Activity
From 12 Mar 2025 to 21 Mar 2025
21 Mar 2025
- 18:02 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Fixed web socket installation on site.
- 12:13 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Fixed web socket installation on site.
- 17:03 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Support Fix bug, install
- 16:30 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- Support i-Reporter
- 10:33 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Support user onsite (install function edit schedule plan production,material, training user injection.
20 Mar 2025
- 17:28 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Fix issues
- 16:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- Support i-Reporter
- 11:35 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- test and fix bug in api (step taping check)
- 11:26 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- add printer to server , setup printer, support user online
- 11:18 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- test windows app with K.fight
- 10:47 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- Install update & support user on site
- 11:33 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
- test and fix bug (bonding check process can't scan machine)
- 11:27 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- meeting at NTPT about asprova
- 11:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 1.00 hour (Project progress work #788 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing classify rank system])
- meeting online get requirement with customer
- 11:19 ASIAN STANLEY. INTERNATIONAL LIMITED. 5.00 hours (Project progress work #788 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing classify rank system])
- prepare spec doc
- 11:23 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #790 (Closed): [Colding] Handy terminal BT-A500 Java application [Calling maintenance staff system])
- meeting with customer get requirement
- 11:20 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- support user onsite
- 11:20 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- support user onsite
- 08:19 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #505 (Closed): [Coding] Warehouse management system handyterminal Java)
- Trial demo and fixed some issues #2.
19 Mar 2025
- 22:32 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed and completed new requiement edit schedule plan material,plan production,plan outbound material (plandate,q...
- 22:31 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Support user on site production line (line inject).
- 22:29 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print Grouping List in page grouping on web Page Transport.
- 17:29 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 17:29 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 16:39 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- Create i-Reporter form
- 16:25 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- User manual Web
- 16:25 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- User manual Web
18 Mar 2025
- 17:40 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #505 (Closed): [Coding] Warehouse management system handyterminal Java)
- Trial demo and fixed some issues.
- 17:22 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 17:22 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 15:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- Support i-Reporter
- 08:46 AH BRAKE (THAILAND) CO., LTD. 3.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Fixed web socket installation on site.
- 08:45 NKT NIPPON KONPO (THAILAND) CO., LTD 5.00 hours (Project progress work #843 (In Progress): [Cording] Warehouse system for business improvement for NKT Android)
- Develop UI of outbound function.
17 Mar 2025
- 20:13 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -Internal test
- 20:13 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -Internal test
- 18:43 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Internal test, Fix bug
- 08:55 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- User manual Web
- 16:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- Create i-Reporter form
- 14:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 7.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - PICS - Support LAT testing for the Put Away process.
- 12:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 1.00 hour (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - PICS- Check program SPM2TEXT 1/1
16 Mar 2025
- 01:27 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed page grouping on web Page Transport.
- 01:26 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed page grouping backend on web Page Transport.
15 Mar 2025
- 17:15 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #843 (In Progress): [Cording] Warehouse system for business improvement for NKT Android)
- Develop UI of outbound function.
- 17:06 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 17:06 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 16:24 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed function outbound manual update label update stock on web Page Outbound delivery.
- 15:41 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Project progress work #904 (Closed): [Testing] Test and conduct the test report and user manual)
- Edit Layout Label and Fix bug problem
- 12:53 AH BRAKE (THAILAND) CO., LTD. 3.00 hours (Project progress work #904 (Closed): [Testing] Test and conduct the test report and user manual)
- 13:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- Create i-Reporter form
- 13:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (14/03) Create i-Reporter form(1/2)
- 13:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (13/03) (On-site) Meeting with NMT customer
- 13:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (12/03)Create i-Reporter form-NTN(rev.2)(3/3)
- 13:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (11/03)Create i-Reporter form-NTN(rev.2)(2/3)
14 Mar 2025
- 23:37 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Fix issues Labels print 1,000 items
- 09:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Fix issues Labels print 1,000 items
- 17:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Install web socket on ah site.
- 17:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 17:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 10:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - REPO - Check the calculation of the Repo program. 1/2
- 10:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - REPO - Check the calculation of the Repo program. 2/2
- 10:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - BT Server API - Optimize the Put Away program to run faster. 1/1
- 08:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - REPO - Check the operation of the REPOK program (Import Data from the CAPS system). 2/4 ,Check the opera...
- 08:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - STEP- Fixed error program FJKN011 of STEP System. 1/1 , Check the operation of the REPOK program (Import...
13 Mar 2025
- 18:26 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Install web socket on ah site.
- 18:03 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 18:03 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
12 Mar 2025
- 19:28 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and complated ViewDetail in Page Inbound Schedule Detail.
- 19:27 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and complated ViewDetail in Page Outbound Schedule Detail.
- 19:24 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and complated Master Data Page Customer.
- 19:22 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print PDF In_house_check_sheet Page Inbound Receiving Schedule.
- 19:22 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and complated Print PDF In_house_check_sheet Page Inbound Receiving Schedule.
- 19:14 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print Label Tag in Page Inbound Receiving Schedule.
- 19:14 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print Label Tag in Page Inbound Receiving Schedule.
- 19:13 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Master Page Driver Master Truck Master.
- 19:10 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed ViewDetail, Edit order_date Page Outbound Schedule Delivery.
- 19:06 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed View Edit Upc_Part_Tag Page Outbound Schedule Delivery.
- 19:05 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print PDF Upc_Part_Tag Page Outbound Schedule Delivery.
- 19:05 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print PDF Upc_Part_Tag Page Outbound Schedule Delivery.
- 19:04 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print PDF delivery_bill Page Outbound Schedule Delivery.
- 19:04 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print PDF delivery_bill Page Outbound Schedule Delivery.
- 19:03 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print PDF picking_list Page Outbound Schedule Delivery.
- 19:02 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print PDF picking_list Page Outbound Schedule Delivery.
- 19:02 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print PDF delivery_check_list Page Outbound Schedule Delivery.
- 19:01 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print PDF delivery_check_list Page Outbound Schedule Delivery.
- 18:59 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed function inbound manual on web Page Production Schedule.
- 18:59 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed function inbound manual on web Page Production Schedule.
- 18:58 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed function inbound manual on web Page Production Schedule.
- 18:56 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed page grouping on web Page Transport.
- 18:55 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed function outbound manual View Selected on web Page Outbound delivery.
- 18:55 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed function outbound manual update label update stock on web Page Outbound delivery.
- 19:18 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Support user on site.
- 19:18 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Support user on site.
- 19:16 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #605 (Closed): [Coding] Warehouse management system Web app PHP Phase02)
- Developed and completed new requiement Print PDF page part_request.
- 17:50 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Test and install AHT Calling app.
- 16:55 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #898 (Closed): Dashboard)
- Make a dropdown function to choose to display the Dashboard
- 16:33 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- Fix bug and Adjust Outbound Picking/Loading process
- 16:33 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- Fix bug and Adjust Outbound Picking/Loading process