- 16:19 A.N.I. LOGISTICS, LTD. Project progress work #739: [Development] CKD process system phase4
- today
-Vanning Finish Case (Handy)
-Vanning Finish Case (Tablet)
tomorrow
-Edit Tag Receive label
-PC Schedule R... - 08:05 TOMAS TECH CO., LTD. Project progress work #714: For internal meeting and other
- (19/11)Support i-Reporter, Other(in office)
18 Nov 2024
- 21:53 AH BRAKE (THAILAND) CO., LTD. Project progress work #499 (In Progress): [Coding] MT MOC Line IoT system for AH Brake
- 16:35 A.N.I. LOGISTICS, LTD. Project progress work #739: [Development] CKD process system phase4
- today
-Setup Finish Case (Handy)
-Setup Finish Case (Tablet)
tomorrow
-Vanning Finish Case (Handy)
-Vanning Fini... - 15:53 TOMAS TECH CO., LTD. Project progress work #714: For internal meeting and other
- (18/11)Support i-Reporter NTPT
- 08:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #807 (In Progress): Coding Frontend New Menu
- 08:26 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #807 (Closed): Coding Frontend New Menu
- New Menu
- overall
- meter capacity
- bekido - 00:42 TOMAS TECH CO., LTD. Project progress work #806 (New): Estimate cost
- - Estimate cost for new project
- 00:37 KEYENCE (THAILAND) CO., LTD. Project progress work #805 (Closed): PR Electrical part for demo No.259
- - PR Electrical
17 Nov 2024
- 23:42 TOMAS TECH CO., LTD. Project progress work #804 (Closed): NTN concept panel
- - Drawing
- 23:39 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #803 (Closed): [Documentation] Get requirements of project
- 23:35 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #753 (In Progress): Process Management System [Design & Get requirements]
- 23:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #759 (In Progress): STEP - Installation
- 23:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #758 (In Progress): PICS - Installation
- 23:22 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #754 (In Progress): [Design] Design and consult
- 23:19 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #494 (Confirmation request): STEP - Version upgrade development support
- 23:18 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #734 (Confirmation request): PICS - Handy Terminal - Test confirmation
- 22:56 DAIFUKU (THAILAND) LTD. Project progress work #802 (Closed): [Area3] Camera control system
- - Installation
- 22:53 A.N.I. LOGISTICS, LTD. Project progress work #801 (Closed): EKD system phase 4
- - Installation
- 22:42 DAIFUKU (THAILAND) LTD. Project progress work #800 (Closed): [Area1] Camera control system
- - Check part
- Installation - 22:33 OTICS (THAILAND) CO., LTD. Project progress work #799 (Confirmation request): Check Power meter
- 22:32 OTICS (THAILAND) CO., LTD. Project progress work #799 (Closed): Check Power meter
- Check Power meter
- 21:16 TOMAS TECH CO., LTD. Sales support #798 (New): Site survey customer for new project
- Site survey for new project
16 Nov 2024
- 22:17 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #593: [Coding] Warehouse management system handyterminal Java
- 1. Rework NG
- Confirm K.Chatree about choose the way to do
1. Add confirm print or not print
2. Do not pr... - 22:15 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #797 (In Progress): [Installation] HT_YDT WMS
- 22:14 YAMATO ELECTRIC (THAILAND) CO., LTD. Project progress work #797 (Closed): [Installation] HT_YDT WMS
- - Install program on handy
- Set up handy & printer
- UAT
- Trainning User
- Support User - 22:05 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #784 (In Progress): [Colding] Handy terminal BT-A500 Java application (Process Control System)
- 10:31 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System)
- 16:44 A.N.I. LOGISTICS, LTD. Project progress work #739: [Development] CKD process system phase4
- today
-Setup Finish Case (Handy)
tomorrow
-Setup Finish Case (Tablet)
-Vanning Finish Case (Handy)
-Vanning Fini... - 16:20 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #796 (Confirmation request): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set
- 16:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set
- - Assembly Hardware and wiring
- 12:23 ASIAN STANLEY. INTERNATIONAL LIMITED. Parent project #568 (Closed): [PJ230006]Uninterruptible Power System
- 12:23 ASIAN STANLEY. INTERNATIONAL LIMITED. Parent project #560 (Closed): [PJ230033]Label printing system concept1
- 12:23 ASIAN STANLEY. INTERNATIONAL LIMITED. Parent project #552 (Closed): [PJ240005]Handy terminal Process control system create 3 screen and wiring
- 12:23 ASIAN STANLEY. INTERNATIONAL LIMITED. Parent project #550 (Closed): [PJ230038]Handy terminal Process control system Screen program change/additional
- 12:22 ASIAN STANLEY. INTERNATIONAL LIMITED. Sales support #72 (In Progress): Request the Windows server 2022 standard/ MSSQL2022 standard license
- 12:21 ASIAN STANLEY. INTERNATIONAL LIMITED. Problem-Bug #74 (Closed): Request to add 2 access points on the low signal area. Wiring is also need.
- 12:20 ASIAN STANLEY. INTERNATIONAL LIMITED. Parent project #546 (Closed): [PJ240016]Handy terminal Process control system addtional line
- 11:23 TOMAS TECH CO., LTD. Project progress work #519 (Closed): Jidapha Mangkhachot Taking Day off January-December 2024
- 11:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #663 (Closed): PICS - Specification creation
- 11:23 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #647 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app
- 11:22 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #470 (Closed): Packing List System
- 11:18 THAI METALTECH CO., LTD. Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1
- 11:18 TOMAS TECH CO., LTD. Project progress work #678 (Closed): LEGO
- 11:17 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. Project progress work #707 (Closed): Modify Webpegasus.
- 11:16 ADVICS MANUFACTURING (THAILAND) CO., LTD. Problem-Bug #716 (Closed): PLC data clear error
- 11:16 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #725 (Closed): Infrastructure IoT dashboard / Backend
- 11:16 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #755 (Closed): Develop PC Software.
- 11:08 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #477 (Closed): [Coding]ASI - Process Control System Phase2 -C# Windows app
- 10:45 AH BRAKE (THAILAND) CO., LTD. Project progress work #601 (Closed): [Requirement definition] MT MOC Line IoT system for Line 1 & Line 2
- 10:42 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #733 (Closed): Design and documentation
- 10:39 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Project progress work #795 (Closed): [Colding] Handy terminal BT-W350 C# application
- 10:37 SIAM NITORI Co., Ltd. Project progress work #794 (New): [Setup] Asprova production schedule tools
- 10:36 SIAM NITORI Co., Ltd. Parent project #793 (New): [PJ240050] Production planning software Asprova phase02 Support 80h
- 10:34 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #792 (Closed): [Install] Wring install surpport
- 10:34 ASIAN STANLEY. INTERNATIONAL LIMITED. Parent project #791 (Closed): [PJ240047] Handy terminal Process control system Taping Equipment add wiring
- 10:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #790 (Closed): [Colding] Handy terminal BT-A500 Java application [Calling maintenance staff system]
- Calling maintenance staff system
- 10:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Parent project #789 (Closed): [PJ240043] Calling maintenance staff concept2 Handy terminal + Tablet
- 10:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #788 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing classify rank system]
- 10:33 ASIAN STANLEY. INTERNATIONAL LIMITED. Parent project #787 (Closed): [PJ240044] Label printing system for Taping machine modification
- 10:31 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #786 (Closed): [Colding] Handy terminal BT-A500 Java application [Label printing system (Taping)]
- 10:31 ASIAN STANLEY. INTERNATIONAL LIMITED. Parent project #785 (Closed): [PJ240046] Handy terminal Process control system modification
- 10:30 ASIAN STANLEY. INTERNATIONAL LIMITED. Parent project #783 (Closed): [PJ240045] Label printing classify rank system
- 09:57 TOMAS TECH CO., LTD. Project progress work #714: For internal meeting and other
- (16/11)Support i-Reporter NTPT
- 09:06 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD Parent project #606 (In Progress): [PJ240026] Web app Daily check project
- 08:32 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #782 (Closed): [Colding] Web application Android
- 08:30 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #781 (Closed): [Colding] Web application PHP
- 08:25 MINEBEA ACCESSSOLUTIONS THAI LTD. Parent project #780 (Closed): [PJ240051] Inbound Outbound Management System for MAST Handy terminal
- 08:08 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #779 (Closed): [Colding] PLC program development work Keyence
- 08:07 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #778 (Closed): [Colding] PLC program development work C#
- 08:04 NTN MANUFACTURING (THAILAND) CO., LTD. Project progress work #777 (Closed): [Colding] Front-End Web dashboard application PHP
- 08:03 NTN MANUFACTURING (THAILAND) CO., LTD. Parent project #776 (New): [PJ240052] Infrastructure IoT system for NTN Manufacturing (Thailand) Hardware Soi6 PT Soi3
- 08:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #648 (Confirmation request): Check HT Software.
- 08:01 OTICS (THAILAND) CO., LTD. Parent project #538 (In Progress): [PJ240020] Infrastructure IoT system for OTICS(Thailand)
- 08:00 MAX(THAILAND)CO.,LTD. Parent project #775 (Closed): [PJ240048] Bus dispatch system annual MA support
- 07:59 MAX(THAILAND)CO.,LTD. Parent project #582 (Closed): [PJ210031]Bus dispatch system Specifications
- 07:58 SHINDENGEN (THAILAND) CO., LTD. Project progress work #774 (New): [Colding] Front-end Web dashboard application PHP
- 07:57 SHINDENGEN (THAILAND) CO., LTD. Parent project #773 (Closed): [PJ240054] Operation monitoring system for ShinDengen
15 Nov 2024
- 22:40 ADVICS MANUFACTURING (THAILAND) CO., LTD. Project progress work #772 (Closed): [Colding] C# traceability program
- 22:39 ADVICS MANUFACTURING (THAILAND) CO., LTD. Project progress work #771 (Closed): [Colding] PLC traceability program
- 22:38 ADVICS MANUFACTURING (THAILAND) CO., LTD. Parent project #770 (Closed): [PJ240049] Traceability system AS0004 program Keyence for ADVICS Manufacturing(Thailand)Co.,Ltd.
- 22:37 PORITE CORPORATION Project progress work #769 (Closed): [Colding] Web dashboard application PHP back end and C#
- 22:34 PORITE CORPORATION Project progress work #768 (Closed): [Colding] Front-End Web dashboard application PHP
- 22:33 PORITE CORPORATION Parent project #767 (New): [PJ240057] IoT management system
- 22:31 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. Project progress work #766 (Closed): [Colding] Auto data correcting system for MCCT Windows from app
- - UI 100%
- Function Integrate
1. Setting 100%
2. Login & Authenticate 100%
3. Connection information 60%
... - 22:30 MHI AUTOMOTIVE CLIMATE CONTROL THAILAND CO., LTD. Parent project #765 (Closed): [PJ240056] Auto data correcting system for MCCT
- 17:29 TOMAS TECH CO., LTD. Project progress work #714: For internal meeting and other
- (15/11)Support i-Reporter NTPT
- 16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #735 (Confirmation request): PICS handy terminal Document.
- Make Document HT Software.
- 16:32 A.N.I. LOGISTICS, LTD. Project progress work #739: [Development] CKD process system phase4
- today
-Setup Finish Case (Handy)
tomorrow
-Setup Finish Case (Handy)
-Setup Finish Case (Tablet) - 09:04 FTS AUTOMOTIVE (THAILAND) CO.,LTD Project progress work #764 (New): FTP DATA LOGGING
- FTP DATA LOGGING
- 09:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING
- DASHBOARD DESIGN AND PROGRAMMING
14 Nov 2024
- 17:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #735: PICS handy terminal Document.
- Make Document HT Software.
KDPA2000 (80 %)
KDPA4000 (80 %)
KDPL1000 (75 %)
KDPP2000 (55 %)
KDPP5000 (55 %)
KDPP... - 16:51 A.N.I. LOGISTICS, LTD. Project progress work #739: [Development] CKD process system phase4
- today
-Setup Finish Case (Handy)
tomorrow
-Setup Finish Case (Handy)
-Setup Finish Case (Tablet) - 08:52 TOMAS TECH CO., LTD. Project progress work #714: For internal meeting and other
- (14/11)Support i-Reporter NTPT
13 Nov 2024
- 16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #735: PICS handy terminal Document.
- Make Document HT Software.
KDPA2000 (80 %)
KDPA4000 (80 %)
KDPL1000 (75 %)
KDPP2000 (55 %)
KDPP5000 (55 %)
KDPP... - 16:34 A.N.I. LOGISTICS, LTD. Project progress work #739: [Development] CKD process system phase4
- today
-Move Finish Case (Handy)
-Setup Finish Case (Handy)
tomorrow
-Setup Finish Case (Handy)
-Setup Finish Cas... - 08:09 TOMAS TECH CO., LTD. Project progress work #714: For internal meeting and other
- (13/11)Meeting with customer (I-PEX)., Support i-Reporter NTPT
12 Nov 2024
- 16:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #735: PICS handy terminal Document.
- Make Document HT Software.
KDPA2000 (80 %)
KDPA4000 (80 %)
KDPL1000 (75 %)
KDPP2000 (55 %)
KDPP5000 (55 %)
KDPP... - 16:43 A.N.I. LOGISTICS, LTD. Project progress work #739: [Development] CKD process system phase4
- today
-Receive Finish Case (Tablet)
-Move Finish Case (Handy)
tomorrow
-Move Finish Case (Handy)
- 13:45 TOMAS TECH CO., LTD. Project progress work #714: For internal meeting and other
- (12/11)Support i-Reporter NTPT
- 11:00 MINEBEA ACCESSSOLUTIONS THAI LTD. Project progress work #762 (Closed): Fix web problems
- 1. Add the create new record on screen function
- Schedule Inbound/Outbound
- Master data
-- Supplier Master
... - 09:26 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #733 (Close request): Design and documentation
- 09:26 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #725 (Close request): Infrastructure IoT dashboard / Backend
- 09:26 ADVICS MANUFACTURING (THAILAND) CO., LTD. Problem-Bug #716 (Close request): PLC data clear error
- 09:26 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #755 (Close request): Develop PC Software.
- 09:26 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. Project progress work #707 (Close request): Modify Webpegasus.
- 09:26 THAI METALTECH CO., LTD. Project progress work #650 (Close request): [Coding] Warehouse management system Web App PHP Pegasus Phase1
- 09:26 TOMAS TECH CO., LTD. Project progress work #678 (Close request): LEGO
11 Nov 2024
- 17:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #756 (In Progress): [Colding] Web dashboard application PHP
- 07:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #756 (Closed): [Colding] Web dashboard application PHP
- 17:00 EBISU FOODS CO., LTD. Project progress work #761 (In Progress): WMS Pegasus & API linkage
- 14:54 EBISU FOODS CO., LTD. Project progress work #761 (Closed): WMS Pegasus & API linkage
- Web development / API linkage with SAP
- 16:58 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. Project progress work #690 (In Progress): [Coding] Warehouse management system PHP Linkage APIs
- 16:58 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. Project progress work #690 (New): [Coding] Warehouse management system PHP Linkage APIs
- 16:57 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. Project progress work #690 (In Progress): [Coding] Warehouse management system PHP Linkage APIs
- 16:57 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. Project progress work #689 (In Progress): [Coding] Warehouse management system PHP Linkage APIs
- 16:56 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #725 (Confirmation request): Infrastructure IoT dashboard / Backend
- This task has been assigned to K.G
- 14:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. Project progress work #725: Infrastructure IoT dashboard / Backend
- The task has been assigned to another.
- 16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #735: PICS handy terminal Document.
- Make Document HT Software.
KDPA2000 (80 %)
KDPA4000 (80 %)
KDPL1000 (75 %)
KDPP2000 (55 %)
KDPP5000 (55 %)
KDPP... - 16:32 A.N.I. LOGISTICS, LTD. Project progress work #739: [Development] CKD process system phase4
- today
-Receive Finish Case (Handy)
tomorrow
-Receive Finish Case (Tablet)
-Move Finish Case (Handy) - 14:43 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #760 (Closed): Production Control Budomari Information board (Display)
- Modified display to work properly
- Add more product types to line
- Improve display speed - 14:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #759 (Closed): STEP - Installation
- STEP - Installation
- 14:34 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #758 (Closed): PICS - Installation
- PICS - Installation
- 14:21 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #755 (Confirmation request): Develop PC Software.
- Develop PC Software.
- 14:14 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. Parent project #757 (Closed): [PJ240053] Process management system Printer 2500 PCS./ ROLL
- 14:09 TOMAS TECH CO., LTD. Project progress work #714: For internal meeting and other
- (11/11)Support i-Reporter NTPT, Edit i-Reporter form (STL)
- 14:05 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #495 (In Progress): SALE - Version upgrade development support
- 13:42 TOMAS TECH CO., LTD. Sales support #285 (Closed): Smart warehouse for AAPICO HITECH PUBLIC COMPANY LIMITED
- 13:42 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #465 (Closed): [Coding]ASI - Process Control System Phase2 -Java
- 13:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #484 (Closed): CAPS - Operation test confirmation/Specification creation
- 13:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #485 (Closed): PICS - Operation test confirmation/Specification creation
- 13:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation
- 13:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #487 (Closed): REPO - Operation test confirmation/Specification creation
- 13:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #488 (Closed): STEP - Operation test confirmation/Specification creation
- 13:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #489 (Closed): SALE - Operation test confirmation/Specification creation
- 13:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #490 (Closed): CAPS - Version upgrade development support
- 13:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #491 (Closed): PICS - Version upgrade development support
- 13:41 THAI METALTECH CO., LTD. Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01
- 13:41 TOMAS TECH CO., LTD. Project progress work #639 (Closed): [ concept and estimate cost ] CCTV installation for ANI
- 13:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #662 (Closed): PICS - Version upgrade development support handy terminal
- 13:41 ASIAN STANLEY. INTERNATIONAL LIMITED. Project progress work #674 (Closed): [Installation]Process Control System phase2
- 13:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. Project progress work #715 (Closed): CAPS - Installation
- 13:41 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #721 (Closed): Modify PC Software.
10 Nov 2024
- 21:12 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. Project progress work #733 (Confirmation request): Design and documentation
Also available in: Atom