From 05 May 2025 to 14 May 2025

14 May 2025

17:22 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
Fixed sort and scrollbar. Taweesak Prumvised
17:13 ALPHA INDUSTRY (THAILAND) CO.,LTD. 8.00 hours (Project progress work #999 (Closed): Pokayoke inspection system )
-Design database/Design code API (C#) Priroj Neamjarn
17:13 ALPHA INDUSTRY (THAILAND) CO.,LTD. 8.00 hours (Project progress work #999 (Closed): Pokayoke inspection system )
Design database/Design code API (C#) Priroj Neamjarn
10:51 NTN MANUFACTURING (THAILAND) CO., LTD. 3.00 hours (Project progress work #910 (Closed): Back-End Web dashboard application PHP)
Compare Data soi 6 Nattaporn Chaiya
08:18 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #505 (Closed): [Coding] Warehouse management system handyterminal Java)
On site test and fixed. Taweesak Prumvised
08:18 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #505 (Closed): [Coding] Warehouse management system handyterminal Java)
Fixed and modify function after trial. Taweesak Prumvised

13 May 2025

16:05 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #910 (Closed): Back-End Web dashboard application PHP)
Fix Electric Summary Nattaporn Chaiya
16:05 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #910 (Closed): Back-End Web dashboard application PHP)
Fix Electric Summary Nattaporn Chaiya
09:32 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(12/05) Update form NTN(rev.5), meeting about project Sumitomo Panthita Roekdee
09:29 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(09/05) Sick leave Panthita Roekdee
09:26 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(08/05) Training i-Reporter - Topre Panthita Roekdee
09:25 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(07/05) Meeting with Minebea, Update form NTN(rev.5), Meeting with Sumitomo, Training plan i-Reporter for Topre Panthita Roekdee

12 May 2025

22:18 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #692 (Closed): Design and get requirements)
Kittisak Isarapongporn
22:09 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #692 (Closed): Design and get requirements)
Kittisak Isarapongporn
22:04 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #692 (Closed): Design and get requirements)
Kittisak Isarapongporn
21:51 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #692 (Closed): Design and get requirements)
Kittisak Isarapongporn
21:47 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #692 (Closed): Design and get requirements)
Kittisak Isarapongporn
21:39 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #692 (Closed): Design and get requirements)
Kittisak Isarapongporn
21:33 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 8.00 hours (Project progress work #692 (Closed): Design and get requirements)
Kittisak Isarapongporn
22:17 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #867 (Closed): [Documentation] IKD - Get requirements of project)
Kittisak Isarapongporn
22:08 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #867 (Closed): [Documentation] IKD - Get requirements of project)
Kittisak Isarapongporn
22:03 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #867 (Closed): [Documentation] IKD - Get requirements of project)
Kittisak Isarapongporn
22:00 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #867 (Closed): [Documentation] IKD - Get requirements of project)
Kittisak Isarapongporn
21:50 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #867 (Closed): [Documentation] IKD - Get requirements of project)
Kittisak Isarapongporn
21:27 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #867 (Closed): [Documentation] IKD - Get requirements of project)
Kittisak Isarapongporn
21:14 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #867 (Closed): [Documentation] IKD - Get requirements of project)
Meeting at on-site Kittisak Isarapongporn
22:17 THAI MATTO NS CO., LTD. 8.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
22:08 THAI MATTO NS CO., LTD. 8.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
22:04 THAI MATTO NS CO., LTD. 8.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
22:00 THAI MATTO NS CO., LTD. 8.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
21:54 THAI MATTO NS CO., LTD. 3.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
21:43 THAI MATTO NS CO., LTD. 8.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
21:38 THAI MATTO NS CO., LTD. 8.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
21:37 THAI MATTO NS CO., LTD. 4.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
21:30 THAI MATTO NS CO., LTD. 8.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
21:16 THAI MATTO NS CO., LTD. 8.00 hours (Project progress work #873 (Closed): [Documentation] Get requirements of project)
Make document & meeting at on-site Kittisak Isarapongporn
22:15 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
Kittisak Isarapongporn
22:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
Kittisak Isarapongporn
22:13 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. 8.00 hours (Project progress work #865 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
22:05 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. 4.00 hours (Project progress work #865 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
22:01 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. 8.00 hours (Project progress work #865 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
21:37 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. 4.00 hours (Project progress work #865 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
21:26 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. 4.00 hours (Project progress work #865 (Closed): [Documentation] Get requirements of project)
Site survey and testing Kittisak Isarapongporn
22:12 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
22:12 NTN MANUFACTURING (THAILAND) CO., LTD. 4.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
22:11 NTN MANUFACTURING (THAILAND) CO., LTD. 4.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
22:08 NTN MANUFACTURING (THAILAND) CO., LTD. 4.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
22:08 NTN MANUFACTURING (THAILAND) CO., LTD. 4.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
22:02 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
22:01 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
21:59 NTN MANUFACTURING (THAILAND) CO., LTD. 4.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
21:49 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
21:48 NTN MANUFACTURING (THAILAND) CO., LTD. 4.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
21:46 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
21:46 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #997 (Closed): [Coding] Backend web dashboard and reports)
Kittisak Isarapongporn
22:12 NIPPN (THAILAND) CO., LTD. 4.00 hours (Project progress work #902 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
22:09 NIPPN (THAILAND) CO., LTD. 4.00 hours (Project progress work #902 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
22:03 NIPPN (THAILAND) CO., LTD. 4.00 hours (Project progress work #902 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
21:57 NIPPN (THAILAND) CO., LTD. 3.00 hours (Project progress work #902 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
21:21 NIPPN (THAILAND) CO., LTD. 5.00 hours (Project progress work #902 (Closed): [Documentation] Get requirements of project)
Meeting at on-site Kittisak Isarapongporn
22:04 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
21:57 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
21:35 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
21:59 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #892 (Closed): [Development] Enhance the web function and ui)
Kittisak Isarapongporn
21:56 A.N.I. LOGISTICS, LTD. 6.00 hours (Project progress work #892 (Closed): [Development] Enhance the web function and ui)
Add SC flag support for INNER PACKING application Kittisak Isarapongporn
21:54 AH BRAKE (THAILAND) CO., LTD. 5.00 hours (Project progress work #887 (Closed): [Development] Modify the packing and shipping windows app and handy)
Kittisak Isarapongporn
21:53 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #887 (Closed): [Development] Modify the packing and shipping windows app and handy)
Kittisak Isarapongporn
21:53 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #887 (Closed): [Development] Modify the packing and shipping windows app and handy)
Kittisak Isarapongporn
21:50 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #887 (Closed): [Development] Modify the packing and shipping windows app and handy)
Kittisak Isarapongporn
21:42 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #887 (Closed): [Development] Modify the packing and shipping windows app and handy)
Kittisak Isarapongporn
21:28 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #887 (Closed): [Development] Modify the packing and shipping windows app and handy)
Kittisak Isarapongporn
21:27 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Project progress work #887 (Closed): [Development] Modify the packing and shipping windows app and handy)
Kittisak Isarapongporn
21:27 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Project progress work #887 (Closed): [Development] Modify the packing and shipping windows app and handy)
Kittisak Isarapongporn
21:49 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
Kittisak Isarapongporn
21:48 NIPPON KONPO (THAILAND) CO., LTD. 4.00 hours (Project progress work #751 (Closed): Design and get requirements)
Kittisak Isarapongporn
21:40 NIPPON KONPO (THAILAND) CO., LTD. 8.00 hours (Project progress work #751 (Closed): Design and get requirements)
Kittisak Isarapongporn
21:32 NIPPON KONPO (THAILAND) CO., LTD. 8.00 hours (Project progress work #751 (Closed): Design and get requirements)
Kittisak Isarapongporn
21:32 NIPPON KONPO (THAILAND) CO., LTD. 8.00 hours (Project progress work #751 (Closed): Design and get requirements)
Kittisak Isarapongporn
21:41 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
21:34 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
21:29 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
21:29 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
21:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #996 (Closed): [Development] Handheld and label print software development )
LAT urgent project!! Kittisak Isarapongporn
21:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #996 (Closed): [Development] Handheld and label print software development )
LAT urgent project!! Kittisak Isarapongporn
21:21 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 3.00 hours (Project progress work #996 (Closed): [Development] Handheld and label print software development )
LAT urgent project!! Kittisak Isarapongporn
21:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #996 (Closed): [Development] Handheld and label print software development )
LAT urgent project!! Kittisak Isarapongporn
21:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #996 (Closed): [Development] Handheld and label print software development )
LAT urgent project!! Kittisak Isarapongporn
21:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #996 (Closed): [Development] Handheld and label print software development )
LAT urgent project!! Kittisak Isarapongporn
21:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #996 (Closed): [Development] Handheld and label print software development )
LAT urgent project!! Kittisak Isarapongporn

09 May 2025

17:43 NTN MANUFACTURING (THAILAND) CO., LTD. 6.00 hours (Project progress work #910 (Closed): Back-End Web dashboard application PHP)
Fix Dashboard Data Electric Summary Nattaporn Chaiya
17:40 NTN MANUFACTURING (THAILAND) CO., LTD. 1.00 hour (Project progress work #910 (Closed): Back-End Web dashboard application PHP)
Internal Meeting Nattaporn Chaiya
17:41 AH BRAKE (THAILAND) CO., LTD. 1.00 hour (Project progress work #898 (Closed): Dashboard)
Internal Meeting Nattaporn Chaiya
17:28 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #505 (Closed): [Coding] Warehouse management system handyterminal Java)
Fixed and modify function after trial. Taweesak Prumvised
17:13 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
Improve the code to make it faster, as the actual customer data is large, causing the system to be slow when loading. Priroj Neamjarn

08 May 2025

17:41 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #505 (Closed): [Coding] Warehouse management system handyterminal Java)
Fixed and modify function after trial. Taweesak Prumvised
16:55 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Adjust code print content label for item part by part Priroj Neamjarn
16:32 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #910 (Closed): Back-End Web dashboard application PHP)
Meeting with customer and agree on the display of data Nattaporn Chaiya

07 May 2025

21:21 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #788 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing classify rank system])
modify android app (Taping label system) Take the project in Phase 2 and make additional corrections as requested by ... Soraya Norasing
21:19 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #788 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing classify rank system])
modify android app (Process control system) Soraya Norasing
21:19 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #788 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing classify rank system])
modify android app (Process control system) Soraya Norasing
21:18 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #788 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing classify rank system])
modify android app (Process control system) Soraya Norasing
21:20 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #995 (Closed): get requirement and create specification Doc. [Calling maintenance staff system])
meeting with customer Explain the specs and get the requirements. Soraya Norasing
21:17 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #995 (Closed): get requirement and create specification Doc. [Calling maintenance staff system])
modify spec & design layout Soraya Norasing
21:16 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #910 (Closed): Back-End Web dashboard application PHP)
Correct data at NTN PT Nattaporn Chaiya
21:16 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
update system & support Soraya Norasing
17:40 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #505 (Closed): [Coding] Warehouse management system handyterminal Java)
Modify issues after trial. Taweesak Prumvised
17:26 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Adjust code print content label for item part by part Priroj Neamjarn
11:20 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(06/05)Support i-Reporter, Meeting with NMT Panthita Roekdee
11:19 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(05/05) Sick leave Panthita Roekdee
11:19 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(02/05)Support i-Reporter Panthita Roekdee
11:18 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(30/04) Create i-Reporter form-Sumitomo (3/3) Panthita Roekdee
11:18 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(29/04) Create i-Reporter form-Sumitomo (2/3), Meeting with FNTC, Meeting with Thaitinplate Panthita Roekdee
11:17 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(28/04) Create i-Reporter form-Sumitomo (1/3) Panthita Roekdee
11:16 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(25/04)Support i-Reporter, Meeting with NMT Panthita Roekdee
11:16 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(24/04) Create i-Reporter form-NMT (rev.4) Panthita Roekdee
11:15 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(23/04)Training i-Reporter-Topre Panthita Roekdee
11:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(22/04) Create i-Reporter form-NMT (rev.4) Panthita Roekdee
11:13 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(21/04) Support i-Reporter, On-side NMT Panthita Roekdee
11:12 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(18/04) Create i-Reporter form-NMT (4/4), On-side Pioneer Electronics Panthita Roekdee
11:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(17/04) Create i-Reporter form-NMT (3/4), Meeting with Sumitomo Panthita Roekdee
11:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(11/04) Create i-Reporter form-NMT (2/4), Meeting with Techno-mental, Meeting with Minebea Panthita Roekdee
11:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(10/04) Create i-Reporter form-NMT (1/4), Training Nichiden on Asok office Panthita Roekdee
11:08 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(09/04) Create i-Reporter form-Sumitomo (3/3) Panthita Roekdee
11:07 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(08/04) Create i-Reporter form-Sumitomo (2/3) Panthita Roekdee
11:07 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(07/04) Create i-Reporter form-Sumitomo (1/3) Panthita Roekdee
11:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(04/04) Leave of absence Panthita Roekdee
11:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(03/04) Leave of absence Panthita Roekdee
09:22 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #846 (Closed): [Cording] Warehouse management system for NKT Android)
Onsite installation. Taweesak Prumvised

06 May 2025

22:12 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #910 (Closed): Back-End Web dashboard application PHP)
Install system at NTN Soi3 Nattaporn Chaiya
16:37 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Adjust data inbound Priroj Neamjarn

05 May 2025

19:47 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #910 (Closed): Back-End Web dashboard application PHP)
Update data for NTN Soi6 Nattaporn Chaiya
17:57 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #913 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Adjust Approve process Priroj Neamjarn
17:57 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #913 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
-Adjust Approve process Priroj Neamjarn
17:31 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #843 (In Progress): [Cording] Warehouse system for business improvement for NKT Android)
Internal test of outbound function. Taweesak Prumvised
 