From 29 Oct 2024 to 07 Nov 2024

07 Nov 2024

17:14 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Add websocket and update mobile app recieve data. Taweesak Prumvised
16:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:47 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive Finish Case, Lock screen Priroj Neamjarn
16:46 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive Finish Case, Lock screen Priroj Neamjarn
11:58 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #753 (Closed): Process Management System [Design & Get requirements])
Kittisak Isarapongporn
11:49 MINEBEA ACCESSSOLUTIONS THAI LTD. 8.00 hours (Project progress work #753 (Closed): Process Management System [Design & Get requirements])
Preparing spec rev1 Kittisak Isarapongporn
11:48 MINEBEA ACCESSSOLUTIONS THAI LTD. 4.00 hours (Project progress work #753 (Closed): Process Management System [Design & Get requirements])
Kittisak Isarapongporn
11:58 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
NIPPN present Kittisak Isarapongporn
11:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
Preparing presentation and data for NIPPN demo at office Kittisak Isarapongporn
11:46 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Asprova install and license Kittisak Isarapongporn
11:44 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Final SIT Kittisak Isarapongporn
11:44 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Internal SIT Kittisak Isarapongporn
11:42 JTEKT MACHINE SYSTEMS (THAILAND) CO., LTD. 4.00 hours (Project progress work #692 (Closed): Design and get requirements)
Kittisak Isarapongporn
11:41 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
11:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
11:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
11:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
11:01 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 4.00 hours (Project progress work #747 (Closed): Testing Modify Pegasus to Pegasus2)
Fix bugs in the Kanban Status Management page (import function) and Stock Maintenance page (insert and update functio... Ronnagon Kongsuwan
10:59 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 4.00 hours (Project progress work #747 (Closed): Testing Modify Pegasus to Pegasus2)
Remotely install and test the system after fixing bugs and swap to web pegasus 2. Ronnagon Kongsuwan
10:56 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed Page Purchase Instructions. Ronnagon Kongsuwan
10:54 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Create a Calendar Master page to manage workdays for schedule generation. Ronnagon Kongsuwan
10:51 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Fix bugs and retest all functions thoroughly with detailed checks. Ronnagon Kongsuwan
10:47 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Final test full function with handdy. Ronnagon Kongsuwan
07:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT, Create i-Reporter form Panthita Roekdee

06 Nov 2024

16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Develop Menu HT Software. Kamol Anekchatnuntakool
16:35 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive Finish Case Priroj Neamjarn
16:35 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive Finish Case Priroj Neamjarn
16:33 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Add recieve data respond from web socket on mobile. Taweesak Prumvised
16:32 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Fixed dropdown selected and add take photo function. Taweesak Prumvised
16:31 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Final test full system and fix bug Nattaporn Chaiya
16:30 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop History tag page Nattaporn Chaiya
14:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Outside and Support Panthita Roekdee

05 Nov 2024

16:49 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
Develop PC Software. Kamol Anekchatnuntakool
16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Outer Packing Process Priroj Neamjarn
16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Outer Packing Process Priroj Neamjarn
14:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT Panthita Roekdee
10:58 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop History tag page Nattaporn Chaiya

04 Nov 2024

17:00 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT Panthita Roekdee
16:47 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
Develop PC Software. Kamol Anekchatnuntakool
16:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Outer Packing Process Priroj Neamjarn
16:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Outer Packing Process Priroj Neamjarn
16:36 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add setting .csv to adjust UI on app function. Taweesak Prumvised
12:34 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed day/night shift adjustment by -1 day in the production CSV import for 3 production files. Ronnagon Kongsuwan
12:32 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed feature to add username log in tables (inbound, outbound, productionSchedule) and fixed bug to adjust day/n... Ronnagon Kongsuwan
12:31 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Created 3 production inbound CSV files with day and night shift data, adjusted by -1 day per customer requirements. Ronnagon Kongsuwan
12:28 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 4.00 hours (Project progress work #747 (Closed): Testing Modify Pegasus to Pegasus2)
Remote swap Pegasus 2 to Pegasus 1 due to import, test case, and various report generation errors on Pegasus 2. Ronnagon Kongsuwan

02 Nov 2024

17:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT Panthita Roekdee
17:52 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(01/11)Create i-Reporter form, Support i-Reporter NTPT Panthita Roekdee
17:48 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop History tag page Nattaporn Chaiya
16:48 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
Develop PC Software. Kamol Anekchatnuntakool
16:42 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Outer Packing Process Priroj Neamjarn
16:42 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Outer Packing Process Priroj Neamjarn
16:13 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Test and fixed send data to PLC. Taweesak Prumvised

01 Nov 2024

17:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Implement web socket support mobile 1/2. Taweesak Prumvised
17:28 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop History tag page Nattaporn Chaiya
16:46 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
Develop PC Software. Kamol Anekchatnuntakool
16:42 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Outer Packing Process Priroj Neamjarn
16:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Outer Packing Process Priroj Neamjarn

31 Oct 2024

21:47 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Meeting with customer (Minibea)., Support i-Reporter NTPT(E-mail) Panthita Roekdee
20:30 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop Print Issues Special tag page Nattaporn Chaiya
16:53 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
Develop PC Software. Kamol Anekchatnuntakool
16:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Add websocket function 2/2. Taweesak Prumvised
16:40 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Multi scan handy Priroj Neamjarn
16:40 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Multi scan handy Priroj Neamjarn
16:01 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #750 (Closed): Fixed function Web Pegasus after training.)
Remotely add image item generate to pdf lotsize labeling and testing new requirement. Ronnagon Kongsuwan
15:55 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Final test inbound outbound, import with handy. Ronnagon Kongsuwan

30 Oct 2024

18:15 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Soraya Norasing
17:35 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form(2/2) Panthita Roekdee
17:19 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop Print Issues Special tag page Nattaporn Chaiya
17:01 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop Print Issues Special tag page Nattaporn Chaiya
17:00 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop Print Issues Special tag page Nattaporn Chaiya
16:56 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Add websocket function 1/2. Taweesak Prumvised
16:47 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
Develop PC Software. Kamol Anekchatnuntakool
16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing Process (new customer request) Priroj Neamjarn
16:32 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing Process (new customer request) Priroj Neamjarn
11:14 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Internal testing All Outbound function and fix bug with handy. Ronnagon Kongsuwan
11:11 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #750 (Closed): Fixed function Web Pegasus after training.)
Completed pdf user manual web pegasus2 phase1 tmc. Ronnagon Kongsuwan

29 Oct 2024

22:58 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
outbound injection Soraya Norasing
22:58 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Outbound injection Soraya Norasing
22:57 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Outbound injection Soraya Norasing
22:57 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Soraya Norasing
16:57 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
16:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Add login call users list from web. Taweesak Prumvised
07:55 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Edit webbackend mobile preset page. Taweesak Prumvised
07:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Mobile all api master 2/2. Taweesak Prumvised
07:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Mobile all api master 1/2. Taweesak Prumvised
07:53 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Mobile call api login function. Taweesak Prumvised
16:50 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #755 (Closed): Develop PC Software.)
Develop PC Software. Kamol Anekchatnuntakool
16:43 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Track usage Priroj Neamjarn
16:43 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Track usage Priroj Neamjarn
16:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:23 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:22 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:21 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
07:47 ASUTO GLOBAL LOGISTICS (THAILAND) CO., LTD. 8.00 hours (Project progress work #590 (Closed): [Coding] Warehouse management system handyterminal Java)
Test all and fixed some issues of asuto on site. Taweesak Prumvised
 