Activity
From 29 Oct 2024 to 07 Nov 2024
07 Nov 2024
- 17:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add websocket and update mobile app recieve data.
- 16:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
- Make Document HT Software.
- 16:47 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Receive Finish Case, Lock screen
- 16:46 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Receive Finish Case, Lock screen
- 11:58 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #753 (Closed): Process Management System [Design & Get requirements])
- 11:49 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #753 (Closed): Process Management System [Design & Get requirements])
- Preparing spec rev1
- 11:48 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #753 (Closed): Process Management System [Design & Get requirements])
- 11:58 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
- NIPPN present
- 11:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
- Preparing presentation and data for NIPPN demo at office
- 11:46 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
- Asprova install and license
- 11:44 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Final SIT
- 11:44 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
- Internal SIT
- 11:42 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Project progress work #692 (Closed): Design and get requirements)
- 11:41 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
- 11:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
- 11:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
- 11:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
- 11:01 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 4.00 hours (Project progress work #747 (Closed): Testing Modify Pegasus to Pegasus2)
- Fix bugs in the Kanban Status Management page (import function) and Stock Maintenance page (insert and update functio...
- 10:59 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 4.00 hours (Project progress work #747 (Closed): Testing Modify Pegasus to Pegasus2)
- Remotely install and test the system after fixing bugs and swap to web pegasus 2.
- 10:56 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed Page Purchase Instructions.
- 10:54 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Create a Calendar Master page to manage workdays for schedule generation.
- 10:51 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Fix bugs and retest all functions thoroughly with detailed checks.
- 10:47 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Final test full function with handdy.
- 07:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter NTPT, Create i-Reporter form
06 Nov 2024
- 16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
- Develop Menu HT Software.
- 16:35 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Receive Finish Case
- 16:35 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Receive Finish Case
- 16:33 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add recieve data respond from web socket on mobile.
- 16:32 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Fixed dropdown selected and add take photo function.
- 16:31 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Final test full system and fix bug
- 16:30 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Develop History tag page
- 14:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Outside and Support
05 Nov 2024
- 16:49 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
- Develop PC Software.
- 16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Outer Packing Process
- 16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Outer Packing Process
- 14:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter NTPT
- 10:58 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Develop History tag page
04 Nov 2024
- 17:00 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter NTPT
- 16:47 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
- Develop PC Software.
- 16:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Outer Packing Process
- 16:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Outer Packing Process
- 16:36 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Add setting .csv to adjust UI on app function.
- 12:34 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed and completed day/night shift adjustment by -1 day in the production CSV import for 3 production files.
- 12:32 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Developed feature to add username log in tables (inbound, outbound, productionSchedule) and fixed bug to adjust day/n...
- 12:31 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Created 3 production inbound CSV files with day and night shift data, adjusted by -1 day per customer requirements.
- 12:28 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 4.00 hours (Project progress work #747 (Closed): Testing Modify Pegasus to Pegasus2)
- Remote swap Pegasus 2 to Pegasus 1 due to import, test case, and various report generation errors on Pegasus 2.
02 Nov 2024
- 17:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Support i-Reporter NTPT
- 17:52 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- (01/11)Create i-Reporter form, Support i-Reporter NTPT
- 17:48 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Develop History tag page
- 16:48 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
- Develop PC Software.
- 16:42 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Outer Packing Process
- 16:42 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Outer Packing Process
- 16:13 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
- Test and fixed send data to PLC.
01 Nov 2024
- 17:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Implement web socket support mobile 1/2.
- 17:28 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Develop History tag page
- 16:46 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
- Develop PC Software.
- 16:42 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Outer Packing Process
- 16:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Outer Packing Process
31 Oct 2024
- 21:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Meeting with customer (Minibea)., Support i-Reporter NTPT(E-mail)
- 20:30 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Develop Print Issues Special tag page
- 16:53 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
- Develop PC Software.
- 16:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add websocket function 2/2.
- 16:40 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Multi scan handy
- 16:40 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Multi scan handy
- 16:01 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #750 (Closed): Fixed function Web Pegasus after training.)
- Remotely add image item generate to pdf lotsize labeling and testing new requirement.
- 15:55 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Final test inbound outbound, import with handy.
30 Oct 2024
- 18:15 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- 17:35 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Create i-Reporter form(2/2)
- 17:19 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Develop Print Issues Special tag page
- 17:01 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Develop Print Issues Special tag page
- 17:00 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
- Develop Print Issues Special tag page
- 16:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add websocket function 1/2.
- 16:47 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
- Develop PC Software.
- 16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Inner Packing Process (new customer request)
- 16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
- Inner Packing Process (new customer request)
- 11:14 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
- Internal testing All Outbound function and fix bug with handy.
- 11:11 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #750 (Closed): Fixed function Web Pegasus after training.)
- Completed pdf user manual web pegasus2 phase1 tmc.
29 Oct 2024
- 22:58 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- outbound injection
- 22:58 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- Outbound injection
- 22:57 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- Outbound injection
- 22:57 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
- 16:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
- Create i-Reporter form
- 16:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Add login call users list from web.
- 07:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Edit webbackend mobile preset page.
- 07:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Mobile all api master 2/2.
- 07:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Mobile all api master 1/2.
- 07:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
- Mobile call api login function.
- 16:50 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
- Develop PC Software.
- 16:43 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Track usage
- 16:43 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
- Track usage
- 16:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 16:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
- 07:47 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
- Test all and fixed some issues of asuto on site.