From 06 Mar 2025 to 15 Mar 2025

15 Mar 2025

17:15 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #843 (In Progress): [Cording] Warehouse system for business improvement for NKT Android)
Develop UI of outbound function. Taweesak Prumvised
17:06 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-User manual Priroj Neamjarn
17:06 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-User manual Priroj Neamjarn
16:24 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed function outbound manual update label update stock on web Page Outbound delivery. Ronnagon Kongsuwan
15:41 AH BRAKE (THAILAND) CO., LTD. 4.00 hours (Project progress work #904 (Closed): [Testing] Test and conduct the test report and user manual)
Edit Layout Label and Fix bug problem Pattanasak Chaonchom
12:53 AH BRAKE (THAILAND) CO., LTD. 3.00 hours (Project progress work #904 (Closed): [Testing] Test and conduct the test report and user manual)
Pattanasak Chaonchom
13:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
13:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(14/03) Create i-Reporter form(1/2) Panthita Roekdee
13:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(13/03) (On-site) Meeting with NMT customer Panthita Roekdee
13:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(12/03)Create i-Reporter form-NTN(rev.2)(3/3) Panthita Roekdee
13:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(11/03)Create i-Reporter form-NTN(rev.2)(2/3) Panthita Roekdee

14 Mar 2025

23:37 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Fix issues Labels print 1,000 items Nattaporn Chaiya
09:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Fix issues Labels print 1,000 items Nattaporn Chaiya
17:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
Install web socket on ah site. Taweesak Prumvised
17:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-User manual Priroj Neamjarn
17:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-User manual Priroj Neamjarn
10:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
[Task] LAT - REPO - Check the calculation of the Repo program. 1/2 Thanthima Phaengkham
10:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
[Task] LAT - REPO - Check the calculation of the Repo program. 2/2 Thanthima Phaengkham
10:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 2.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
[Task] LAT - BT Server API - Optimize the Put Away program to run faster. 1/1 Thanthima Phaengkham
08:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
[Task] LAT - REPO - Check the operation of the REPOK program (Import Data from the CAPS system). 2/4 ,Check the opera... Thanthima Phaengkham
08:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #903 (Closed): Developing an Issue Resolution Process for CKD Project Customer Support.)
[Task] LAT - STEP- Fixed error program FJKN011 of STEP System. 1/1 , Check the operation of the REPOK program (Import... Thanthima Phaengkham

13 Mar 2025

18:26 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
Install web socket on ah site. Taweesak Prumvised
18:03 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-User manual Priroj Neamjarn
18:03 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-User manual Priroj Neamjarn

12 Mar 2025

19:28 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and complated ViewDetail in Page Inbound Schedule Detail. Ronnagon Kongsuwan
19:27 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and complated ViewDetail in Page Outbound Schedule Detail. Ronnagon Kongsuwan
19:24 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and complated Master Data Page Customer. Ronnagon Kongsuwan
19:22 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed Print PDF In_house_check_sheet Page Inbound Receiving Schedule. Ronnagon Kongsuwan
19:22 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and complated Print PDF In_house_check_sheet Page Inbound Receiving Schedule. Ronnagon Kongsuwan
19:14 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed Print Label Tag in Page Inbound Receiving Schedule. Ronnagon Kongsuwan
19:14 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Print Label Tag in Page Inbound Receiving Schedule. Ronnagon Kongsuwan
19:13 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Master Page Driver Master Truck Master. Ronnagon Kongsuwan
19:10 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed ViewDetail, Edit order_date Page Outbound Schedule Delivery. Ronnagon Kongsuwan
19:06 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed View Edit Upc_Part_Tag Page Outbound Schedule Delivery. Ronnagon Kongsuwan
19:05 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed Print PDF Upc_Part_Tag Page Outbound Schedule Delivery. Ronnagon Kongsuwan
19:05 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Print PDF Upc_Part_Tag Page Outbound Schedule Delivery. Ronnagon Kongsuwan
19:04 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed Print PDF delivery_bill Page Outbound Schedule Delivery. Ronnagon Kongsuwan
19:04 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Print PDF delivery_bill Page Outbound Schedule Delivery. Ronnagon Kongsuwan
19:03 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed Print PDF picking_list Page Outbound Schedule Delivery. Ronnagon Kongsuwan
19:02 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Print PDF picking_list Page Outbound Schedule Delivery. Ronnagon Kongsuwan
19:02 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed Print PDF delivery_check_list Page Outbound Schedule Delivery. Ronnagon Kongsuwan
19:01 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Print PDF delivery_check_list Page Outbound Schedule Delivery. Ronnagon Kongsuwan
18:59 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed function inbound manual on web Page Production Schedule. Ronnagon Kongsuwan
18:59 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed function inbound manual on web Page Production Schedule. Ronnagon Kongsuwan
18:58 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed function inbound manual on web Page Production Schedule. Ronnagon Kongsuwan
18:56 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed page grouping on web Page Transport. Ronnagon Kongsuwan
18:55 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed function outbound manual View Selected on web Page Outbound delivery. Ronnagon Kongsuwan
18:55 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed function outbound manual update label update stock on web Page Outbound delivery. Ronnagon Kongsuwan
19:18 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Support user on site. Ronnagon Kongsuwan
19:18 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Support user on site. Ronnagon Kongsuwan
19:16 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #605 (Closed): [Coding] Warehouse management system Web app PHP Phase02)
Developed and completed new requiement Print PDF page part_request. Ronnagon Kongsuwan
17:50 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
Test and install AHT Calling app. Taweesak Prumvised
16:55 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #898 (Closed): Dashboard)
Make a dropdown function to choose to display the Dashboard Nattaporn Chaiya
16:33 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
Fix bug and Adjust Outbound Picking/Loading process Priroj Neamjarn
16:33 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
Fix bug and Adjust Outbound Picking/Loading process Priroj Neamjarn

11 Mar 2025

18:27 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #877 (Closed): [Coding] Test and fixed function with ISEWAN)
Fixed issue after support golive and support other. Taweesak Prumvised
18:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
Edit web socket mobile calling to ah break. Taweesak Prumvised
18:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
Edit mobile calling to ah calling. Taweesak Prumvised
18:19 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
Edit mobile calling to ah calling. Taweesak Prumvised
17:44 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Fix bug and Adjust some process Priroj Neamjarn
17:44 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Fix bug and Adjust some process Priroj Neamjarn
17:38 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Fix bug after internal test Nattaporn Chaiya
11:37 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Internal test, Fix bug Nattaporn Chaiya
14:38 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
support user onsite Soraya Norasing
14:37 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
update system and training user Soraya Norasing
14:37 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
fix bug ht label and test Soraya Norasing
14:33 ASIAN STANLEY. INTERNATIONAL LIMITED. 5.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
test with K.fight Soraya Norasing
14:32 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
Test ht label print Soraya Norasing
14:32 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
Test ht label print Soraya Norasing
14:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print & test Soraya Norasing
14:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:30 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:30 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:30 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:36 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
meeting at NTPT about asprova Soraya Norasing
14:35 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #788 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing classify rank system])
meeting online get requirement Soraya Norasing
14:34 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
test dashboard Soraya Norasing
14:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
Install update & support user on site Soraya Norasing
14:23 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
Install update & support user on site Soraya Norasing
14:25 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #885 (Closed): get requirement and create specification Doc. [Taping])
meeting with customer & update spec doc. Soraya Norasing
14:22 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Support user on site Soraya Norasing
14:22 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Support user on site Soraya Norasing
14:21 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Support user on site Soraya Norasing
14:21 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Support user on site Soraya Norasing
14:20 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Support user on site Soraya Norasing
10:02 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(10/03)Create i-Reporter form-NTN(rev.2)(1/3) Panthita Roekdee
10:01 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(07/03)i-Reporter manual document for Sumitomo Rubber, Meeting online with Sahabangplagod Industry, Meeting online wi... Panthita Roekdee
10:00 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(06/03)(On-site) Demo form i-Reporter for Union Autoparts customer Panthita Roekdee
09:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(05/03)(On-site) Installation i-Reporter-Minebea(Lopburi) Panthita Roekdee
09:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(04/03)i-Reporter manual document for Sumitomo Rubber Panthita Roekdee
09:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(03/03)Create i-Reporter form-NTN(rev.)(4/3) Panthita Roekdee
09:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(01/03)Create i-Reporter form-NTN(rev.)(3/3) Panthita Roekdee
09:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(28/02)Create i-Reporter form-NTN(rev.)(2/3), (On-site) Trends customer(Pathumthani) Panthita Roekdee
09:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(27/02)Create i-Reporter form-NTN(rev.)(1/3), Meeting online with Sumitomo customer Panthita Roekdee
09:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(26/02)Create i-Reporter form-NTN(3/3), (On-site)Installation i-Reporter NTN(Rayong) Panthita Roekdee
09:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(25/02)Create i-Reporter form-NTN(2/3), Meeting online task Sumitomo with K.Teena, Update project i-Reporter applicat... Panthita Roekdee
09:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(24/02)Create i-Reporter form-NTN(1/3) Panthita Roekdee
09:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(21/02)Create i-Reporter form-Minebea(3/3) Panthita Roekdee

10 Mar 2025

21:11 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Internal test Priroj Neamjarn
21:11 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Internal test Priroj Neamjarn
18:52 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #877 (Closed): [Coding] Test and fixed function with ISEWAN)
Created HT Pegasus manual. Taweesak Prumvised

07 Mar 2025

17:15 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Outbound picking process Priroj Neamjarn
17:15 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Outbound picking process Priroj Neamjarn
16:34 PT NIPPON KONPO INDONESIA 4.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Fix Master Location on AWS Nattaporn Chaiya
11:27 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Fix issues Dashboard On AWS Nattaporn Chaiya
11:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Dashboard for NKI and Install to Cloud AWS server Nattaporn Chaiya
11:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Dashboard for NKI Nattaporn Chaiya
11:18 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Export PDF Loading List Nattaporn Chaiya
11:18 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Export PDF Loading List Nattaporn Chaiya
11:01 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Export PDF Picking List Nattaporn Chaiya
11:29 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Fix issues Labels Nattaporn Chaiya
11:16 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
Take the project from the test test server to real server Nattaporn Chaiya
11:06 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
Create Manual document Web 2/2 Nattaporn Chaiya
11:06 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
Create Manual document Web 1/2 Nattaporn Chaiya
11:13 AH BRAKE (THAILAND) CO., LTD. 2.00 hours (Project progress work #898 (Closed): Dashboard)
Dasboard AHT 3/3 Nattaporn Chaiya
11:13 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #898 (Closed): Dashboard)
Dasboard AHT 2/3 Nattaporn Chaiya
11:13 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #898 (Closed): Dashboard)
Dasboard AHT 1/3 Nattaporn Chaiya
08:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #897 (Closed): Review and Revise documents of CKD systems)
[Task] LAT - PICS& CAPS - Review and Revise documents of PICS& CAPS System. 1/1 Thanthima Phaengkham

06 Mar 2025

17:39 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Outbound picking process Priroj Neamjarn
17:39 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Outbound picking process Priroj Neamjarn
11:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #897 (Closed): Review and Revise documents of CKD systems)
[Task] LAT - STEP & CYLC - Review and Revise documents of STEP & CYLC System. 1/1 Thanthima Phaengkham
 