- 20:12 TOMAS TECH CO., LTD. 8.00 hours (Sales support #695 (Closed): Concept install label print and collection signal machine)
- table stand label printer
- 20:05 TOMAS TECH CO., LTD. 4.00 hours (Sales support #695 (Closed): Concept install label print and collection signal machine)
- Drawing table stand label printer
- 20:10 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #667 (Closed): [Coding] Production line IoT monitoring system Keyence of PLC)
- Meeting and Standby
- 20:06 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #811 (Closed): keyence Demo kit No.259)
- Drawing
- 19:57 TOMAS TECH CO., LTD. 8.00 hours (Sales support #834 (Closed): ADVICS Table Server)
- 3D design
- 17:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #810 (Closed): Coding BackEnd New Menu)
- Coding Backend Overall Chart
- 17:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #810 (Closed): Coding BackEnd New Menu)
- Coding Backend Overall Chart
- 17:08 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Finish System manual
- 16:52 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Testing on site isewan #2.
- 16:51 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
- Modify Dashboard Weekly cost bar chart
- 16:46 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #814 (Closed): [Colding] Packing system for C# application)
- Develop Packing Software.
- 16:35 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Packing daily summary report
- 16:35 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Packing daily summary report
28 Nov 2024
- 17:42 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add show all.
- 15:30 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Fixed upload and download image.
- 17:41 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 6.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- 1. Go to office get hardware to site. / Test connect ftp to aws.
- 15:31 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Test and fixed on new host AWS.
- 17:37 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 3.00 hours (Project progress work #743 (Closed): Development EDI system)
- Create System manual
- 17:15 EBISU FOODS CO., LTD. 2.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Goods Issue / Goods Receipt >> Add U_goodsIssueNo / U_GoodsReceiptNo for new key >> use as productionSchedule.order_no
- 17:12 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- config new address / fix bug / test with ASUTO
- 16:48 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
- Modify Dashboard Daily cost bar chart
- 15:17 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #503 (Closed): [Coding] Infrastructure IoT system for OTICS(Thailand) PHP)
- On site (1/1)
- 16:47 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #814 (Closed): [Colding] Packing system for C# application)
- Develop Packing Software.
- 07:58 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #814 (Closed): [Colding] Packing system for C# application)
- Check Addition Packing Software Spec.
- 16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Packing daily summary report
- 16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Packing daily summary report
- 09:49 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Q-Point detail report
- 09:49 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Q-Point detail report
- 15:30 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #833 (In Progress): [TMS-Calling] Web development.)
- Web theme migration (1/10)
- 15:17 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Edit additional web page information (1/1)
- 15:16 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (11/11)
- 15:15 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (10/11)
- 15:15 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (9/11)
- 15:15 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (8/11)
- 15:15 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (7/11)
- 15:13 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (6/9)
- 15:13 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (5/9)
- 15:13 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (4/9)
- 15:12 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (3/9)
- 15:12 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (2/9)
- 15:12 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- Web Develop (1/9)
- 15:11 NTN MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP)
- On site (1/1)
- 15:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #832 (Closed): Demo Pegasus)
- 3D Production Monitoring (3/3)
- 15:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #832 (Closed): Demo Pegasus)
- 3D Production Monitoring (2/3)
- 15:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #832 (Closed): Demo Pegasus)
- 3D Production Monitoring (1/3)
- 15:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #832 (Closed): Demo Pegasus)
- Demo Dashboard (3/3)
- 15:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #832 (Closed): Demo Pegasus)
- Demo Dashboard (2/3)
- 15:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #832 (Closed): Demo Pegasus)
- Demo Dashboard (1/3)
- 15:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (20/25)
- 14:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (19/25)
- 14:58 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (18/25)
- 14:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (17/25)
- 14:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (16/25)
- 14:57 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (15/25)
- 14:56 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (14/25)
- 14:56 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (13/25)
- 14:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (12/25)
- 14:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (11/25)
- 14:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end (10/25)
- 14:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Electric Summary BackEnd (2/5)
- 14:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Electric Summary BackEnd (1/5)
- 14:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Manage Target (2/2)
- 14:53 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Manage Target (1/2)
- 14:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end
- 14:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end
- 14:51 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end
- 14:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end
- 14:50 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Develop back end
- 14:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Production Monitoring UI (4/4)
- 14:49 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Manage Peak Rate UI (1/1)
- 14:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Alarm Analysis UI (2/2)
- 14:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Alarm Analysis UI (1/2)
- 14:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Production Monitoring UI (3/3)
- 14:47 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #831 (Closed): Create a website)
- Production Monitoring UI (2/3)
- 14:59 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #830 (Closed): Web theme migration)
- Stock Inventory Report (2/3)
- 14:59 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #830 (Closed): Web theme migration)
- Stock Inventory Report (1/3)
- 14:59 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #830 (Closed): Web theme migration)
- Puchase Instructions Export PDF(1/2)
- 14:41 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #830 (Closed): Web theme migration)
- Stock Inventory Report UI (2/3)
- 14:40 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #830 (Closed): Web theme migration)
- Stock Inventory Report UI (1/3)
- 14:39 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #830 (Closed): Web theme migration)
- Puchase Instructions Export PDF
- 12:54 MINEBEA ACCESSSOLUTIONS THAI LTD. 5.00 hours (Project progress work #762 (Closed): Fix web problems)
- Fix issues stocktaking
- 09:43 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #762 (Closed): Fix web problems)
- Fix issues stocktaking
- 09:23 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- (27/11)Support i-Reporter, Create i-Reporter form(Minebea)
- 09:19 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed the Stock Inventory Report page and fixed one bug identified after receiving requirements from the user.
- 09:16 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- training production assy import plan and support user
- 09:14 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- training werehouse import po and support user
- 09:10 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- modify backend triger database and storedprocedure gen plan for handdy and support user
- 09:08 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- user add new requiredment modify website.
- 09:03 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Trial day 2 present Bom
- 09:02 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Trial day 1 present function website
- 08:20 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #811 (Closed): keyence Demo kit No.259)
- Meeting Assemble and Wiring
- 08:19 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #811 (Closed): keyence Demo kit No.259)
- Assemble and Wiring
- 08:17 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #524 (New): Konlawat Saechee Taking Day off January-December 2024)
- Take leave
26 Nov 2024
- 16:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add dowload image and test overall function.
- 16:54 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Check function EDI system on server customer and fix bug
- 16:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #810 (Closed): Coding BackEnd New Menu)
- Coding backend meter capacity and bekido
- 16:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- PC Schedule Outer, Schedule Vanning
- 16:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- PC Schedule Outer, Schedule Vanning
- 16:30 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Install HT Software.
- 13:59 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- 13:54 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- modify HT and support usert
- 13:52 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- modify HT and support usert
- 13:52 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- modify HT and support usert
- 13:52 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- modify HT and support usert
- 13:56 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- modify HT
- 13:55 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- modify HT and create document manual
- 12:31 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter, Create i-Reporter form
- 09:57 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #752 (Closed): Install HT Software and Server Onsite.)
- Training HT Software.
25 Nov 2024
- 22:14 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- 17:19 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #762 (Closed): Fix web problems)
- Stocktaking Identify display issues
- 16:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add upload image function on mobile app.
- 16:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #810 (Closed): Coding BackEnd New Menu)
- Coding backend miter capacity
- 16:37 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #810 (Closed): Coding BackEnd New Menu)
- Fix Frontend Overall Chart
- 16:19 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- PC Schedule Outer, Schedule Vanning
- 16:18 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- PC Schedule Receive, Schedule Staging, Schedule Inner
- 14:32 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter
24 Nov 2024
- 18:06 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 11/15
- 18:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 10/15
- 18:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 9/15
- 18:04 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 8/15
- 18:04 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 7/15
- 18:04 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 6/15
22 Nov 2024
- 16:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add task modification page.
- 16:46 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 8.00 hours (Project progress work #752 (Closed): Install HT Software and Server Onsite.)
- Make HT Software Manual.
- 16:32 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #807 (Closed): Coding Frontend New Menu )
- Coding Frontend Overall Chart
- 16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- -PC Schedule Receive, Schedule Staging, Schedule Inner
- 16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- -PC Schedule Receive, Schedule Staging, Schedule Inner
- 16:24 MINEBEA ACCESSSOLUTIONS THAI LTD. 7.00 hours (Project progress work #762 (Closed): Fix web problems)
- Create new record schedule outbound
- 16:05 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 1.00 hour (Project progress work #506 (Closed): [Coding] Warehouse management system Web app PHP)
- Create work directory for pegasus
- 16:04 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 1.00 hour (Project progress work #506 (Closed): [Coding] Warehouse management system Web app PHP)
- Meeting / Brief / Spec with K.Nack and K.Pai
- 11:30 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter
- 08:31 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3d printer,wiring,assemble,Arduino program
- 08:25 TOMAS TECH CO., LTD. 8.00 hours (Sales support #809 (Closed): METALEX 2024)
- Booth setup
21 Nov 2024
- 17:26 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 1.00 hour (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- bug fix / preparation for test
- 17:26 EBISU FOODS CO., LTD. 2.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Schedule inbound / outbound
- 16:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add caller and test task fucntion.
- 16:50 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Edit Tag Receive label
- 16:50 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Edit Tag Receive label
- 16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Install HT Software.
- 16:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #807 (Closed): Coding Frontend New Menu )
- Coding Frontend Overall Chart
- 16:26 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 3.00 hours (Project progress work #743 (Closed): Development EDI system)
- Check DB on server customer and install EDI system on server test
- 15:01 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #808 (Closed): Test connecting PLC with BTA500)
- support k.pai
- 14:59 HAMADEN MEXICO S.A.DE C.V 4.00 hours (Project progress work #808 (Closed): Test connecting PLC with BTA500)
- support k.pai
- 14:54 HAMADEN MEXICO S.A.DE C.V 4.00 hours (Project progress work #808 (Closed): Test connecting PLC with BTA500)
- support k.pai test connecting PLC
- 14:53 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #808 (Closed): Test connecting PLC with BTA500)
- support k.pai test connecting PLC
- 14:58 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3d printer
- 14:56 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3d printer
- 10:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
- programming of demo
- 10:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #718 (In Progress): Machine operation monitoring for KAWASAKI)
- programming of demo
- 10:38 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #729 (Closed): [ Installation & On-site support] Hardware installation for IoT Loss analysis MOC and Packing process Line 1,2)
- Support Installation
- 10:38 AH BRAKE (THAILAND) CO., LTD. 9.00 hours (Project progress work #729 (Closed): [ Installation & On-site support] Hardware installation for IoT Loss analysis MOC and Packing process Line 1,2)
- Support Installation
- 10:37 AH BRAKE (THAILAND) CO., LTD. 10.50 hours (Project progress work #729 (Closed): [ Installation & On-site support] Hardware installation for IoT Loss analysis MOC and Packing process Line 1,2)
- Support Installation
- 10:11 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter
- 09:28 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #762 (Closed): Fix web problems)
- Create new record schedule inbound
20 Nov 2024
- 17:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add caller function on mobile application.
- 16:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- Install HT Software.
- 16:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #807 (Closed): Coding Frontend New Menu )
- Coding Frontend Bekido Chart and Fix Frontend Electric Summary
- 16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Vanning Finish Case (Tablet)
- 16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Vanning Finish Case (Tablet)
- 15:06 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #760 (Closed): Production Control Budomari Information board (Display))
- Display 1 & Display 2 Query fixed
- 14:06 EBISU FOODS CO., LTD. 3.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- bug fix and testing
- 14:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter
- 13:58 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- test / fixed / config / add new response for api
- 09:56 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #762 (Closed): Fix web problems)
- Create new record Departmant master data
Also available in: Atom