Activity
From 08 Nov 2024 to 17 Nov 2024
17 Nov 2024
- 23:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #804 (Closed): NTN concept panel)
- Estimate cost
- 23:58 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #804 (Closed): NTN concept panel)
- Drawing EE
- 23:56 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #700 (Closed): PR Electrical part )
- Make PO
- 23:55 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
- Drawing EE
- 23:55 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #696 (Closed): Electrical Diagram)
- Drawing EE
- 23:44 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #801 (Closed): EKD system phase 4)
- Support installation
- 22:54 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #801 (Closed): EKD system phase 4)
- Site Survey
- 23:44 YAMATO ELECTRIC (THAILAND) CO., LTD. 7.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 23:43 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 23:43 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Final SIT
- 23:43 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- 23:43 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #645 (Closed): [ Installation&On-site support ] Power meter monitoring system for OTICS)
- installation Cooling unit
- 23:42 A.N.I. LOGISTICS, LTD. 2.00 hours (Parent project #708 (Closed): IKD System - Migrate AS400 to Pegasus at PCB site)
- 23:40 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 2.00 hours (Project progress work #803 (Closed): [Documentation] Get requirements of project)
- UAT at online
- 23:36 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #753 (Closed): Process Management System [Design & Get requirements])
- Update spec version 2
- 23:36 MINEBEA ACCESSSOLUTIONS THAI LTD. 3.00 hours (Project progress work #753 (Closed): Process Management System [Design & Get requirements])
- 23:35 A.N.I. LOGISTICS, LTD. 1.00 hour (Parent project #712 (Closed): EKD System phase4 for ANI Ayuthaya)
- Meeting about new concept of topology due to use an old L3 manage switch
- 23:31 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #646 (Closed): WDT and smartwatch demo project)
- Assign work regarding MAST demo to khun Puk
- 23:28 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- Estimate cost No.260
- 23:28 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- Estimate cost No.252
- 23:11 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- Estimate cost No.259
- 23:10 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- Estimate cost No.259
- 23:10 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- Estimate cost No.259
- 23:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #759 (Closed): STEP - Installation)
- [Task] LAT - STEP - Installation 5/5
- 23:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #759 (Closed): STEP - Installation)
- [Task] LAT - STEP - Installation 4/5
- 23:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #759 (Closed): STEP - Installation)
- [Task] LAT - STEP - Installation 3/5
- 23:25 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #759 (Closed): STEP - Installation)
- [Task] LAT - STEP - Installation 2/5
- 23:24 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #759 (Closed): STEP - Installation)
- [Task] LAT - STEP - Installation 1/5
- 23:23 ASIAN STANLEY. INTERNATIONAL LIMITED. 1.00 hour (Project progress work #754 (Closed): [Design] Design and consult)
- Meeting about application design of handy working in an offline mode
- 23:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 5/15
- 23:23 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 4/15
- 23:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 3/15
- 23:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 2/15
- 23:22 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #758 (Closed): PICS - Installation)
- [Task] LAT - PICS - Installation 1/15
- 23:21 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #623 (In Progress): [Installation] Install Raspi and TV monitor)
- 23:13 TOMAS TECH CO., LTD. 8.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
- Estimate cost
- 22:48 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
- PR Electrical part list
- 21:26 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
- PR Electrical part list
- 21:26 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #697 (Closed): PR Electrical part )
- PR Electrical part list
- 22:47 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #800 (Closed): [Area1] Camera control system)
- Wiring cabinet
- 22:43 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #800 (Closed): [Area1] Camera control system)
- PR Electrical part list
- 22:43 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #800 (Closed): [Area1] Camera control system)
- PR Electrical part list
- 22:42 DAIFUKU (THAILAND) LTD. 8.00 hours (Project progress work #800 (Closed): [Area1] Camera control system)
- PR Electrical part list
- 22:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #699 (Closed): Electrical Diagram)
- Meeting at site
- 22:32 OTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #799 (Closed): Check Power meter)
- Check Power meter
- 21:18 TOMAS TECH CO., LTD. 8.00 hours (Sales support #798 (New): Site survey customer for new project)
- site survey at HAVI
- 21:01 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #523 (New): Phatthadon Inthachot Taking Day off January-December 2024)
- Personal Leave
- 21:00 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #523 (New): Phatthadon Inthachot Taking Day off January-December 2024)
- Sick leave
- 18:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3d printer,wiring,assemble,Arduino program
- 18:12 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3d printer,wiring,assemble,Arduino program
- 18:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3d printer,wiring,assemble,Arduino program
- 18:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3d printer,wiring,assemble,Arduino program
- 18:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3d printer,wiring,assemble,Arduino program
- 18:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3d printer,wiring,assemble,Arduino program
- 18:08 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3d printer,wiring,assemble,Arduino program
16 Nov 2024
- 22:17 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- 22:16 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- trainning user
- 22:15 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #797 (Closed): [Installation] HT_YDT WMS)
- Install program on handy, set up handy
- 22:11 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
- modify HT function wirebond & api
- 22:11 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #784 (Closed): [Colding] Handy terminal BT-A500 Java application (Process Control System))
- modify HT function wirebond
- 17:42 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- 3D Drawing
- 17:42 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- 3D Drawing
- 17:41 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- 3D Drawing
- 17:41 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- 3D Drawing
- 17:41 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- 3D Drawing
- 17:41 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
- 3D Drawing
- 17:38 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 15:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 11.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 15:48 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 15:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 6.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 15:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 9.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 15:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:45 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 9.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 11.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 12.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 12.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:32 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 12.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 11.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:31 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:30 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 14:30 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 11.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 13:52 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 12.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation
- 13:46 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support Installation Addon monitoring
- 17:27 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #729 (Closed): [ Installation & On-site support] Hardware installation for IoT Loss analysis MOC and Packing process Line 1,2)
- Safety training
- 15:47 AH BRAKE (THAILAND) CO., LTD. 4.50 hours (Project progress work #729 (Closed): [ Installation & On-site support] Hardware installation for IoT Loss analysis MOC and Packing process Line 1,2)
- On-site support installation
- 14:52 AH BRAKE (THAILAND) CO., LTD. 9.50 hours (Project progress work #729 (Closed): [ Installation & On-site support] Hardware installation for IoT Loss analysis MOC and Packing process Line 1,2)
- On-site support installation
- 14:51 AH BRAKE (THAILAND) CO., LTD. 9.50 hours (Project progress work #729 (Closed): [ Installation & On-site support] Hardware installation for IoT Loss analysis MOC and Packing process Line 1,2)
- On-site support installation
- 14:48 AH BRAKE (THAILAND) CO., LTD. 12.00 hours (Project progress work #729 (Closed): [ Installation & On-site support] Hardware installation for IoT Loss analysis MOC and Packing process Line 1,2)
- On-site support installation
- 14:48 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #729 (Closed): [ Installation & On-site support] Hardware installation for IoT Loss analysis MOC and Packing process Line 1,2)
- On-site support installation
- 17:23 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
- 3D Printing Assembly
- 17:15 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #762 (Closed): Fix web problems)
- Create new record Master Data item
- 17:03 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- Coding backend Production Monitoring Gantt Chart
- 16:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
- Check HT Software.
- 16:44 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Setup Finish Case (Handy)
- 16:44 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Setup Finish Case (Handy)
- 16:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:16 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:16 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:15 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #796 (Closed): [ Wring & Assembly ] Andon monitoring system Control cabinet 3 Set)
- Assembly hardware and wiring
- 16:13 HAMADEN MEXICO S.A.DE C.V 3.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Edit users manual and fixed bugs some function.
- 16:12 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 5.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Fixed stocktaking and location.
- 14:38 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
- Packing Process Hardwar assembly internal
- 14:38 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
- Packing Process Hardwar assembly internal
- 14:28 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
- Packing Process Hardwar assembly internal
- 13:39 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
- Packing Process Hardwar assembly internal
- 13:38 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
- Packing Process Hardwar assembly internal
- 13:36 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
- Packing Process Hardwar assembly internal
- 13:34 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
- Packing Process Hardwar assembly internal
- 13:32 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
- Packing Process Hardwar assembly internal
- 13:30 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
- Packing Process Hardwar assembly internal
- 13:28 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
- Packing Process Hardwar assembly internal
- 09:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter
15 Nov 2024
- 20:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- Coding backend Alarm Analysis Chart
- 17:56 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Testing and fixed bugs all function.
- 17:29 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter
- 17:16 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #762 (Closed): Fix web problems)
- Create new record Master Data, Create function check duplicate id on location, Supplier
- 00:08 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #762 (Closed): Fix web problems)
- Create new record Master Data
- 16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
- Make Document HT Software.
- 16:41 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Goods receipt test
- 16:35 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Testing Goods Receipt 1
- 16:39 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Location & Stock modify from client (ISEWAN)
- 16:36 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Stock Dashboard and Stock taking
- 16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Setup Finish Case (Handy)
- 16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Setup Finish Case (Handy)
- 09:29 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Edit Program PLC and HMI
- 09:29 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Edit Program PLC and HMI
- 09:26 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Edit Program PLC and HMI
- 09:26 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Edit Program PLC and HMI
- 09:24 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Edit Program PLC and HMI
- 09:24 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Installation program PLC and HMI
- 09:24 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Installation program PLC and HMI
- 09:19 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:19 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:19 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:19 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:18 FTS AUTOMOTIVE (THAILAND) CO.,LTD 8.00 hours (Project progress work #764 (New): FTP DATA LOGGING)
- Program PLC and HMI Development
- 09:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:29 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:28 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:27 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:26 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #763 (New): ANDON DASHBOARD DESIGN AND PROGRAMMING)
- Program and Dashboard Development
- 09:20 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Training Manul JTEKT infrastructure project
- 09:15 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:15 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Manul JTEKT infrastructure project
- 09:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Manul JTEKT infrastructure project
- 09:14 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:13 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
- 09:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #410 (Closed): [ Task ] Program and Dashboard Development )
- Program and Dashboard Development
14 Nov 2024
- 17:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
- Make Document HT Software.
- 16:52 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Setup Finish Case (Handy)
- 16:51 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Setup Finish Case (Handy)
- 16:20 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- Coding backend Alarm Analysis
- 14:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add api preset data.
- 14:55 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 5.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Change stocktaking page and fixed other issues.
- 14:54 HAMADEN MEXICO S.A.DE C.V 3.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Test recieve data response from PLC.
- 08:52 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter
13 Nov 2024
- 17:26 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Document Import csv all files in website (master), (schedule) and fix bug stocktaking
- 17:11 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed Page Purchase Instructions.
- 17:01 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- fix and test system with K.nack
- 17:00 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed Modify Data In Page Stock Inventory Report
- 17:19 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Improve Speacial tags after meeting Modify the logic so that the user must enter the Delivery Qty first Add a notific...
- 16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
- Make Document HT Software.
- 16:34 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Move Finish Case
- 16:34 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Move Finish Case
- 16:25 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- Coding backend Electric Summary
- 08:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter, Meeting with customer
12 Nov 2024
- 23:17 MINEBEA ACCESSSOLUTIONS THAI LTD. 1.00 hour (Project progress work #762 (Closed): Fix web problems)
- Finish Keep menu state
- 17:18 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #762 (Closed): Fix web problems)
- Set up SQL Server, Review the code of the system and implement menu state persistence.
- 17:15 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 1.00 hour (Project progress work #743 (Closed): Development EDI system)
- Meeting online Overall overview of the EDI system
- 16:58 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Fixed issues after test with isewan.
- 16:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
- Make Document HT Software.
- 16:43 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Receive Finish Case (Tablet)
- 16:43 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Receive Finish Case (Tablet)
- 16:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- develop backend Production Monitoring Data Chart and Input Information
- 13:45 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter
- 09:31 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Edit flow of websocket.
- 09:29 HAMADEN MEXICO S.A.DE C.V 6.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Test get response from server after send data 1/1.
11 Nov 2024
- 17:16 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Fix issues Devided by zero, Check password expired, Set default print paper size to A4 Update test case result
- 17:12 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #756 (Closed): [Colding] Web dashboard application PHP)
- develop backend Production Monitoring Data Chart
- 16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
- Make Document HT Software.
- 16:40 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Test and fixed some function on site testing with ISEWAN.
- 16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Receive Finish Case (Handy)
- 16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- 15:23 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- goods receipt & issue dev and testing 3/4
- 15:23 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- goods receipt & issue dev and testing 2/4
- 15:22 EBISU FOODS CO., LTD. 2.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- goods receipt & issue 1/4
- 15:21 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- json outbound production generator 2 / and testing with SAP
- 15:20 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- On-site meeting with client
- 15:20 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- json outbound production generator
- 15:19 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Testing Inbound production json with SAP (2/5)
- 15:18 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Develop production json generator for SAP 3/3
- 15:17 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Testing Inbound production json with SAP (1/5)
- 15:17 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Develop production json generator for SAP 2/3
- 15:17 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Develop production json generator for SAP 1/3
- 15:15 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- modify WMS from meeting minute
- 15:15 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- API columns valid test with K.Nok from SAP
- 15:14 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- On-site meeting with client
- 15:14 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- modify json generators from test result
- 15:14 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- testing Return Request with SAP 3/3
- 15:13 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- testing Return Request with SAP 2/3
- 15:13 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- prepare user manual
- 15:12 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- prepare user manual
- 15:12 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- testing Delivery with SAP 3/3
- 15:12 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- testing Delivery with SAP 2/3
- 15:11 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- testing Delivery with SAP 1/3
- 15:11 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- testing Return Request with SAP 1/3
- 15:10 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- testing GRPO with SAP 3/3
- 15:07 EBISU FOODS CO., LTD. 7.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- testing GRPO with SAP 2/3
- 15:07 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- testing GRPO with SAP 1/3
- 15:05 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- json Return Request generator 5/5
- 15:05 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- json Return Request generator 4/5
- 15:05 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- json Return Request generator 3/5
- 15:05 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- json Return Request generator 2/5
- 15:05 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- json Return Request generator 1/5
- 15:01 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- internal test with K.Pump 3/3
- 15:01 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- internal test with K.Pump 2/3
- 15:01 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- internal test with K.Pump 1/3
- 14:59 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- develop json GRPO generator and connect to SAP API 3/3
- 14:59 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- develop json GRPO generator and connect to SAP API 2/3
- 14:59 EBISU FOODS CO., LTD. 4.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- On-site meeting with client
- 14:58 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- develop GRPO json generator and connect to SAP API 1/3
- 14:57 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- WMS & API modification 4/4
- 14:57 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- WMS & API modification 3/4
- 14:57 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- WMS & API modification 2/4
- 14:57 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- WMS & API modification 1/4
- 14:56 EBISU FOODS CO., LTD. 8.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Code reviewing / API reviewing
- 14:55 EBISU FOODS CO., LTD. 3.00 hours (Project progress work #761 (Closed): WMS Pegasus & API linkage)
- Meeting brief with K.Nack and K.Pump
- 15:19 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support installation
- 15:18 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support installation
- 15:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support installation
- 15:17 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support installation
- 15:16 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
- Support installation
- 15:13 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #443 (In Progress): Copeland (Thailand) Co., Ltd. ( Emerson ))
- Make concept and summarize cost
- 15:12 TOMAS TECH CO., LTD. 8.00 hours (Sales support #730 (In Progress): [ Make concept & Summary cost ] Utility control monitoring and Production monitoring system)
- Summarize cost and make concept
- 14:57 TOMAS TECH CO., LTD. 8.00 hours (Sales support #730 (In Progress): [ Make concept & Summary cost ] Utility control monitoring and Production monitoring system)
- Site survey about confirm position sensor
- 15:11 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Installation and update program IoT R2
- 15:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Installation and update program IoT R2
- 15:10 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Installation and update program IoT R2
- 15:09 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Installation and update program IoT R2
- 15:07 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Installation and update program IoT R2
- 15:06 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Installation and update program IoT R2
- 15:05 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Installation and update program IoT R2
- 14:55 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Installation and update program IoT R2
- 14:54 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #141 (Closed): [Task]Deverlop HMI Bekido and OA monitoring)
- Fix comment and confirm data
- 14:53 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #499 (Closed): [Coding] MT MOC Line IoT system for AH Brake)
- Meeting and site survey
- 14:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #515 (New): Nattapol Poeam Taking Day off January-December 2024)
- leave ordination
- 14:48 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #760 (Closed): Production Control Budomari Information board (Display))
- modify query / coding
- 14:48 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #760 (Closed): Production Control Budomari Information board (Display))
- modify query / coding
- 14:46 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #760 (Closed): Production Control Budomari Information board (Display))
- Code modify / Setting up environment
- 14:45 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #760 (Closed): Production Control Budomari Information board (Display))
- code reviewing / project planing
- 14:44 ASIAN STANLEY. INTERNATIONAL LIMITED. 4.00 hours (Project progress work #760 (Closed): Production Control Budomari Information board (Display))
- Meeting brief with K.So and K.Kamol
- 14:34 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- bug fixed 4/4
- 14:34 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- bug fixed 3/4
- 14:34 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- bug fixed 2/4
- 14:34 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 2.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- bug fixed 1/4
- 14:33 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- UAT TEST AT ASUTO
- 14:32 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 1.00 hour (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Internal preparation for ASUTO
- 14:28 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Internal test 5/5
- 14:28 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Internal test 4/5
- 14:28 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Internal test 3/5
- 14:28 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock dashboard 2/2
- 14:27 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock dashboard 1/2
- 14:27 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock menu 10/10
- 14:27 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock menu 9/10
- 14:26 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock menu 8/10
- 14:26 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock menu 7/10
- 14:25 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- modify by testing result
- 14:25 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Internal test with K.Pai 2/5
- 14:25 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Internal test with K.Pai 1/5
- 14:24 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock menu 6/10
- 14:24 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock menu 5/10
- 14:23 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock menu 4/10
- 14:18 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock menu 3/10
- 14:18 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Outbound trigger 1/3
- 14:17 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock menu 2/10
- 14:15 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- ISEWAN onsite modify by testing result
- 14:15 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 4.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- ISEWAN onsite testing
- 14:14 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- stock menu 1/10
- 14:13 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- outbound inquiry/report
- 14:09 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- api linkage database trigger 4/4
- 14:09 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Inbound Inquiry Report
- 14:08 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Schedule menu 5/5
- 14:08 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Schedule menu 4/5
- 14:08 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- api linkage database trigger 3/4
- 14:07 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Schedule menu 3/5
- 14:06 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- api linkage database trigger 2/4
- 14:06 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- Schedule menu 2/5
- 14:05 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #689 (Closed): [Coding] Warehouse management system PHP Linkage APIs )
- api linkage database trigger 1/4
- 14:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 21/30
- 14:14 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 20/30
- 14:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 19/30
- 14:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 18/30
- 14:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 17/30
- 14:13 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 16/30
- 14:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 15/30
- 14:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 14/30
- 14:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 13/30
- 14:12 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 12/30
- 14:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 11/30
- 14:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 10/30
- 14:10 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 9/30
- 14:09 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 8/30
- 14:09 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 7/30
- 14:09 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 6/30
- 14:09 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 5/30
- 14:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 4/30
- 14:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 3/30
- 14:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 2/30
- 14:07 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #495 (Closed): SALE - Version upgrade development support)
- [Task] LAT - SALE - Conversion and Documents Creation 1/30
- 14:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter NTPT, Create i-Reporter form
- 14:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 30/30
- 14:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 29/30
- 14:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 28/30
- 14:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 27/30
- 14:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 26/30
- 14:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 25/30
- 14:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 24/30
- 14:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 23/30
- 14:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 22/30
- 14:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 21/30
- 14:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 20/30
- 14:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
- [Task] LAT - STEP - Conversion and Documents Creation 19/30
- 14:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #725 (Closed): Infrastructure IoT dashboard / Backend)
- CSV import function 2/2
- 14:02 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #725 (Closed): Infrastructure IoT dashboard / Backend)
- CSV import function 1/2
- 14:01 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #725 (Closed): Infrastructure IoT dashboard / Backend)
- database working
- 13:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
- [Task] LAT - REPO - Conversion and Documents Creation 35/36
- 13:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
- [Task] LAT - REPO - Conversion and Documents Creation 34/36
- 13:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
- [Task] LAT - REPO - Conversion and Documents Creation 33/36
- 13:58 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
- [Task] LAT - REPO - Conversion and Documents Creation 32/36
- 13:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
- [Task] LAT - REPO - Conversion and Documents Creation 31/36
- 13:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
- [Task] LAT - REPO - Conversion and Documents Creation 30/36
- 13:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
- [Task] LAT - REPO - Conversion and Documents Creation 29/36
- 13:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
- [Task] LAT - REPO - Conversion and Documents Creation 28/36
- 13:56 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
- [Task] LAT - REPO - Conversion and Documents Creation 27/36
- 13:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
- [Task] LAT - CYLC - Conversion and Documents Creation 36/36
- 13:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
- [Task] LAT - CYLC - Conversion and Documents Creation 35/36
- 13:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
- [Task] LAT - CYLC - Conversion and Documents Creation 34/36
- 13:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
- [Task] LAT - CYLC - Conversion and Documents Creation 33/36
- 13:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
- [Task] LAT - CYLC - Conversion and Documents Creation 32/36
- 13:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
- [Task] LAT - CYLC - Conversion and Documents Creation 31/36
- 13:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
- [Task] LAT - CYLC - Conversion and Documents Creation 30/36
- 13:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
- [Task] LAT - CYLC - Conversion and Documents Creation 29/36
- 13:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
- [Task] LAT - CYLC - Conversion and Documents Creation 28/36
- 13:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
- [Task] LAT - CYLC - Conversion and Documents Creation 27/36
10 Nov 2024
- 21:11 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 4.00 hours (Project progress work #733 (Closed): Design and documentation)
- SIT test with k.puk and confirmation
- 21:09 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Project progress work #692 (Closed): Design and get requirements)
- Meeting about get requirements and survey in work area
- 21:07 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #130 (Closed): [Coding]Inner packing screen function C#)
- Fix issue about removing an incorrected master plan and re-generate the labels
09 Nov 2024
- 23:23 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- fix after test inboud/outbound/rework/schedule
- 23:20 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- fix after test inboud/outbound/rework/schedule
- 23:20 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- fix after test inboud/outbound/rework/schedule
- 23:19 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- fix and test system with K.nack & K.neung
- 23:18 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- fix inbound and rework
- 23:16 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- Modify layout label
- 23:22 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- Meeting Asprova system at NTPT
- 23:18 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- Test handy mast for demo with customer
- 23:17 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
- demo handy with customer nippn at office
08 Nov 2024
- 17:38 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Create and complete the monthly forecast import and add a function to check for duplicate required fields on the crus...
- 17:35 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Create and Completed a Calendar Master page [add,edit,deleted] to manage workdays for schedule generation.
- 17:38 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 6.00 hours (Project progress work #743 (Closed): Development EDI system)
- fix calendar and layout print labels, Internal test with K.nack
- 17:36 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 6.00 hours (Project progress work #743 (Closed): Development EDI system)
- fix bug
- 16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
- Make Document HT Software.
- 16:37 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Receive Finish Case
- 16:37 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Receive Finish Case
- 14:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter NTPT, Create i-Reporter form