From 09 Oct 2024 to 18 Oct 2024

17 Oct 2024

16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:18 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:17 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
today -Inner Packing process tomorrow -Inner Packing process -Login process Priroj Neamjarn
16:08 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #750 (Closed): Fixed function Web Pegasus after training.)
Developed and completed the adjustment of PO PDF printing to dynamically support multiple part pages after real-world... Ronnagon Kongsuwan
16:00 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #750 (Closed): Fixed function Web Pegasus after training.)
Remotely cleared test data and erroneous inbound records on Handdy to perform a new inbound on the live server. Ronnagon Kongsuwan
15:56 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #750 (Closed): Fixed function Web Pegasus after training.)
Developed and completed the revision of the import schedule function to include error notifications and redesigned it... Ronnagon Kongsuwan
16:03 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Manually tested inbound schedule material by inserting it into the database. Ronnagon Kongsuwan
09:25 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop Print Issues tag page Nattaporn Chaiya
08:06 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Meeting with customer Panthita Roekdee

16 Oct 2024

22:25 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 2.00 hours (Project progress work #733 (Closed): Design and documentation)
Update spec document revision 3 Kittisak Isarapongporn
22:19 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Teaching Asprova at NTPT Kittisak Isarapongporn
22:18 NTPT COMPANY LIMITED. 6.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Create function and view for iReporter DB, create Asprova data I/O to get report data from iReporter Kittisak Isarapongporn
16:56 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:45 TOMAS TECH CO., LTD. 5.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Develop web backend add master data. Taweesak Prumvised
16:44 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #741 (Closed): Fixed function after training.)
Support fixed issues after test. Taweesak Prumvised
16:35 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT Panthita Roekdee
16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn

15 Oct 2024

17:00 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Weekly meeting / Develop web backend 1/2. Taweesak Prumvised
16:59 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 4.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop Linkage Data API Users Nattaporn Chaiya
16:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 4.00 hours (Project progress work #721 (Closed): Modify PC Software.)
Remote check Error Database PC Software. Kamol Anekchatnuntakool
16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 4.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Meeting HT Software LAT. Kamol Anekchatnuntakool
16:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:36 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
13:42 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT Panthita Roekdee

14 Oct 2024

22:10 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
3D Printer Konlawat Saechee
22:09 TOMAS TECH CO., LTD. 4.00 hours (Sales support #745 (Closed): Pokayoke Inspection System-TOYOTA BOSHOKU SIAM METAL)
2D Drawing and Estimate cost Konlawat Saechee
22:07 TOMAS TECH CO., LTD. 4.00 hours (Sales support #745 (Closed): Pokayoke Inspection System-TOYOTA BOSHOKU SIAM METAL)
3D design Konlawat Saechee
22:08 TOMAS TECH CO., LTD. 4.00 hours (Sales support #744 (Closed): ATSUMITEC-Inspection station )
3D design Konlawat Saechee
22:07 TOMAS TECH CO., LTD. 4.00 hours (Sales support #744 (Closed): ATSUMITEC-Inspection station )
3D design Konlawat Saechee
21:47 TOMAS TECH CO., LTD. 4.00 hours (Sales support #744 (Closed): ATSUMITEC-Inspection station )
Meetine and Survey Konlawat Saechee
22:03 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #748 (Closed): ALPHA Design inspection station)
2D Drawing Konlawat Saechee
22:01 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #748 (Closed): ALPHA Design inspection station)
3D Design inspection station Konlawat Saechee
22:00 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #748 (Closed): ALPHA Design inspection station)
Meeting Konlawat Saechee
22:02 TOMAS TECH CO., LTD. 8.00 hours (Sales support #691 (Closed): JTAP Inspection camera(CKD))
meeting about vision inspection project with CKD Konlawat Saechee
21:46 NTN MANUFACTURING (THAILAND) CO., LTD. 4.00 hours (Sales support #681 (Closed): Concept and summarize cost)
Meeting Konlawat Saechee

12 Oct 2024

08:42 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Meeting api and add UI. Taweesak Prumvised

11 Oct 2024

17:17 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Production Delivery fontend and created table mrpregister for use in page stock_purchase_inst... Ronnagon Kongsuwan
14:46 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Modify and completed Import Production Schedule Delivery Csv. Ronnagon Kongsuwan
16:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT, Create i-Reporter form(Hayakawa) Panthita Roekdee
16:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(10/10)Support i-Reporter NTPT, Create i-Reporter form(Hayakawa) Panthita Roekdee
16:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(09/10)Support i-Reporter NTPT, Create i-Reporter form(Hayakawa) Panthita Roekdee
16:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(08/10)Support i-Reporter NTPT, Create i-Reporter form(Hayakawa) Panthita Roekdee
16:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(07/10)Support i-Reporter NTPT, Create i-Reporter form Panthita Roekdee
16:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Develop UI Interface 1/1. Taweesak Prumvised
16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:34 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:33 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:30 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 4.00 hours (Project progress work #733 (Closed): Design and documentation)
Update and revise spec revision 2 Kittisak Isarapongporn
16:22 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
16:21 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Meeting with K.Pairoj about explain the additional requirements Kittisak Isarapongporn
15:02 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 2.00 hours (Project progress work #747 (Closed): Testing Modify Pegasus to Pegasus2)
Created example test files for CSV import (PO and Delivery types), along with initial testing of website and database... Ronnagon Kongsuwan
14:48 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Testing and Fixed Production Lotsize Web backend storeproduce function cut material and cut stock. Ronnagon Kongsuwan
14:42 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Present all process production Sdi function schedule, cut stock and modify with client tmc. Ronnagon Kongsuwan
14:39 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Modify Production Lotsize Test and fixed lotsize with haddy. Ronnagon Kongsuwan
14:22 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 5.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop Linkage Data API function create and document Nattaporn Chaiya
00:53 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound rework/rework ng Soraya Norasing
00:52 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound rework/rework ng : modify api & android (100%) Soraya Norasing
00:51 TOMAS TECH CO., LTD. 3.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
internal meeting with K.nack about ASI project , Internal meeting with k.pum about php Soraya Norasing
00:49 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
check data : outer data is incorrect, edit query api Soraya Norasing

10 Oct 2024

23:55 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
23:55 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
23:54 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
Meeting about calling system and smartwatch system source code Kittisak Isarapongporn
23:50 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
21:58 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop Linkage Data API function create and document Nattaporn Chaiya
17:03 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #741 (Closed): Fixed function after training.)
Test and fixed lotsize. Taweesak Prumvised
17:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
08:56 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 26/36 Thanthima Phaengkham
08:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 25/36 Thanthima Phaengkham
08:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 24/36 Thanthima Phaengkham
08:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 23/36 Thanthima Phaengkham
08:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 22/36 Thanthima Phaengkham
08:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 21/36 Thanthima Phaengkham
08:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 20/36 Thanthima Phaengkham
08:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 19/36 Thanthima Phaengkham
08:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 18/36 Thanthima Phaengkham
08:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 17/36 Thanthima Phaengkham
08:51 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 16/36 Thanthima Phaengkham
08:51 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 15/36 Thanthima Phaengkham
08:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 14/36 Thanthima Phaengkham
08:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 26/36 Thanthima Phaengkham
08:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 25/36 Thanthima Phaengkham
08:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 24/36 Thanthima Phaengkham
08:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 23/36 Thanthima Phaengkham
08:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 22/36 Thanthima Phaengkham
08:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 21/36 Thanthima Phaengkham
08:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 20/36 Thanthima Phaengkham
08:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 19/36 Thanthima Phaengkham
08:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 18/36 Thanthima Phaengkham
08:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 17/36 Thanthima Phaengkham
08:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 16/36 Thanthima Phaengkham
08:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 15/36 Thanthima Phaengkham
08:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 14/36 Thanthima Phaengkham
08:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 18/30 Thanthima Phaengkham
08:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 17/30 Thanthima Phaengkham
08:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 16/30 Thanthima Phaengkham
08:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 15/30 Thanthima Phaengkham
08:35 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 14/30 Thanthima Phaengkham
08:34 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 13/30 Thanthima Phaengkham
08:34 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 12/30 Thanthima Phaengkham
08:33 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 11/30 Thanthima Phaengkham
08:33 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 10/30 Thanthima Phaengkham
08:32 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 9/30 Thanthima Phaengkham
08:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 8/30 Thanthima Phaengkham
08:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 7/30 Thanthima Phaengkham
08:30 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 6/30 Thanthima Phaengkham
08:33 TOMAS TECH CO., LTD. 8.00 hours (Sales support #745 (Closed): Pokayoke Inspection System-TOYOTA BOSHOKU SIAM METAL)
3D design Konlawat Saechee
08:28 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #670 (Closed): Demo LEGO)
3d printer Konlawat Saechee
08:27 TOMAS TECH CO., LTD. 4.00 hours (Sales support #744 (Closed): ATSUMITEC-Inspection station )
3D design Konlawat Saechee
08:26 TOMAS TECH CO., LTD. 8.00 hours (Sales support #744 (Closed): ATSUMITEC-Inspection station )
3D design Konlawat Saechee

09 Oct 2024

16:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:52 THAI METALTECH CO., LTD. 5.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Modify and Use function cut stock fifo in trigger and web pegasus. Ronnagon Kongsuwan
16:50 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Meeting with the user to fix functions after training, testing SDI functionality, and gathering additional requirements. Ronnagon Kongsuwan
16:49 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Created and completed Function Stored procedure Cut Stock by fifo. Ronnagon Kongsuwan
16:45 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Testing and fixed outbound SDI Function with handy. Ronnagon Kongsuwan
16:47 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop layout system and login page Nattaporn Chaiya
16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 5/30 Thanthima Phaengkham
16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 4/30 Thanthima Phaengkham
16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 3/30 Thanthima Phaengkham
16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 2/30 Thanthima Phaengkham
16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 1/30 Thanthima Phaengkham
16:45 TOMAS TECH CO., LTD. 6.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Add UI Screen all pages. Taweesak Prumvised
16:44 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #741 (Closed): Fixed function after training.)
Add scan QRCode of schedule SDI page. Taweesak Prumvised
16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:30 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
00:35 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
1. Installation & onsite at NTPT, 2. meeting with NTMT about modify HT input, 3. meeting with K.sakda ASI about reque... Soraya Norasing
00:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
support usert PLCC about data machine wrong, support user CHIP classify process cannot gen lot no. and gen lot no. wrong Soraya Norasing
 