14 Oct 2025

17:04 A.N.I. LOGISTICS, LTD. Project progress work #1483 (In Progress): [Coding] OCR - IV
today
-Create UI and Socket for IV process
tomorrow
-Create UI and Socket for IV process
Priroj Neamjarn

10 Oct 2025

17:11 A.N.I. LOGISTICS, LTD. Project progress work #1483: [Coding] OCR - IV
today
-Create UI and Socket for IV process
tomorrow
-Create UI and Socket for IV process
Priroj Neamjarn
09:08 NIPPN (Thailand) Co.,Ltd. Project progress work #1686 (In Progress): [Coding] Delivery Planning
Siriwilai Chaiwattanaphon

09 Oct 2025

17:28 A.N.I. LOGISTICS, LTD. Project progress work #1482: [Coding] ANI, Web Socket Q-Point Inner packing
today
-Coding Socket API
tomorrow
-Coding Socket API
Priroj Neamjarn
15:24 NIPPN (Thailand) Co.,Ltd. Project progress work #1527 (In Progress): [Coding] Inbound schedule RM
Siriwilai Chaiwattanaphon
15:24 NIPPN (Thailand) Co.,Ltd. Project progress work #902 (In Progress): [Documentation] Get requirements of project
Siriwilai Chaiwattanaphon
15:24 NIPPN (Thailand) Co.,Ltd. Project progress work #1684 (In Progress): [Coding] TippingPlace
Siriwilai Chaiwattanaphon
14:52 NIPPN (Thailand) Co.,Ltd. Project progress work #1684 (Closed): [Coding] TippingPlace
Siriwilai Chaiwattanaphon
15:23 NIPPN (Thailand) Co.,Ltd. Project progress work #1608 (In Progress): [Coding] Login , Menu and others
Siriwilai Chaiwattanaphon
15:08 NIPPN (Thailand) Co.,Ltd. Project progress work #1686 (Closed): [Coding] Delivery Planning
Siriwilai Chaiwattanaphon
15:05 NIPPN (Thailand) Co.,Ltd. Project progress work #1514 (In Progress): [Coding] Issues Blending formula sheet
Siriwilai Chaiwattanaphon
15:05 NIPPN (Thailand) Co.,Ltd. Project progress work #1513 (In Progress): [Coding] RM Requistion sheet &schedule
Siriwilai Chaiwattanaphon
15:04 NIPPN (Thailand) Co.,Ltd. Project progress work #1512 (In Progress): [Coding] Picking/FG/Delivery Schedule Generate
Siriwilai Chaiwattanaphon
14:57 NIPPN (Thailand) Co.,Ltd. Project progress work #1685 (In Progress): [Coding] MRP - PO Material Request
Siriwilai Chaiwattanaphon
14:57 NIPPN (Thailand) Co.,Ltd. Project progress work #1685 (Closed): [Coding] MRP - PO Material Request
Siriwilai Chaiwattanaphon
12:00 THAI MATTO NS CO.,LTD. Project progress work #1681 (New): [Coding] Weighing
Siriwilai Chaiwattanaphon
11:59 THAI MATTO NS CO.,LTD. Project progress work #1680 (Closed): [Coding] Weighing Receiving
Siriwilai Chaiwattanaphon
11:57 THAI MATTO NS CO.,LTD. Project progress work #1678 (Closed): [Coding] Stock Management
Siriwilai Chaiwattanaphon
11:39 THAI MATTO NS CO.,LTD. Project progress work #1675 (In Progress): [Coding] inbound Schedule Material
Siriwilai Chaiwattanaphon
11:39 THAI MATTO NS CO.,LTD. Project progress work #1675 (Closed): [Coding] inbound Schedule Material
Siriwilai Chaiwattanaphon

08 Oct 2025

17:22 A.N.I. LOGISTICS, LTD. Project progress work #1482: [Coding] ANI, Web Socket Q-Point Inner packing
today
-Coding Socket API
tomorrow
-Coding Socket API
Priroj Neamjarn

07 Oct 2025

17:15 A.N.I. LOGISTICS, LTD. Project progress work #1066: [Coding] Handy development
today
-Create Process check q-point check inner packing Trim (SOCKET)
tomorrow
-Create Process check q-point check...
Priroj Neamjarn

06 Oct 2025

17:12 A.N.I. LOGISTICS, LTD. Project progress work #1481: [Coding] ANI,OCR Handy QGate Check
today
-Coding Socket Q-Gate Q-check-point for panel
Priroj Neamjarn
15:49 Asian Stanley. International Limited Project progress work #1674 (Close request): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
15:46 Asian Stanley. International Limited Project progress work #1674 (Closed): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
15:49 Asian Stanley. International Limited Project progress work #1673 (Close request): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
15:40 Asian Stanley. International Limited Project progress work #1673 (Closed): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
15:48 Asian Stanley. International Limited Project progress work #1672 (Close request): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
15:33 Asian Stanley. International Limited Project progress work #1672 (Closed): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
15:48 Asian Stanley. International Limited Project progress work #1671 (Close request): [Installation&On-site support] User Testing & Trial
Siriwilai Chaiwattanaphon
15:29 Asian Stanley. International Limited Project progress work #1671 (Closed): [Installation&On-site support] User Testing & Trial
Siriwilai Chaiwattanaphon
15:48 Asian Stanley. International Limited Project progress work #1670 (Close request): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
15:24 Asian Stanley. International Limited Project progress work #1670 (Closed): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
15:48 Asian Stanley. International Limited Project progress work #1669 (Close request): [Installation&On-site support] Hardware installation
Siriwilai Chaiwattanaphon
15:23 Asian Stanley. International Limited Project progress work #1669 (Closed): [Installation&On-site support] Hardware installation
Siriwilai Chaiwattanaphon
15:48 Asian Stanley. International Limited Project progress work #1668 (Close request): [Installation&On-site support] Software installation
Siriwilai Chaiwattanaphon
15:19 Asian Stanley. International Limited Project progress work #1668 (Closed): [Installation&On-site support] Software installation
Siriwilai Chaiwattanaphon
15:12 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1205 (In Progress): [Coding] Add Language menu english to japanese
Siriwilai Chaiwattanaphon
15:12 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1185 (Close request): [Installation&On-site support]
Siriwilai Chaiwattanaphon
15:11 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1667 (Close request): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1667 (Close request): [Installation&On-site support] Go live
Siriwilai Chaiwattanaphon
15:11 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1666 (Close request): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
15:08 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1666 (Close request): [Installation&On-site support] Teaching for Go live
Siriwilai Chaiwattanaphon
15:11 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1665 (Close request): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
15:07 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1665 (Close request): [Installation&On-site support] Supports user feedback
Siriwilai Chaiwattanaphon
15:11 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1664 (Close request): [Installation&On-site support] User Testing & Trial
Siriwilai Chaiwattanaphon
15:04 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1664 (Close request): [Installation&On-site support] User Testing & Trial
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1663 (Close request): [Installation&On-site support] trainning User Inj/Press
Siriwilai Chaiwattanaphon
15:00 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1663 (Close request): [Installation&On-site support] trainning User Inj/Press
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1662 (Close request): [Installation&On-site support] trainning User WH/Assy
Siriwilai Chaiwattanaphon
14:55 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1662 (Close request): [Installation&On-site support] trainning User WH/Assy
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1661 (Close request): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
14:53 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1661 (Close request): [Installation&On-site support] Teaching for UT
Siriwilai Chaiwattanaphon
15:10 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1660 (Close request): [Installation&On-site support] Software installation
Siriwilai Chaiwattanaphon
14:51 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1660 (Close request): [Installation&On-site support] Software installation
Siriwilai Chaiwattanaphon
14:58 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1366 (Close request): [Coding] Software development (Handy)
Siriwilai Chaiwattanaphon
14:49 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1204 (Close request): [Coding] Add Setting hide show column (Stock Inquiry/Report, Stock Inventory Report)
Siriwilai Chaiwattanaphon
14:45 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1203 (Close request): [Coding] Add new page Report QC Page
Siriwilai Chaiwattanaphon
14:45 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1202 (Close request): [Coding] Purchase instructions 3 months change to 4 months
Siriwilai Chaiwattanaphon
14:45 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1201 (Close request): [Coding] Add new Report stockcard (open,rec,issue,stock) Page
Siriwilai Chaiwattanaphon
14:45 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1200 (Close request): [Coding] Add new page Report delivery (monthly delivery report) Page
Siriwilai Chaiwattanaphon
14:44 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1199 (Close request): [Coding] Gen pdf Assembly Order Sheet Report (Assy,Press,Inj)
Siriwilai Chaiwattanaphon
14:44 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1198 (Close request): [Coding] Add new page & Implement QC process for production (Assy, Inj, Press)
Siriwilai Chaiwattanaphon
14:43 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1197 (Close request): [Coding] Modify generate production schedule
Siriwilai Chaiwattanaphon
14:43 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1196 (Close request): [Coding] Add new page master data ng detail
Siriwilai Chaiwattanaphon
14:42 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1195 (Close request): [Coding] Add new page Schedule QC material
Siriwilai Chaiwattanaphon
14:42 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1184 (In Progress): [Coding] Software development (Web)
Siriwilai Chaiwattanaphon
14:37 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1194 (Close request): [Coding] Implement QC process for purchase orders (Po, Pr) *wait AQL data
Siriwilai Chaiwattanaphon
14:37 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1193 (Close request): [Coding] Add new page Report warehouse (monthly inventory report) Page
Siriwilai Chaiwattanaphon
14:34 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1192 (Close request): [Coding] Add new page Report delivery (weekly delivery report) Page
Siriwilai Chaiwattanaphon
14:34 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1191 (Close request): [Coding] Add new master data page (machine)
Siriwilai Chaiwattanaphon
14:33 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1190 (Close request): [Coding] Add new master data page (line)
Siriwilai Chaiwattanaphon
14:31 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1189 (Close request): [Coding] Search by part_name on page (stock inventory report) Search By part_name page stock_inquiry_report
Siriwilai Chaiwattanaphon
14:31 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1188 (Close request): [Coding] Import schedule production (assy, press, inj) and delivery for 1 months to 4 months
Siriwilai Chaiwattanaphon
14:29 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1370 (Close request): [Coding] Mix material
Siriwilai Chaiwattanaphon
14:29 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1371 (Close request): [Coding] Inbound WIP - Inj & Press
Siriwilai Chaiwattanaphon
14:29 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1372 (Close request): [Coding] Outbound Purge material L3 - Assy & Inj & Press
Siriwilai Chaiwattanaphon
14:29 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1373 (Close request): [Coding] Return parts to WH
Siriwilai Chaiwattanaphon
14:29 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1374 (Close request): [Coding] Create label template for QC Type & Modify label template
Siriwilai Chaiwattanaphon
14:28 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1369 (Close request): [Coding] Inbound FG - Assy
Siriwilai Chaiwattanaphon
14:28 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1368 (Close request): [Coding] Confirm material before production
Siriwilai Chaiwattanaphon
14:28 YAMATO ELECTRIC (THAILAND) CO.,LTD Project progress work #1367 (Close request): [Coding] Inbound Material - WH
Siriwilai Chaiwattanaphon
14:03 Asian Stanley. International Limited Project progress work #1087 (Close request): [Installation&On-site support] Classify
Siriwilai Chaiwattanaphon
13:58 Asian Stanley. International Limited Project progress work #1379 (Close request): [Coding] Modify Api for link servers
Siriwilai Chaiwattanaphon
13:57 Asian Stanley. International Limited Project progress work #1378 (Close request): [Coding] Template Label
Siriwilai Chaiwattanaphon
13:57 Asian Stanley. International Limited Project progress work #1377 (Close request): [Coding] Modify Taping label on handy
Siriwilai Chaiwattanaphon
13:57 Asian Stanley. International Limited Project progress work #1376 (Close request): [Coding] Label print of classify
Siriwilai Chaiwattanaphon
13:57 Asian Stanley. International Limited Project progress work #1375 (Close request): [Coding] Modify classify function
Siriwilai Chaiwattanaphon
13:57 Asian Stanley. International Limited Project progress work #1086 (Close request): [Coding] Software development (Handy)
Siriwilai Chaiwattanaphon
13:56 Asian Stanley. International Limited Project progress work #1085 (Close request): [Internal Design]
Siriwilai Chaiwattanaphon
13:56 Asian Stanley. International Limited Project progress work #1084 (Close request): [Requirement definition]
Siriwilai Chaiwattanaphon
13:35 Asian Stanley. International Limited Project progress work #790 (Close request): [Colding] Handy terminal BT-A500 Java application [Calling maintenance staff system]
Siriwilai Chaiwattanaphon
13:35 Asian Stanley. International Limited Project progress work #995 (Close request): get requirement and create specification Doc. [Calling maintenance staff system]
Siriwilai Chaiwattanaphon
13:33 Asian Stanley. International Limited Project progress work #1083 (Close request): [Installation&On-site support]
Siriwilai Chaiwattanaphon
13:33 Asian Stanley. International Limited Project progress work #1346 (Close request): [Coding] Software development (Window App)
Siriwilai Chaiwattanaphon
13:33 Asian Stanley. International Limited Project progress work #1356 (Close request): [Coding] PDF report
Siriwilai Chaiwattanaphon
13:33 Asian Stanley. International Limited Project progress work #1355 (Close request): [Coding] MTTR report
Siriwilai Chaiwattanaphon
13:33 Asian Stanley. International Limited Project progress work #1354 (Close request): [Coding] Breakdown report
Siriwilai Chaiwattanaphon
13:32 Asian Stanley. International Limited Project progress work #1353 (Close request): [Coding] Window App Create report 3 reports
Siriwilai Chaiwattanaphon
13:32 Asian Stanley. International Limited Project progress work #1352 (Close request): [Coding] Window App Add table master 6 tabel
Siriwilai Chaiwattanaphon
13:31 Asian Stanley. International Limited Project progress work #1343 (Close request): [Coding] Web
Siriwilai Chaiwattanaphon
13:31 Asian Stanley. International Limited Project progress work #1359 (Close request): [Coding] web socket
Siriwilai Chaiwattanaphon
13:30 Asian Stanley. International Limited Project progress work #1358 (Close request): [Coding] Generate PDF report
Siriwilai Chaiwattanaphon
13:29 Asian Stanley. International Limited Project progress work #1363 (Close request): [Coding] Monitor #4
Siriwilai Chaiwattanaphon
13:29 Asian Stanley. International Limited Project progress work #1362 (Close request): [Coding] Monitor #3
Siriwilai Chaiwattanaphon
13:29 Asian Stanley. International Limited Project progress work #1361 (Close request): [Coding] Monitor #2
Siriwilai Chaiwattanaphon
13:29 Asian Stanley. International Limited Project progress work #1360 (Close request): [Coding] Monitor #1
Siriwilai Chaiwattanaphon
13:29 Asian Stanley. International Limited Project progress work #1357 (Close request): [Coding] 4/4 dashboards
Siriwilai Chaiwattanaphon
13:11 Asian Stanley. International Limited Project progress work #1342 (Close request): [Coding] Web Socket
Siriwilai Chaiwattanaphon
13:07 Asian Stanley. International Limited Project progress work #1340 (Close request): [Coding] Software development (Tablet)
Siriwilai Chaiwattanaphon
13:06 Asian Stanley. International Limited Project progress work #1351 (Close request): [Coding] Tablet Create function Monitor
Siriwilai Chaiwattanaphon
13:06 Asian Stanley. International Limited Project progress work #1350 (Close request): [Coding] Tablet Create function Job Assignment
Siriwilai Chaiwattanaphon
13:05 Asian Stanley. International Limited Project progress work #1338 (Close request): [Coding] Software development (Handy)
Siriwilai Chaiwattanaphon
13:04 Asian Stanley. International Limited Project progress work #1081 (Close request): [Internal Design]
Siriwilai Chaiwattanaphon
13:04 Asian Stanley. International Limited Project progress work #1080 (Close request): [Requirement definition]
Siriwilai Chaiwattanaphon
12:02 Asian Stanley. International Limited Project progress work #1349 (Close request): [Coding] Handy Create function Inspection
Siriwilai Chaiwattanaphon
12:01 Asian Stanley. International Limited Project progress work #1348 (Close request): [Coding] Handy Create function Request Repair
Siriwilai Chaiwattanaphon
 