17:36 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #829 (Closed): [Colding] C# linkage application of AS400)
-adjust linkage data windows application process FCT82T process FCT83T Priroj Neamjarn
17:36 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #829 (Closed): [Colding] C# linkage application of AS400)
-adjust linkage data windows application process FCT82T process FCT83T Priroj Neamjarn
17:06 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Ticket Labels page (100%), Outbound Page (60%) Nattaporn Chaiya
17:01 PORITE CORPORATION 8.00 hours (Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP)
Web Dashboard 1-6 page (100%) Worawit Khantamool
10:06 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(23/01) Training i-Reporter Sumitomo Rubber customer(2/2) Panthita Roekdee
10:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(22/01) Training i-Reporter Sumitomo Rubber customer(1/2) Panthita Roekdee
10:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(21/01) Outside meeting with Union Autoparts customer(Rayong) in morning and KDT customer in afternoon(Chonburi) Panthita Roekdee

23 Jan 2025

17:57 PT NIPPON KONPO INDONESIA 2.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Meeting online Tigger outbound flow with K.pai and K.Tea Nattaporn Chaiya
17:56 PT NIPPON KONPO INDONESIA 6.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Ticket Labels page (80%) Nattaporn Chaiya
17:33 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #829 (Closed): [Colding] C# linkage application of AS400)
-adjust linkage data windows application process FCT82T Priroj Neamjarn
17:33 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #829 (Closed): [Colding] C# linkage application of AS400)
Priroj Neamjarn
16:51 PORITE CORPORATION 8.00 hours (Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP)
Web Dashboard 1-6 page (80%) Worawit Khantamool

22 Jan 2025

23:14 PT NIPPON KONPO INDONESIA 6.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Tigger for outbound, Ticket Labels page (50%) Nattaporn Chaiya
23:13 MINEBEA ACCESSSOLUTIONS THAI LTD. 2.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
Internal test, Fix bug With K.Pairoj Nattaporn Chaiya
18:41 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
Internal test, Fix bug Priroj Neamjarn
18:41 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
Internal test, Fix bug Priroj Neamjarn
16:55 PORITE CORPORATION 8.00 hours (Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP)
Web Dashboard 1-6 page (70%) Worawit Khantamool

21 Jan 2025

19:42 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
Transfer in process Priroj Neamjarn
19:41 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
Transfer in process Priroj Neamjarn
17:02 PORITE CORPORATION 8.00 hours (Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP)
Web Dashboard 1-6 page (60%) Worawit Khantamool
16:59 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Finish Inbound Inquiry / Report, Edit view Inbound Schedule, Finish Stock Maintenance, Finish Stock Inquiry / Report,... Nattaporn Chaiya
10:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(20/01)Prepare for i-Reporter training(Sumitomo Rubber) Panthita Roekdee
10:45 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(18/01)Prepare for i-Reporter training(Sumitomo Rubber) Panthita Roekdee

20 Jan 2025

18:56 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Adjust Setup/Vanning Process,QGate Process Priroj Neamjarn
18:56 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Adjust Setup/Vanning Process,QGate Process Priroj Neamjarn
16:49 PORITE CORPORATION 8.00 hours (Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP)
Web Dashboard 1-6 page (50%) Worawit Khantamool
12:52 TOMAS TECH CO., LTD. 8.00 hours (Sales support #859 (New): SHINDENGEN operation monitoring system)
Meeting with DJK and customer about OEE Calculation/Tower light status Konlawat Saechee
09:55 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #885 (Closed): get requirement and create specification Doc. [Taping])
modify specification doc. and design screen layout. Soraya Norasing

19 Jan 2025

10:58 NIPPON KONPO (THAILAND) CO., LTD. 4.00 hours (Project progress work #751 (Closed): Design and get requirements)
Kittisak Isarapongporn
10:15 NIPPON KONPO (THAILAND) CO., LTD. 8.00 hours (Project progress work #751 (Closed): Design and get requirements)
Make document and meeting about spec confirm Kittisak Isarapongporn
10:57 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
10:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #874 (Closed): Kittisak Isarapongporn Taking Day off January-December 2024)
Kittisak Isarapongporn
10:14 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Meeting at on-site Kittisak Isarapongporn
08:56 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #892 (Closed): [Development] Enhance the web function and ui)
Adjust label layout and check printer issue today Kittisak Isarapongporn
08:52 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #892 (Closed): [Development] Enhance the web function and ui)
Improve import function and create manual check label generate Kittisak Isarapongporn
08:34 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #889 (Closed): [Testing] Test and conduct the test report)
Picking test at onsite Kittisak Isarapongporn

18 Jan 2025

17:38 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Develop Inbound Page Nattaporn Chaiya
16:55 PORITE CORPORATION 8.00 hours (Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP)
Web Dashboard 1-2 (100%) Worawit Khantamool
16:51 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Support the user in extracting actual stock data to generate labels for attaching to real items and initiating wareho... Ronnagon Kongsuwan
16:44 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
-Adjust Setup/Vanning Process Priroj Neamjarn
16:44 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
-Adjust Setup/Vanning Process Priroj Neamjarn
16:40 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #605 (Closed): [Coding] Warehouse management system Web app PHP Phase02)
Developed and completed update invoice in delivery note. Ronnagon Kongsuwan
16:38 NKT NIPPON KONPO (THAILAND) CO., LTD 4.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Meeting get requirement with K.Nack. Ronnagon Kongsuwan

17 Jan 2025

18:54 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
install the application Priroj Neamjarn
18:54 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
install the application Priroj Neamjarn
16:49 PT NIPPON KONPO INDONESIA 1.00 hour (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Meeting with K.Pai for tigger Inbound Nattaporn Chaiya
16:49 PT NIPPON KONPO INDONESIA 7.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Modify Import Outbound file nee format, Modify Stored Procedure Inbound Nattaporn Chaiya
16:47 PORITE CORPORATION 8.00 hours (Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP)
Web Dashboard (95%) Worawit Khantamool
16:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
Support i-Reporter Panthita Roekdee
08:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
(16/01)Prepare for i-Reporter training(Sumitomo Rubber), Create form i-Reporter demo(Musashi) and Meeting online Panthita Roekdee
10:33 ASIAN STANLEY. INTERNATIONAL LIMITED. 3.00 hours (Project progress work #885 (Closed): get requirement and create specification Doc. [Taping])
meeting with customer and design layout Soraya Norasing
10:32 ASIAN STANLEY. INTERNATIONAL LIMITED. 5.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
update system & test Soraya Norasing
10:31 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
Soraya Norasing
10:30 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
update program on handy & onsite support Soraya Norasing
10:29 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Meeting Asprova system at NTPT Soraya Norasing
10:28 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
modify manual and fix bug Soraya Norasing
10:27 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
modify manual Soraya Norasing

16 Jan 2025

22:39 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Page Import Type Delivery Plan. Ronnagon Kongsuwan
22:38 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Page Import Type ReceivePlan. Ronnagon Kongsuwan
22:37 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Item Master. Ronnagon Kongsuwan
22:36 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Supplier Master. Ronnagon Kongsuwan
22:36 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Customer Master. Ronnagon Kongsuwan
22:29 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed and completed Page Inbound Material function Material Receive. Ronnagon Kongsuwan
22:28 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed Page Inbound Material function Material Receive. Ronnagon Kongsuwan
22:27 NKT NIPPON KONPO (THAILAND) CO., LTD 8.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
Developed Material Receive QC Ronnagon Kongsuwan
22:34 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #605 (Closed): [Coding] Warehouse management system Web app PHP Phase02)
Developed and Testing Change Format Label Lotsize customer request add qty and box number. Ronnagon Kongsuwan
22:29 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Add a menu view for accessing the Inbound and Outbound pages Nattaporn Chaiya
09:58 PT NIPPON KONPO INDONESIA 8.00 hours (Project progress work #845 (Closed): [Cording] Warehouse management system for NKI PHP)
Modify Stored Procedure Inbound Nattaporn Chaiya
22:25 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Training the MRP function with the customer and adding actual stock into the system. Ronnagon Kongsuwan
16:53 PORITE CORPORATION 8.00 hours (Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP)
Web Dashboard (85%) Worawit Khantamool
16:47 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
NG Manual -Transfer in process Priroj Neamjarn
16:47 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
NG Manual -Transfer in process Priroj Neamjarn
16:44 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
install the application. Priroj Neamjarn
16:44 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
install the application. Priroj Neamjarn

15 Jan 2025

17:09 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
NG Manual, Transfer in process Priroj Neamjarn
17:08 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
NG Manual, Transfer in process Priroj Neamjarn
16:52 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #690 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
modify by testing result Thiraporn Amornsirinukorh
16:52 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #690 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
modify by testing result Thiraporn Amornsirinukorh
16:51 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 7.00 hours (Project progress work #690 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
On-site meeting with client Thiraporn Amornsirinukorh
16:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #891 (New): For internal meeting and other)
Support i-Reporter Panthita Roekdee
16:50 PORITE CORPORATION 8.00 hours (Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP)
Web Dashboard (70%) Worawit Khantamool
16:49 PORITE CORPORATION 8.00 hours (Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP)
Web Dashboard (60%) Worawit Khantamool
16:48 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 2.00 hours (Project progress work #506 (Closed): [Coding] Warehouse management system Web app PHP)
Data import for test Thiraporn Amornsirinukorh
16:47 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 2.00 hours (Project progress work #506 (Closed): [Coding] Warehouse management system Web app PHP)
Data import for test Thiraporn Amornsirinukorh
16:47 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 2.00 hours (Project progress work #506 (Closed): [Coding] Warehouse management system Web app PHP)
Data import for test Thiraporn Amornsirinukorh
16:46 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
install the application. Priroj Neamjarn
16:46 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
install the application. Priroj Neamjarn
13:26 MINEBEA ACCESSSOLUTIONS THAI LTD. 5.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
Role admin must issues on both WH/PD (100%) Nattaporn Chaiya
 