Activity
From 06 Mar 2025 to 15 Mar 2025
15 Mar 2025
- 17:15 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #843 (In Progress): [Cording] Warehouse system for business improvement for NKT Android)
- Develop UI of outbound function.
- 17:06 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 17:06 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 16:24 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed function outbound manual update label update stock on web Page Outbound delivery.
- 15:41 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Project progress work #904 (Closed): [Testing] Test and conduct the test report and user manual)
- Edit Layout Label and Fix bug problem
- 12:53 AH BRAKE (THAILAND) CO., LTD. 3.00 hours (Project progress work #904 (Closed): [Testing] Test and conduct the test report and user manual)
- 13:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- Create i-Reporter form
- 13:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (14/03) Create i-Reporter form(1/2)
- 13:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (13/03) (On-site) Meeting with NMT customer
- 13:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (12/03)Create i-Reporter form-NTN(rev.2)(3/3)
- 13:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (11/03)Create i-Reporter form-NTN(rev.2)(2/3)
14 Mar 2025
- 23:37 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Fix issues Labels print 1,000 items
- 09:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Fix issues Labels print 1,000 items
- 17:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Install web socket on ah site.
- 17:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 17:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 10:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - REPO - Check the calculation of the Repo program. 1/2
- 10:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - REPO - Check the calculation of the Repo program. 2/2
- 10:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - BT Server API - Optimize the Put Away program to run faster. 1/1
- 08:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - REPO - Check the operation of the REPOK program (Import Data from the CAPS system). 2/4 ,Check the opera...
- 08:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
- [Task] LAT - STEP- Fixed error program FJKN011 of STEP System. 1/1 , Check the operation of the REPOK program (Import...
13 Mar 2025
- 18:26 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Install web socket on ah site.
- 18:03 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
- 18:03 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -User manual
12 Mar 2025
- 19:28 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and complated ViewDetail in Page Inbound Schedule Detail.
- 19:27 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and complated ViewDetail in Page Outbound Schedule Detail.
- 19:24 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and complated Master Data Page Customer.
- 19:22 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print PDF In_house_check_sheet Page Inbound Receiving Schedule.
- 19:22 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and complated Print PDF In_house_check_sheet Page Inbound Receiving Schedule.
- 19:14 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print Label Tag in Page Inbound Receiving Schedule.
- 19:14 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print Label Tag in Page Inbound Receiving Schedule.
- 19:13 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Master Page Driver Master Truck Master.
- 19:10 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed ViewDetail, Edit order_date Page Outbound Schedule Delivery.
- 19:06 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed View Edit Upc_Part_Tag Page Outbound Schedule Delivery.
- 19:05 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print PDF Upc_Part_Tag Page Outbound Schedule Delivery.
- 19:05 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print PDF Upc_Part_Tag Page Outbound Schedule Delivery.
- 19:04 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print PDF delivery_bill Page Outbound Schedule Delivery.
- 19:04 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print PDF delivery_bill Page Outbound Schedule Delivery.
- 19:03 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print PDF picking_list Page Outbound Schedule Delivery.
- 19:02 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print PDF picking_list Page Outbound Schedule Delivery.
- 19:02 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed Print PDF delivery_check_list Page Outbound Schedule Delivery.
- 19:01 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed Print PDF delivery_check_list Page Outbound Schedule Delivery.
- 18:59 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed function inbound manual on web Page Production Schedule.
- 18:59 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed function inbound manual on web Page Production Schedule.
- 18:58 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed and completed function inbound manual on web Page Production Schedule.
- 18:56 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed page grouping on web Page Transport.
- 18:55 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed function outbound manual View Selected on web Page Outbound delivery.
- 18:55 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Developed function outbound manual update label update stock on web Page Outbound delivery.
- 19:18 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Support user on site.
- 19:18 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Support user on site.
- 19:16 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #605 (Closed): [Coding] Warehouse management system Web app PHP Phase02)
- Developed and completed new requiement Print PDF page part_request.
- 17:50 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Test and install AHT Calling app.
- 16:55 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #898 (Closed): Dashboard)
- Make a dropdown function to choose to display the Dashboard
- 16:33 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- Fix bug and Adjust Outbound Picking/Loading process
- 16:33 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- Fix bug and Adjust Outbound Picking/Loading process
11 Mar 2025
- 18:27 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #877 (Closed): [Coding] Test and fixed function with ISEWAN)
- Fixed issue after support golive and support other.
- 18:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Edit web socket mobile calling to ah break.
- 18:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Edit mobile calling to ah calling.
- 18:19 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
- Edit mobile calling to ah calling.
- 17:44 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -Fix bug and Adjust some process
- 17:44 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -Fix bug and Adjust some process
- 17:38 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Fix bug after internal test
- 11:37 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Internal test, Fix bug
- 14:38 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- support user onsite
- 14:37 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- update system and training user
- 14:37 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- fix bug ht label and test
- 14:33 ASIAN STANLEY. INTERNATIONAL LIMITED. 5.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- test with K.fight
- 14:32 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- Test ht label print
- 14:32 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- Test ht label print
- 14:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print & test
- 14:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print
- 14:30 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print
- 14:30 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print
- 14:30 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print
- 14:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print
- 14:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print
- 14:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print
- 14:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print
- 14:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print
- 14:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
- develop ht label print
- 14:36 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- meeting at NTPT about asprova
- 14:35 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #788 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing classify rank system])
- meeting online get requirement
- 14:34 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
- test dashboard
- 14:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
- Install update & support user on site
- 14:23 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
- Install update & support user on site
- 14:25 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #885 (Closed): get requirement and create specification Doc. [Taping])
- meeting with customer & update spec doc.
- 14:22 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- Support user on site
- 14:22 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- Support user on site
- 14:21 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- Support user on site
- 14:21 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- Support user on site
- 14:20 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- Support user on site
- 10:02 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (10/03)Create i-Reporter form-NTN(rev.2)(1/3)
- 10:01 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (07/03)i-Reporter manual document for Sumitomo Rubber, Meeting online with Sahabangplagod Industry, Meeting online wi...
- 10:00 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (06/03)(On-site) Demo form i-Reporter for Union Autoparts customer
- 09:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (05/03)(On-site) Installation i-Reporter-Minebea(Lopburi)
- 09:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (04/03)i-Reporter manual document for Sumitomo Rubber
- 09:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (03/03)Create i-Reporter form-NTN(rev.)(4/3)
- 09:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (01/03)Create i-Reporter form-NTN(rev.)(3/3)
- 09:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (28/02)Create i-Reporter form-NTN(rev.)(2/3), (On-site) Trends customer(Pathumthani)
- 09:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (27/02)Create i-Reporter form-NTN(rev.)(1/3), Meeting online with Sumitomo customer
- 09:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (26/02)Create i-Reporter form-NTN(3/3), (On-site)Installation i-Reporter NTN(Rayong)
- 09:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (25/02)Create i-Reporter form-NTN(2/3), Meeting online task Sumitomo with K.Teena, Update project i-Reporter applicat...
- 09:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (24/02)Create i-Reporter form-NTN(1/3)
- 09:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
- (21/02)Create i-Reporter form-Minebea(3/3)
10 Mar 2025
- 21:11 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -Internal test
- 21:11 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -Internal test
- 18:52 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #877 (Closed): [Coding] Test and fixed function with ISEWAN)
- Created HT Pegasus manual.
07 Mar 2025
- 17:15 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -Coding Outbound picking process
- 17:15 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -Coding Outbound picking process
- 16:34 PT NIPPON KONPO INDONESIA 4.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Fix Master Location on AWS
- 11:27 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Fix issues Dashboard On AWS
- 11:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Develop Dashboard for NKI and Install to Cloud AWS server
- 11:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Develop Dashboard for NKI
- 11:18 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Develop Export PDF Loading List
- 11:18 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Develop Export PDF Loading List
- 11:01 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
- Develop Export PDF Picking List
- 11:29 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Fix issues Labels
- 11:16 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
- Take the project from the test test server to real server
- 11:06 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
- Create Manual document Web 2/2
- 11:06 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
- Create Manual document Web 1/2
- 11:13 AH BRAKE (THAILAND) CO., LTD. 2.00 hours (Project progress work #898 (Closed): Dashboard)
- Dasboard AHT 3/3
- 11:13 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #898 (Closed): Dashboard)
- Dasboard AHT 2/3
- 11:13 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #898 (Closed): Dashboard)
- Dasboard AHT 1/3
- 08:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #897 (Closed): Review and Revise documents of CKD systems)
- [Task] LAT - PICS& CAPS - Review and Revise documents of PICS& CAPS System. 1/1
06 Mar 2025
- 17:39 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -Coding Outbound picking process
- 17:39 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
- -Coding Outbound picking process
- 11:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #897 (Closed): Review and Revise documents of CKD systems)
- [Task] LAT - STEP & CYLC - Review and Revise documents of STEP & CYLC System. 1/1