04 Jan 2025
- 17:10 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Modify Web (100%)
- 16:29 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
- Production outbound, Outbound manual
- 16:29 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
- Production outbound, Outbound manual
- 16:07 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter
- 16:07 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- (03/01) Support i-Reporter
- 14:52 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #605 (Closed): [Coding] Warehouse management system Web app PHP Phase02)
- Improve error catch report for import file.
03 Jan 2025
- 17:25 NKT NIPPON KONPO (THAILAND) CO., LTD 4.00 hours (Project progress work #828 (In Progress): [Cording] Warehouse system for business improvement for NKT PHP)
- Read the document and install the database, then deploy the code to the website on the cloud.
- 17:20 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
- Develop Test Scenarios document 80%
- 17:19 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #605 (Closed): [Coding] Warehouse management system Web app PHP Phase02)
- Change Label lotsize and format add quatity, total_boxs
- 16:53 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Modify Web (95%)
- 16:33 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
- Work outbound
- 16:33 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
- Work outbound
- 16:28 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #877 (Closed): [Coding] Test and fixed function with ISEWAN)
- Testing and fixed issues after test with ISEWAN#4.
- 08:29 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- (27/12)Support i-Reporter
27 Dec 2024
- 18:23 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
- Develop Tag Label page 100%
- 16:34 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
- inbound manual
- 16:34 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
- inbound manual
- 13:30 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #690 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Inbound Inquiry Report
26 Dec 2024
- 23:05 YAMATO ELECTRIC (THAILAND) CO., LTD. 1.00 hour (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- 19:12 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #781 (Closed): [Colding] Web application PHP)
- Develop Tag Label page 80%
- 16:53 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
- Import master data to server (Denso project), Go to Thai Stanley
- 16:52 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #782 (Closed): [Colding] Web application Android)
- Import master data to server (Denso project)
- 13:25 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #505 (Closed): [Coding] Warehouse management system handyterminal Java)
- Add project and setup environment.
- 13:22 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #877 (Closed): [Coding] Test and fixed function with ISEWAN)
- Testing and fixed issues after test with ISEWAN#3.
- 13:16 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter
- 10:09 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #849 (Closed): EE Drawing deisgn)
- Drawing EE and PO
- 10:08 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #849 (Closed): EE Drawing deisgn)
- Drawing EE and PO
- 10:03 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #849 (Closed): EE Drawing deisgn)
- Drawing EE
- 10:02 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #849 (Closed): EE Drawing deisgn)
- Drawing EE
- 10:02 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #849 (Closed): EE Drawing deisgn)
- Drawing EE
- 09:30 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #849 (Closed): EE Drawing deisgn)
- Drawing EE
- 09:30 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #849 (Closed): EE Drawing deisgn)
- Drawing EE
- 10:07 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #835 (Closed): EE Drawing deisgn)
- Drawing EE
- 10:07 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #835 (Closed): EE Drawing deisgn)
- Drawing EE
- 10:07 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #835 (Closed): EE Drawing deisgn)
- Drawing EE
- 10:06 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #835 (Closed): EE Drawing deisgn)
- Drawing EE
- 10:05 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #835 (Closed): EE Drawing deisgn)
- Drawing EE and PR
- 10:04 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #835 (Closed): EE Drawing deisgn)
- Drawing EE and PR
- 09:32 SUMITOMO RUBBER (THAILAND) CO., LTD. 8.00 hours (Project progress work #816 (Closed): [Colding] i-Reporter development)
- Online support about trainning i-Reporter
- 09:31 SUMITOMO RUBBER (THAILAND) CO., LTD. 4.00 hours (Project progress work #816 (Closed): [Colding] i-Reporter development)
- On-site support trainning
- 09:29 SUMITOMO RUBBER (THAILAND) CO., LTD. 8.00 hours (Project progress work #816 (Closed): [Colding] i-Reporter development)
- Installation&On-site support
- 09:30 OTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #596 (Closed): [Requirement and support] Infrastructure IoT system for OTICS(Thailand))
- Modify raspberry pi for dashboard
- 09:28 TOMAS TECH CO., LTD. 8.00 hours (Sales support #798 (New): Site survey customer for new project)
- Check control panel of PJ Taceability system AS004 for ADVICS
- 09:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:27 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:26 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- On-site support Test Application on Handy
- 09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:11 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 08:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 08:51 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 08:51 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 08:51 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Installation&On-site support
- 09:16 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
- On-site support
- 08:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
- Installation&On-site support
- 08:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
- Installation&On-site support
- 08:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
- Installation&On-site support
- 08:49 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
- Installation&On-site support
- 08:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
- Installation&On-site support
- 08:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
- Installation&On-site support
- 08:48 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #263 (Closed): [Requirement definition] Handy terminal stock management system for Pegasus)
- Installation&On-site support
- 09:13 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- Installation&On-site support
- 09:13 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- Installation&On-site support
- 09:13 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- Installation&On-site support
- 09:07 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Project progress work #23 (Closed): Addition to function skip process)
- On-site support traceability data
- 09:07 ATA CASTING TECHNOLOGY CO., LTD. 8.00 hours (Project progress work #23 (Closed): Addition to function skip process)
- On-site support traceability data
- 09:06 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #806 (New): Estimate cost)
- Drawing EE signal I/O for AHT CNC
- 09:00 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #806 (New): Estimate cost)
- Drawing EE signal I/O for AHT CNC
- 08:37 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #806 (New): Estimate cost)
- Drawing Layout control panel
- 08:54 KEYENCE (THAILAND) CO., LTD. 8.00 hours (Project progress work #875 (Closed): Assy and Wiring)
- test power on and program
- 08:53 KEYENCE (THAILAND) CO., LTD. 8.00 hours (Project progress work #875 (Closed): Assy and Wiring)
- Wiring cabinet
- 08:33 KEYENCE (THAILAND) CO., LTD. 8.00 hours (Project progress work #875 (Closed): Assy and Wiring)
- Wiring cabinet
- 08:33 KEYENCE (THAILAND) CO., LTD. 8.00 hours (Project progress work #875 (Closed): Assy and Wiring)
- Assy and Wiring
- 08:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #523 (New): Phatthadon Inthachot Taking Day off January-December 2024)
- Day off
- 08:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas Gateway for get data between FormA and FormB
- 08:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas Gateway for get data between FormA and FormB
- 08:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas Gateway for get data between FormA and FormB
- 08:46 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas Gateway for get data between FormA and FormB
- 08:45 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas Gateway for get data between FormA and FormB
- 08:45 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas Gateway for get data between FormA and FormB
- 08:45 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- ConMas Gateway for get data between FormA and FormB
- 08:45 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Handy A-500 and app i-Reporter connected demo of MAST-T
- 08:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Handy A-500 and app i-Reporter connected demo of MAST-T
- 08:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Modify i-Reporter ConMas Gateway
- 08:44 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Modify i-Reporter ConMas Gateway
- 08:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Modify i-Reporter ConMas Gateway
- 08:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Modify i-Reporter ConMas Gateway
- 08:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Modify i-Reporter ConMas Gateway
- 08:43 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Modify i-Reporter ConMas Gateway
- 08:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Installation i-Reporter for Demo ConMas Gateway
- 08:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Installation i-Reporter for Demo ConMas Gateway
- 08:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #284 (Closed): ConMas i-Reporter create teaching document into Thai)
- Installation i-Reporter for Demo ConMas Gateway
- 08:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #876 (Closed): Check Power meter)
- Check Power meter
- 08:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #876 (Closed): Check Power meter)
- Check Power meter
- 08:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #876 (Closed): Check Power meter)
- Check Power meter
- 08:46 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #876 (Closed): Check Power meter)
- Check Power meter
- 08:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
- Meeting & Survey on-site
- 08:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #801 (Closed): EKD system phase 4)
- Setup Camera
- 08:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #801 (Closed): EKD system phase 4)
- Setup Camera
- 08:35 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #362 (Closed): NX Shoji meeting with Iwamoto)
- Meeting & Survey on-site
- 08:34 STARS TECHNOLOGIES INDUSTRIAL LTD. 4.00 hours (Project progress work #272 (Closed): Proposal our company for MD)
- Meeting & Survey on-site
- 08:29 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #729 (Closed): [ Installation & On-site support] Hardware installation for IoT Loss analysis MOC and Packing process Line 1,2)
- Support installation
- 08:27 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #800 (Closed): [Area1] Camera control system)
- Wiring cabinet