From 02 Mar 2025 to 11 Mar 2025

11 Mar 2025

18:27 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #877 (Closed): [Coding] Test and fixed function with ISEWAN)
Fixed issue after support golive and support other. Taweesak Prumvised
18:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
Edit web socket mobile calling to ah break. Taweesak Prumvised
18:23 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
Edit mobile calling to ah calling. Taweesak Prumvised
18:19 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #899 (Closed): MOC Monitoring system)
Edit mobile calling to ah calling. Taweesak Prumvised
17:44 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Fix bug and Adjust some process Priroj Neamjarn
17:44 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Fix bug and Adjust some process Priroj Neamjarn
17:38 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Fix bug after internal test Nattaporn Chaiya
11:37 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Internal test, Fix bug Nattaporn Chaiya
14:38 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
support user onsite Soraya Norasing
14:37 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
update system and training user Soraya Norasing
14:37 ASIAN STANLEY. INTERNATIONAL LIMITED. 6.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
fix bug ht label and test Soraya Norasing
14:33 ASIAN STANLEY. INTERNATIONAL LIMITED. 5.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
test with K.fight Soraya Norasing
14:32 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
Test ht label print Soraya Norasing
14:32 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
Test ht label print Soraya Norasing
14:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print & test Soraya Norasing
14:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:30 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:30 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:30 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:29 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:28 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:27 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)])
develop ht label print Soraya Norasing
14:36 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
meeting at NTPT about asprova Soraya Norasing
14:35 ASIAN STANLEY. INTERNATIONAL LIMITED. 2.00 hours (Project progress work #788 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing classify rank system])
meeting online get requirement Soraya Norasing
14:34 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
test dashboard Soraya Norasing
14:24 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
Install update & support user on site Soraya Norasing
14:23 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
Install update & support user on site Soraya Norasing
14:25 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #885 (Closed): get requirement and create specification Doc. [Taping])
meeting with customer & update spec doc. Soraya Norasing
14:22 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Support user on site Soraya Norasing
14:22 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Support user on site Soraya Norasing
14:21 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Support user on site Soraya Norasing
14:21 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Support user on site Soraya Norasing
14:20 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Support user on site Soraya Norasing
10:02 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(10/03)Create i-Reporter form-NTN(rev.2)(1/3) Panthita Roekdee
10:01 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(07/03)i-Reporter manual document for Sumitomo Rubber, Meeting online with Sahabangplagod Industry, Meeting online wi... Panthita Roekdee
10:00 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(06/03)(On-site) Demo form i-Reporter for Union Autoparts customer Panthita Roekdee
09:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(05/03)(On-site) Installation i-Reporter-Minebea(Lopburi) Panthita Roekdee
09:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(04/03)i-Reporter manual document for Sumitomo Rubber Panthita Roekdee
09:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(03/03)Create i-Reporter form-NTN(rev.)(4/3) Panthita Roekdee
09:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(01/03)Create i-Reporter form-NTN(rev.)(3/3) Panthita Roekdee
09:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(28/02)Create i-Reporter form-NTN(rev.)(2/3), (On-site) Trends customer(Pathumthani) Panthita Roekdee
09:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(27/02)Create i-Reporter form-NTN(rev.)(1/3), Meeting online with Sumitomo customer Panthita Roekdee
09:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(26/02)Create i-Reporter form-NTN(3/3), (On-site)Installation i-Reporter NTN(Rayong) Panthita Roekdee
09:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(25/02)Create i-Reporter form-NTN(2/3), Meeting online task Sumitomo with K.Teena, Update project i-Reporter applicat... Panthita Roekdee
09:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(24/02)Create i-Reporter form-NTN(1/3) Panthita Roekdee
09:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(21/02)Create i-Reporter form-Minebea(3/3) Panthita Roekdee

10 Mar 2025

21:11 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Internal test Priroj Neamjarn
21:11 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Internal test Priroj Neamjarn
18:52 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #877 (Closed): [Coding] Test and fixed function with ISEWAN)
Created HT Pegasus manual. Taweesak Prumvised

07 Mar 2025

17:15 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Outbound picking process Priroj Neamjarn
17:15 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Outbound picking process Priroj Neamjarn
16:34 PT NIPPON KONPO INDONESIA 4.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Fix Master Location on AWS Nattaporn Chaiya
11:27 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Fix issues Dashboard On AWS Nattaporn Chaiya
11:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Dashboard for NKI and Install to Cloud AWS server Nattaporn Chaiya
11:19 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Dashboard for NKI Nattaporn Chaiya
11:18 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Export PDF Loading List Nattaporn Chaiya
11:18 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Export PDF Loading List Nattaporn Chaiya
11:01 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Export PDF Picking List Nattaporn Chaiya
11:29 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Fix issues Labels Nattaporn Chaiya
11:16 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
Take the project from the test test server to real server Nattaporn Chaiya
11:06 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
Create Manual document Web 2/2 Nattaporn Chaiya
11:06 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
Create Manual document Web 1/2 Nattaporn Chaiya
11:13 AH BRAKE (THAILAND) CO., LTD. 2.00 hours (Project progress work #898 (Closed): Dashboard)
Dasboard AHT 3/3 Nattaporn Chaiya
11:13 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #898 (Closed): Dashboard)
Dasboard AHT 2/3 Nattaporn Chaiya
11:13 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #898 (Closed): Dashboard)
Dasboard AHT 1/3 Nattaporn Chaiya
08:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #897 (Closed): Review and Revise documents of CKD systems)
[Task] LAT - PICS& CAPS - Review and Revise documents of PICS& CAPS System. 1/1 Thanthima Phaengkham

06 Mar 2025

17:39 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Outbound picking process Priroj Neamjarn
17:39 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Outbound picking process Priroj Neamjarn
11:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #897 (Closed): Review and Revise documents of CKD systems)
[Task] LAT - STEP & CYLC - Review and Revise documents of STEP & CYLC System. 1/1 Thanthima Phaengkham

05 Mar 2025

16:56 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Outbound picking process Priroj Neamjarn
16:56 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Outbound picking process Priroj Neamjarn
13:35 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #897 (Closed): Review and Revise documents of CKD systems)
[Task] LAT - REPO & STEP - Review and Revise documents of SALE System. 1/1 Thanthima Phaengkham
13:35 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #897 (Closed): Review and Revise documents of CKD systems)
[Task] LAT - SALE-Review and Revise documents of SALE System. 2/2 Thanthima Phaengkham
11:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #897 (Closed): Review and Revise documents of CKD systems)
[Task] LAT - SALE-Review and Revise documents of SALE System. 1/2 Thanthima Phaengkham
11:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - SALE system - Review the NULL BTR file for the SALE system. 7/7 Thanthima Phaengkham
11:29 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - SALE system - Review the NULL BTR file for the SALE system. 6/7 Thanthima Phaengkham
11:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - SALE system - Review the NULL BTR file for the SALE system. 5/7 Thanthima Phaengkham
11:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - SALE system - Review the NULL BTR file for the SALE system. 4/7 Thanthima Phaengkham
11:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - SALE system - Review the NULL BTR file for the SALE system. 3/7 Thanthima Phaengkham
11:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - SALE system - Review the NULL BTR file for the SALE system. 2/7 Thanthima Phaengkham
11:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - SALE system - Review the NULL BTR file for the SALE system. 1/7 Thanthima Phaengkham
11:19 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - REPO system - Review the NULL BTR file for the REPO system. 3/3 Thanthima Phaengkham
11:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - REPO system - Review the NULL BTR file for the REPO system. 2/3 Thanthima Phaengkham
11:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - REPO system - Review the NULL BTR file for the REPO system. 1/3 Thanthima Phaengkham
11:17 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - STEP system - Review the NULL BTR file for the STEP system. 6/6 Thanthima Phaengkham
11:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - STEP system - Review the NULL BTR file for the STEP system. 5/6 Thanthima Phaengkham
11:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - STEP system - Review the NULL BTR file for the STEP system. 4/6 Thanthima Phaengkham
11:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - PICS system - Irregular Test of Vanning. 1/1 Thanthima Phaengkham
11:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - STEP system - Review the NULL BTR file for the STEP system. 3/6 Thanthima Phaengkham
11:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - STEP system - Review the NULL BTR file for the STEP system. 2/6 Thanthima Phaengkham
11:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - STEP system - Review the NULL BTR file for the STEP system. 1/6 Thanthima Phaengkham
11:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - PICS system (Irregular Test) 1/2 Thanthima Phaengkham
11:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - CYLC system - Review the NULL BTR file for the CYLC system. 1/1 Thanthima Phaengkham
11:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - PICS system Check Base Label Format 2/2 , Check Send Data to AAT 1/1 Thanthima Phaengkham
11:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #896 (Closed): Application stability monitoring — fix errors)
[Task] LAT - PICS system Check Base Label Format 1/2 Thanthima Phaengkham

04 Mar 2025

17:44 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Move/Transfer process Priroj Neamjarn
17:44 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
-Coding Move/Transfer process Priroj Neamjarn

03 Mar 2025

17:06 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
Coding Move/Transfer process Priroj Neamjarn
17:06 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #895 (Closed): [Cording] Warehouse management system for NKI Handy Java)
Coding Move/Transfer process Priroj Neamjarn
 