #6528 (Closed): [Installation&On-site support] Installation Ethernet Module and back up program WA640/740 Line
- 16:33 THAI ASAHI DENSO CO., LTD. Project progress work #8544 (Closed): [Installation&On-site support] Onsite fix issue about Air Compressor is not working according to schedule.
- 16:33 THAI ASAHI DENSO CO., LTD. Project progress work #8544 (Closed): [Installation&On-site support] Onsite fix issue about Air Compressor is not working according to schedule.
- 16:32 THAI ASAHI DENSO CO., LTD. Project progress work #2726 (In Progress): [Installation&On-site support]
- 16:31 THAI ASAHI DENSO CO., LTD. Project progress work #8543 (Closed): [Coding] Fix issue about Air Compressor is not working according to schedule.
- 16:31 THAI ASAHI DENSO CO., LTD. Project progress work #8543 (Closed): [Coding] Fix issue about Air Compressor is not working according to schedule.
- 16:30 THAI ASAHI DENSO CO., LTD. Project progress work #2725 (In Progress): [Coding]
- 16:29 OKAYA (THAILAND) CO., LTD. (BANGNA BRANCH) Project progress work #8542 (Closed): [Coding] 2D Drawing for SR System Stand
- 16:29 OKAYA (THAILAND) CO., LTD. (BANGNA BRANCH) Project progress work #8542 (Closed): [Coding] 2D Drawing for SR System Stand
- 16:29 OKAYA (THAILAND) CO., LTD. (BANGNA BRANCH) Project progress work #8541 (Closed): [Coding] Concept 3D for SR System Stand
- 16:28 OKAYA (THAILAND) CO., LTD. (BANGNA BRANCH) Project progress work #8541 (Closed): [Coding] Concept 3D for SR System Stand
- 16:26 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8540 (Closed): [Internal Design] Design Review for Belt Conveyor B,G-Line
- 16:24 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8540 (Closed): [Internal Design] Design Review for Belt Conveyor B,G-Line
- 16:26 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8539 (Closed): [Internal Design] 2D Drawing for Belt Conveyor B,G-Line
- 16:23 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8539 (Closed): [Internal Design] 2D Drawing for Belt Conveyor B,G-Line
- 16:20 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8538 (Closed): [Installation&On-site support] Transport part slat U2 line to Tomas tech W/H
- 16:20 MITSUBISHI ELECTRIC CONSUMER PRODUCTS (THAILAND) CO., LTD. Project progress work #8538 (Closed): [Installation&On-site support] Transport part slat U2 line to Tomas tech W/H
- 16:18 OILES (THAILAND) CO., LTD. Project progress work #8537 (Closed): [Requirement definition] On site meeting for Machine Operation
- 16:18 OILES (THAILAND) CO., LTD. Project progress work #8537 (Closed): [Requirement definition] On site meeting for Machine Operation
- 16:15 LINE INSTRUMENT CO.,LTD. Project progress work #8536 (Closed): [Coding] PR- request for MOR (Mobile box)
- 16:14 LINE INSTRUMENT CO.,LTD. Project progress work #8536 (Closed): [Coding] PR- request for MOR (Mobile box)
- 16:14 LINE INSTRUMENT CO.,LTD. Project progress work #8535 (Closed): [Internal Design] Drawing and part list for MOR (Mobile box)
- 16:13 LINE INSTRUMENT CO.,LTD. Project progress work #8535 (Closed): [Internal Design] Drawing and part list for MOR (Mobile box)
- 16:14 LINE INSTRUMENT CO.,LTD. Project progress work #8534 (Closed): [Internal Design] Drawing confirm for MOR (Mobile box)
- 16:13 LINE INSTRUMENT CO.,LTD. Project progress work #8534 (Closed): [Internal Design] Drawing confirm for MOR (Mobile box)
- 16:12 LINE INSTRUMENT CO.,LTD. Project progress work #8533 (New): [Installation&On-site support]
- 16:12 LINE INSTRUMENT CO.,LTD. Project progress work #8532 (New): [Coding]
- 16:11 LINE INSTRUMENT CO.,LTD. Project progress work #8531 (New): [Internal Design]
- 16:11 LINE INSTRUMENT CO.,LTD. Project progress work #8530 (New): [Requirement definition]
- 14:07 MITSUI PRECISION THAI CO., LTD. Project progress work #8529 (Closed): [Coding] Modify Stock Report , Modify ProductionSchedule/ WorkOutbound, Modify web backend quantity handling to support 7 decimal.
- 14:07 MITSUI PRECISION THAI CO., LTD. Project progress work #8529 (Closed): [Coding] Modify Stock Report , Modify ProductionSchedule/ WorkOutbound, Modify web backend quantity handling to support 7 decimal.
- 14:05 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. Project progress work #8528 (Closed): [Coding] Add Kanban Name support to Stock Inquiry Report, Stock Maintenance, and Item Master for both CSV import and manual web input.
- 13:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. Project progress work #8528 (Closed): [Coding] Add Kanban Name support to Stock Inquiry Report, Stock Maintenance, and Item Master for both CSV import and manual web input.
- 13:48 MITSUI PRECISION THAI CO., LTD. Project progress work #8527 (Closed): [Requirement definition] Onsite meeting at Mitsui to review project progress and discuss remaining issues.
- 13:48 MITSUI PRECISION THAI CO., LTD. Project progress work #8527 (Closed): [Requirement definition] Onsite meeting at Mitsui to review project progress and discuss remaining issues.
- 13:46 TOYOTA BOSHOKU GATEWAY (THAILAND) CO.,LTD. Project progress work #8526 (Closed): [Requirement definition] Meeting to explain the overview of the designed WMS workflow for TBGT to the Vietnam Handy development team.
- 13:45 TOYOTA BOSHOKU GATEWAY (THAILAND) CO.,LTD. Project progress work #8526 (Closed): [Requirement definition] Meeting to explain the overview of the designed WMS workflow for TBGT to the Vietnam Handy development team.
- 13:44 TOYOTA BOSHOKU GATEWAY (THAILAND) CO.,LTD. Project progress work #8525 (Closed): [Coding] Develop Master Data Management Pages (Item Master, Supplier Master, Location Master, Department Master, User Master, User Credential, Packing Standard)
- 13:44 TOYOTA BOSHOKU GATEWAY (THAILAND) CO.,LTD. Project progress work #8525 (Closed): [Coding] Develop Master Data Management Pages (Item Master, Supplier Master, Location Master, Department Master, User Master, User Credential, Packing Standard)
- 13:16 SAMTECH (THAILAND) CO. LTD. Project progress work #8524 (Closed): [Coding] Receiving Manual
- 11:42 SAMTECH (THAILAND) CO. LTD. Project progress work #8524 (Closed): [Coding] Receiving Manual
- 13:16 SAMTECH (THAILAND) CO. LTD. Project progress work #8523 (Closed): [Coding] Receiving
- 11:40 SAMTECH (THAILAND) CO. LTD. Project progress work #8523 (Closed): [Coding] Receiving
- 11:33 SAMTECH (THAILAND) CO. LTD. Project progress work #8506 (Closed): [Coding] Add Customer Kanban Poka-Yoke 3-scan DO and Kanban and FG part match verify
- 11:06 SAMTECH (THAILAND) CO. LTD. Project progress work #8506 (Closed): [Coding] Add Customer Kanban Poka-Yoke 3-scan DO and Kanban and FG part match verify
- 11:33 SAMTECH (THAILAND) CO. LTD. Project progress work #8505 (Closed): [Coding] Add FG Delivery Menu and Delivery FG Outbound list and scan FG tags and confirm ship with validations
- 11:05 SAMTECH (THAILAND) CO. LTD. Project progress work #8505 (Closed): [Coding] Add FG Delivery Menu and Delivery FG Outbound list and scan FG tags and confirm ship with validations
- 11:33 SAMTECH (THAILAND) CO. LTD. Project progress work #8504 (Closed): [Coding] Add QA/QC WIP NC tag print no stock move
- 11:02 SAMTECH (THAILAND) CO. LTD. Project progress work #8504 (Closed): [Coding] Add QA/QC WIP NC tag print no stock move
- 11:32 SAMTECH (THAILAND) CO. LTD. Project progress work #8503 (Closed): [Coding] Add QA/QC Check Menu and FG re-grade scan tag and OK and NG and NC split and Outbound source and Inbound graded with validations
- 11:01 SAMTECH (THAILAND) CO. LTD. Project progress work #8503 (Closed): [Coding] Add QA/QC Check Menu and FG re-grade scan tag and OK and NG and NC split and Outbound source and Inbound graded with validations
- 11:32 SAMTECH (THAILAND) CO. LTD. Project progress work #8502 (Closed): [Coding] Add WIP Inspection scan inspection order and WIP tag match verify
- 11:00 SAMTECH (THAILAND) CO. LTD. Project progress work #8502 (Closed): [Coding] Add WIP Inspection scan inspection order and WIP tag match verify
- 11:32 SAMTECH (THAILAND) CO. LTD. Project progress work #8501 (Closed): [Coding] Add Inspection Menu and Inspection FG Inbound QTY OK and NG print and scan and confirm to FG stock with validations
- 11:00 SAMTECH (THAILAND) CO. LTD. Project progress work #8501 (Closed): [Coding] Add Inspection Menu and Inspection FG Inbound QTY OK and NG print and scan and confirm to FG stock with validations
- 11:32 SAMTECH (THAILAND) CO. LTD. Project progress work #8500 (Closed): [Coding] Add UI polish header and SweetAlert dialogs and dropdown icon and BAR display
- 10:59 SAMTECH (THAILAND) CO. LTD. Project progress work #8500 (Closed): [Coding] Add UI polish header and SweetAlert dialogs and dropdown icon and BAR display
- 11:32 SAMTECH (THAILAND) CO. LTD. Project progress work #8499 (Closed): [Coding] Add WIP Forging scan forging order and WIP tag match verify
- 10:58 SAMTECH (THAILAND) CO. LTD. Project progress work #8499 (Closed): [Coding] Add WIP Forging scan forging order and WIP tag match verify
- 11:32 SAMTECH (THAILAND) CO. LTD. Project progress work #8498 (Closed): [Coding] Add Forging Menu and Forging Outbound list and scan cutting tag and confirm issue
- 10:57 SAMTECH (THAILAND) CO. LTD. Project progress work #8498 (Closed): [Coding] Add Forging Menu and Forging Outbound list and scan cutting tag and confirm issue
- 11:31 SAMTECH (THAILAND) CO. LTD. Project progress work #8497 (Closed): [Coding] Add Cutting Inbound counter and NG print label and scan and confirm cut output to FG stock
- 10:56 SAMTECH (THAILAND) CO. LTD. Project progress work #8497 (Closed): [Coding] Add Cutting Inbound counter and NG print label and scan and confirm cut output to FG stock
- 11:31 SAMTECH (THAILAND) CO. LTD. Project progress work #8496 (Closed): [Coding] Add Production Menu and Cutting Menu and Cutting Poka-Yoke scan order and RM tag match verify
- 10:55 SAMTECH (THAILAND) CO. LTD. Project progress work #8496 (Closed): [Coding] Add Production Menu and Cutting Menu and Cutting Poka-Yoke scan order and RM tag match verify
- 11:31 SAMTECH (THAILAND) CO. LTD. Project progress work #8495 (Closed): [Coding] Add Manual Outbound scan tag and OK qty and location and confirm issue with validations
- 10:55 SAMTECH (THAILAND) CO. LTD. Project progress work #8495 (Closed): [Coding] Add Manual Outbound scan tag and OK qty and location and confirm issue with validations
- 11:30 SAMTECH (THAILAND) CO. LTD. Project progress work #8494 (Closed): [Coding] Add Manual Inbound RM item dropdown and manual entry and print label and scan to stock confirm
- 10:54 SAMTECH (THAILAND) CO. LTD. Project progress work #8494 (Closed): [Coding] Add Manual Inbound RM item dropdown and manual entry and print label and scan to stock confirm
- 11:30 SAMTECH (THAILAND) CO. LTD. Project progress work #8493 (Closed): [Coding] Add RM Outbound list and detail and scan tag issue confirm with validations
- 10:53 SAMTECH (THAILAND) CO. LTD. Project progress work #8493 (Closed): [Coding] Add RM Outbound list and detail and scan tag issue confirm with validations
- 11:30 SAMTECH (THAILAND) CO. LTD. Project progress work #8492 (Closed): [Coding] Add RM Inbound re-point to ProductionSchedule model and align DB wms-samtech2 to wms-samtech
- 10:52 SAMTECH (THAILAND) CO. LTD. Project progress work #8492 (Closed): [Coding] Add RM Inbound re-point to ProductionSchedule model and align DB wms-samtech2 to wms-samtech
- 11:29 SAMTECH (THAILAND) CO. LTD. Project progress work #8491 (Closed): [Coding] Add RM Inbound Print Label + Scan-to-stock Confirm + validations (plan→print→scan→stock)
- 10:52 SAMTECH (THAILAND) CO. LTD. Project progress work #8491 (Closed): [Coding] Add RM Inbound Print Label + Scan-to-stock Confirm + validations (plan→print→scan→stock)
- 11:29 SAMTECH (THAILAND) CO. LTD. Project progress work #8490 (Closed): [Coding] Add RM Inbound Job Note list + Material list (date/status/maker filter)
- 10:51 SAMTECH (THAILAND) CO. LTD. Project progress work #8490 (Closed): [Coding] Add RM Inbound Job Note list + Material list (date/status/maker filter)
- 11:25 SAMTECH (THAILAND) CO. LTD. Project progress work #8489 (Closed): [Coding] Add Main Menu + RM Materials sub-menu (R7 layout)
- 10:50 SAMTECH (THAILAND) CO. LTD. Project progress work #8489 (Closed): [Coding] Add Main Menu + RM Materials sub-menu (R7 layout)
- 11:25 SAMTECH (THAILAND) CO. LTD. Project progress work #8488 (Closed): [Coding] Add Login / Setting / Printer Setting (Menu 2.1) + search_users API
- 10:49 SAMTECH (THAILAND) CO. LTD. Project progress work #8488 (Closed): [Coding] Add Login / Setting / Printer Setting (Menu 2.1) + search_users API
- 11:25 SAMTECH (THAILAND) CO. LTD. Project progress work #8487 (Closed): [Coding] Setup Android Java + ht-base scaffold + PHP backend skeleton (samtech2/pegasus)
- 10:48 SAMTECH (THAILAND) CO. LTD. Project progress work #8487 (Closed): [Coding] Setup Android Java + ht-base scaffold + PHP backend skeleton (samtech2/pegasus)
- 11:24 SAMTECH (THAILAND) CO. LTD. Project progress work #8507 (Closed): [Coding] Add FG Return scan and qty and location and create return label to In-Store
- 11:06 SAMTECH (THAILAND) CO. LTD. Project progress work #8507 (Closed): [Coding] Add FG Return scan and qty and location and create return label to In-Store
- 11:24 SAMTECH (THAILAND) CO. LTD. Project progress work #8508 (Closed): [Coding] Add FG Repack combine tags and Outbound sources and new repack label with validations
- 11:07 SAMTECH (THAILAND) CO. LTD. Project progress work #8508 (Closed): [Coding] Add FG Repack combine tags and Outbound sources and new repack label with validations
- 11:24 SAMTECH (THAILAND) CO. LTD. Project progress work #8509 (Closed): [Coding] Add Stock Management Menu and Stock Check scan or part query stock rows and total
- 11:10 SAMTECH (THAILAND) CO. LTD. Project progress work #8509 (Closed): [Coding] Add Stock Management Menu and Stock Check scan or part query stock rows and total
- 11:24 SAMTECH (THAILAND) CO. LTD. Project progress work #8510 (Closed): [Coding] Add Change Location scan tag and move qty and new location full and partial split
- 11:11 SAMTECH (THAILAND) CO. LTD. Project progress work #8510 (Closed): [Coding] Add Change Location scan tag and move qty and new location full and partial split
- 11:23 SAMTECH (THAILAND) CO. LTD. Project progress work #8511 (Closed): [Coding] Add Stock Taking record state machine per lead Stocktaking table and trigger
- 11:12 SAMTECH (THAILAND) CO. LTD. Project progress work #8511 (Closed): [Coding] Add Stock Taking record state machine per lead Stocktaking table and trigger
- 11:23 SAMTECH (THAILAND) CO. LTD. Project progress work #8512 (Closed): [Coding] Add Reprint scan tag and reprint label print count
- 11:13 SAMTECH (THAILAND) CO. LTD. Project progress work #8512 (Closed): [Coding] Add Reprint scan tag and reprint label print count
- 11:23 SAMTECH (THAILAND) CO. LTD. Project progress work #8513 (Closed): [Coding] Add role-based UI split Production and Spare Part via Users.homepage at login
- 11:14 SAMTECH (THAILAND) CO. LTD. Project progress work #8513 (Closed): [Coding] Add role-based UI split Production and Spare Part via Users.homepage at login
- 11:23 SAMTECH (THAILAND) CO. LTD. Project progress work #8514 (Closed): [Coding] Add Spare Part Main Menu and sub-menu tree Inbound and Outbound and Stock Management
- 11:15 SAMTECH (THAILAND) CO. LTD. Project progress work #8514 (Closed): [Coding] Add Spare Part Main Menu and sub-menu tree Inbound and Outbound and Stock Management
- 11:23 SAMTECH (THAILAND) CO. LTD. Project progress work #8515 (Closed): [Coding] Add Spare Part Inbound Receive list and detail and print or confirm with PRO and EQP branch and validations
- 11:16 SAMTECH (THAILAND) CO. LTD. Project progress work #8515 (Closed): [Coding] Add Spare Part Inbound Receive list and detail and print or confirm with PRO and EQP branch and validations
- 11:23 SAMTECH (THAILAND) CO. LTD. Project progress work #8516 (Closed): [Coding] Add Spare Part Manual Receive item dropdown and PRO and EQP branch and confirm without schedule
- 11:17 SAMTECH (THAILAND) CO. LTD. Project progress work #8516 (Closed): [Coding] Add Spare Part Manual Receive item dropdown and PRO and EQP branch and confirm without schedule
- 11:23 SAMTECH (THAILAND) CO. LTD. Project progress work #8517 (Closed): [Coding] Add Spare Part Stock Out scan tag and qty and location and department and confirm issue with validations
- 11:18 SAMTECH (THAILAND) CO. LTD. Project progress work #8517 (Closed): [Coding] Add Spare Part Stock Out scan tag and qty and location and department and confirm issue with validations
- 11:22 SAMTECH (THAILAND) CO. LTD. Project progress work #8518 (Closed): [Coding] Add Spare Part Scrap print pre-scrap tag and scan confirm scrap with validations
- 11:18 SAMTECH (THAILAND) CO. LTD. Project progress work #8518 (Closed): [Coding] Add Spare Part Scrap print pre-scrap tag and scan confirm scrap with validations
- 11:22 SAMTECH (THAILAND) CO. LTD. Project progress work #8519 (Closed): [Coding] Add Spare Part Return scan stocked-out tag and return qty to storage with validations
- 11:19 SAMTECH (THAILAND) CO. LTD. Project progress work #8519 (Closed): [Coding] Add Spare Part Return scan stocked-out tag and return qty to storage with validations
- 11:22 SAMTECH (THAILAND) CO. LTD. Project progress work #8520 (Closed): [Coding] Add Spare Part Split Tag scan tag and split qty and label qty into multiple tags with validations
- 11:19 SAMTECH (THAILAND) CO. LTD. Project progress work #8520 (Closed): [Coding] Add Spare Part Split Tag scan tag and split qty and label qty into multiple tags with validations
- 11:22 SAMTECH (THAILAND) CO. LTD. Project progress work #8521 (Closed): [Coding] Add Spare Part Stock Management Change Location and Stock Check reuse Production
- 11:20 SAMTECH (THAILAND) CO. LTD. Project progress work #8521 (Closed): [Coding] Add Spare Part Stock Management Change Location and Stock Check reuse Production
- 11:22 SAMTECH (THAILAND) CO. LTD. Project progress work #8522 (Closed): [Coding] Add Mitsui-style table format across all column tables header cells and alternating row columns
- 11:22 SAMTECH (THAILAND) CO. LTD. Project progress work #8522 (Closed): [Coding] Add Mitsui-style table format across all column tables header cells and alternating row columns
- 10:42 THAI MATTO NS CO., LTD. Project progress work #8470 (Closed): [Coding] Fix WS Verification status to use range only, status is OK when actual weight is within min and max regardless of tare value
- 10:17 THAI MATTO NS CO., LTD. Project progress work #8470 (Closed): [Coding] Fix WS Verification status to use range only, status is OK when actual weight is within min and max regardless of tare value
- 10:42 THAI MATTO NS CO., LTD. Project progress work #8471 (Closed): [Coding] Implement SETUP/RECORD form input patterns in Blending and Extruding Process, range X-Y as labeled inputs and slash values as spinner dropdown in border box and single values prefill or hint
- 10:18 THAI MATTO NS CO., LTD. Project progress work #8471 (Closed): [Coding] Implement SETUP/RECORD form input patterns in Blending and Extruding Process, range X-Y as labeled inputs and slash values as spinner dropdown in border box and single values prefill or hint
- 10:40 THAI MATTO NS CO., LTD. Project progress work #8472 (Closed): [Coding] Change Pigment weight display to 4 decimal places
- 10:19 THAI MATTO NS CO., LTD. Project progress work #8472 (Closed): [Coding] Change Pigment weight display to 4 decimal places
- 10:40 THAI MATTO NS CO., LTD. Project progress work #8473 (Closed): [Coding] Add Grade and Color rows on top of every PO list item across all PO list screens with row order Grade Color Lot PO
- 10:20 THAI MATTO NS CO., LTD. Project progress work #8473 (Closed): [Coding] Add Grade and Color rows on top of every PO list item across all PO list screens with row order Grade Color Lot PO
- 10:40 THAI MATTO NS CO., LTD. Project progress work #8474 (Closed): [Coding] Replace PO No filter with LINE filter on every PO list screen
- 10:21 THAI MATTO NS CO., LTD. Project progress work #8474 (Closed): [Coding] Replace PO No filter with LINE filter on every PO list screen
- 10:40 THAI MATTO NS CO., LTD. Project progress work #8475 (Closed): [Coding] Fix OCR Scanner to accept 1-digit checkpoint values
- 10:22 THAI MATTO NS CO., LTD. Project progress work #8475 (Closed): [Coding] Fix OCR Scanner to accept 1-digit checkpoint values
- 10:40 THAI MATTO NS CO., LTD. Project progress work #8476 (Closed): [Coding] Fix OCR long-text scan broken
- 10:23 THAI MATTO NS CO., LTD. Project progress work #8476 (Closed): [Coding] Fix OCR long-text scan broken
- 10:39 THAI MATTO NS CO., LTD. Project progress work #8477 (Closed): [Coding] Fix RM Receive duplicate-row collision when 2 schedule rows share same part_no and lot_no by distinguishing via ref_sch_id
- 10:24 THAI MATTO NS CO., LTD. Project progress work #8477 (Closed): [Coding] Fix RM Receive duplicate-row collision when 2 schedule rows share same part_no and lot_no by distinguishing via ref_sch_id
- 10:39 THAI MATTO NS CO., LTD. Project progress work #8478 (Closed): [Coding] Fix CONFIRM_BAG silent failure caused by LabelStatus.remark_2 VARCHAR 200 truncation when bag has 5+ pigment ingredients
- 10:25 THAI MATTO NS CO., LTD. Project progress work #8478 (Closed): [Coding] Fix CONFIRM_BAG silent failure caused by LabelStatus.remark_2 VARCHAR 200 truncation when bag has 5+ pigment ingredients
- 10:39 THAI MATTO NS CO., LTD. Project progress work #8479 (Closed): [Coding] ALTER LabelStatus.remark_2 from VARCHAR 200 to VARCHAR 2000 on prod and staging
- 10:26 THAI MATTO NS CO., LTD. Project progress work #8479 (Closed): [Coding] ALTER LabelStatus.remark_2 from VARCHAR 200 to VARCHAR 2000 on prod and staging
- 10:39 THAI MATTO NS CO., LTD. Project progress work #8480 (Closed): [Coding] Fix Outbound Blend Invalid Format toast when scanning Pigment Weighting label_id only QR by adding 1-token and 7-token handlers
- 10:27 THAI MATTO NS CO., LTD. Project progress work #8480 (Closed): [Coding] Fix Outbound Blend Invalid Format toast when scanning Pigment Weighting label_id only QR by adding 1-token and 7-token handlers
- 10:39 THAI MATTO NS CO., LTD. Project progress work #8481 (Closed): [Coding] Add ref_sch_id JOIN ProductionSchedule to LABEL/DETAIL returning ref_sch_lot_no so PDA matches listItem by blend lot instead of supplier lot
- 10:29 THAI MATTO NS CO., LTD. Project progress work #8481 (Closed): [Coding] Add ref_sch_id JOIN ProductionSchedule to LABEL/DETAIL returning ref_sch_lot_no so PDA matches listItem by blend lot instead of supplier lot
- 10:38 THAI MATTO NS CO., LTD. Project progress work #8482 (Closed): [Coding] Fix Outbound Per Blend Invalid QR code format error by adding 1-token label_id handler before existing 7 and 10 token branch
- 10:30 THAI MATTO NS CO., LTD. Project progress work #8482 (Closed): [Coding] Fix Outbound Per Blend Invalid QR code format error by adding 1-token label_id handler before existing 7 and 10 token branch
- 10:38 THAI MATTO NS CO., LTD. Project progress work #8483 (Closed): [Coding] Fix Outbound Per Blend inverted status check from status != 3 to status != 2 to accept In Stock labels and reject Already Outbound
- 10:31 THAI MATTO NS CO., LTD. Project progress work #8483 (Closed): [Coding] Fix Outbound Per Blend inverted status check from status != 3 to status != 2 to accept In Stock labels and reject Already Outbound
- 10:38 THAI MATTO NS CO., LTD. Project progress work #8484 (Closed): [Coding] Hid Grade/Color rows on RM Receive screen only via visibility toggle, keeping the shared main_job_item layout intact for other screens
- 10:32 THAI MATTO NS CO., LTD. Project progress work #8484 (Closed): [Coding] Hid Grade/Color rows on RM Receive screen only via visibility toggle, keeping the shared main_job_item layout intact for other screens
- 10:38 THAI MATTO NS CO., LTD. Project progress work #8485 (Closed): [Coding] Fix Outbound Blend label_id-only scan reading status/value from ext instead of response top level
- 10:37 THAI MATTO NS CO., LTD. Project progress work #8485 (Closed): [Coding] Fix Outbound Blend label_id-only scan reading status/value from ext instead of response top level
- 10:38 THAI MATTO NS CO., LTD. Project progress work #8486 (Closed): [Coding] Restored A4 pallet-label print 3 per page on Picking resin and pigment by reverting the v1.0.9 removal, reusing TagLabelGrouper and RAW_MATERIAL_TAG print
- 10:38 THAI MATTO NS CO., LTD. Project progress work #8486 (Closed): [Coding] Restored A4 pallet-label print 3 per page on Picking resin and pigment by reverting the v1.0.9 removal, reusing TagLabelGrouper and RAW_MATERIAL_TAG print
- 10:16 THAI MATTO NS CO., LTD. Project progress work #8469 (New): [Coding]
- 10:15 THAI MATTO NS CO., LTD. Project progress work #1581 (Closed): [Coding] Handy development
- 10:15 THAI MATTO NS CO., LTD. Project progress work #6480 (Closed): [Coding] Stamping
- 10:15 THAI MATTO NS CO., LTD. Project progress work #6479 (Closed): [Coding] Blender Pokayoke
- 10:14 THAI MATTO NS CO., LTD. Project progress work #6478 (Closed): [Coding] WS client
- 10:14 THAI MATTO NS CO., LTD. Project progress work #3387 (Closed): [Coding] Process control
- 10:14 THAI MATTO NS CO., LTD. Project progress work #3386 (Closed): [Coding] WH/Picking Plan(Others) FIX
- 10:14 THAI MATTO NS CO., LTD. Project progress work #3385 (Closed): [Coding] WH/Picking Plan(Packaging) FIX
- 10:13 THAI MATTO NS CO., LTD. Project progress work #3384 (Closed): [Coding] WH/Picking Plan(Pigment/Additive) FIX
- 10:13 THAI MATTO NS CO., LTD. Project progress work #3383 (Closed): [Coding] WH/Picking Plan(Resin) FIX
- 10:13 THAI MATTO NS CO., LTD. Project progress work #3286 (Closed): [Coding] Injection
- 10:13 THAI MATTO NS CO., LTD. Project progress work #2804 (Closed): [Coding] Delivery
- 10:13 THAI MATTO NS CO., LTD. Project progress work #2803 (Closed): [Coding] Packing
- 10:12 THAI MATTO NS CO., LTD. Project progress work #2802 (Closed): [Coding] Extruding WIP Return
- 10:12 THAI MATTO NS CO., LTD. Project progress work #2801 (Closed): [Coding] Blender RM Return
- 10:12 THAI MATTO NS CO., LTD. Project progress work #2800 (Closed): [Coding] Blender Data Record
- 10:12 THAI MATTO NS CO., LTD. Project progress work #2799 (Closed): [Coding] Blender Preparation Record
- 10:12 THAI MATTO NS CO., LTD. Project progress work #2798 (Closed): [Coding] Blender Process
- 10:12 THAI MATTO NS CO., LTD. Project progress work #2797 (Closed): [Coding] Pre-Blend
- 10:06 THAI MATTO NS CO., LTD. Project progress work #1555 (Closed): [Coding] Master management
- 10:06 THAI MATTO NS CO., LTD. Project progress work #2796 (Closed): [Coding] OM-Mixer
- 10:06 THAI MATTO NS CO., LTD. Project progress work #2795 (Closed): [Coding] Extruding Process
- 10:06 THAI MATTO NS CO., LTD. Project progress work #2693 (Closed): [Coding] WH/Picking Plan(Others)
- 10:06 THAI MATTO NS CO., LTD. Project progress work #2690 (Closed): [Coding] WH/Picking Plan(Resin)
- 10:05 THAI MATTO NS CO., LTD. Project progress work #1681 (Closed): [Coding] Weighing
- 10:05 THAI MATTO NS CO., LTD. Project progress work #1680 (Closed): [Coding] Weighing Receiving
- 10:05 THAI MATTO NS CO., LTD. Project progress work #1593 (Closed): [Coding] Extruding/Data Record
- 10:05 THAI MATTO NS CO., LTD. Project progress work #1588 (Closed): [Coding] WH/Picking Plan (Packaging)
- 10:05 THAI MATTO NS CO., LTD. Project progress work #1587 (Closed): [Coding] Weighing API
- 10:04 THAI MATTO NS CO., LTD. Project progress work #1586 (Closed): [Coding] WH/Picking Plan (Pigment/Additive)
- 10:04 THAI MATTO NS CO., LTD. Project progress work #3381 (Closed): [Coding] Color matching Backend
- 10:04 THAI MATTO NS CO., LTD. Project progress work #3380 (Closed): [Coding] Color matching Frontend
- 10:03 THAI MATTO NS CO., LTD. Project progress work #1580 (Closed): [Coding] BOM Designer and Revision control
- 10:02 THAI MATTO NS CO., LTD. Project progress work #1561 (Closed): [Coding] MRP Factory master
- 10:02 THAI MATTO NS CO., LTD. Project progress work #1546 (Closed): [Coding] Stock management
- 10:02 THAI MATTO NS CO., LTD. Project progress work #1706 (Closed): [Coding] Dashboard report – Production monitoring
- 10:01 THAI MATTO NS CO., LTD. Project progress work #1705 (Closed): [Coding] Label Generate
- 10:01 THAI MATTO NS CO., LTD. Project progress work #1537 (Closed): [Coding] Outbound
- 10:01 THAI MATTO NS CO., LTD. Project progress work #3378 (Closed): [Coding] Outbound Schedule Detail FIX
- 10:00 THAI MATTO NS CO., LTD. Project progress work #1530 (Closed): [Coding] Inbound
- 10:00 THAI MATTO NS CO., LTD. Project progress work #3377 (Closed): [Codin] Inbound Schedule Detail Fix
- 09:59 THAI MATTO NS CO., LTD. Project progress work #1166 (Closed): [Coding] Schedule
- 09:59 THAI MATTO NS CO., LTD. Project progress work #6999 (Closed): [Coding] Blender, extrudig return
- 09:59 THAI MATTO NS CO., LTD. Project progress work #2997 (Closed): [Coding] Production Planning (Work Instruction Sheet)
- 09:59 THAI MATTO NS CO., LTD. Project progress work #2884 (Closed): [Coding] Production Schedule - Backend
- 09:59 THAI MATTO NS CO., LTD. Project progress work #2806 (Closed): [Coding] NCR