08:42 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Meeting api and add UI. Taweesak Prumvised

11 Oct 2024

17:17 YAMATO ELECTRIC (THAILAND) CO., LTD. 6.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Production Delivery fontend and created table mrpregister for use in page stock_purchase_inst... Ronnagon Kongsuwan
14:46 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Modify and completed Import Production Schedule Delivery Csv. Ronnagon Kongsuwan
16:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT, Create i-Reporter form(Hayakawa) Panthita Roekdee
16:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(10/10)Support i-Reporter NTPT, Create i-Reporter form(Hayakawa) Panthita Roekdee
16:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(09/10)Support i-Reporter NTPT, Create i-Reporter form(Hayakawa) Panthita Roekdee
16:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(08/10)Support i-Reporter NTPT, Create i-Reporter form(Hayakawa) Panthita Roekdee
16:48 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(07/10)Support i-Reporter NTPT, Create i-Reporter form Panthita Roekdee
16:50 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Develop UI Interface 1/1. Taweesak Prumvised
16:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:34 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:33 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:30 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 4.00 hours (Project progress work #733 (Closed): Design and documentation)
Update and revise spec revision 2 Kittisak Isarapongporn
16:22 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
16:21 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Meeting with K.Pairoj about explain the additional requirements Kittisak Isarapongporn
15:02 SHINSEI KOKI (THAILAND) CORPORATION LIMITED. 2.00 hours (Project progress work #747 (Closed): Testing Modify Pegasus to Pegasus2)
Created example test files for CSV import (PO and Delivery types), along with initial testing of website and database... Ronnagon Kongsuwan
14:48 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Testing and Fixed Production Lotsize Web backend storeproduce function cut material and cut stock. Ronnagon Kongsuwan
14:42 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Present all process production Sdi function schedule, cut stock and modify with client tmc. Ronnagon Kongsuwan
14:39 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Modify Production Lotsize Test and fixed lotsize with haddy. Ronnagon Kongsuwan
14:22 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 5.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop Linkage Data API function create and document Nattaporn Chaiya
00:53 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound rework/rework ng Soraya Norasing
00:52 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound rework/rework ng : modify api & android (100%) Soraya Norasing
00:51 TOMAS TECH CO., LTD. 3.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
internal meeting with K.nack about ASI project , Internal meeting with k.pum about php Soraya Norasing
00:49 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #131 (Closed): [Coding]Android handy and tablet modification Java)
check data : outer data is incorrect, edit query api Soraya Norasing

10 Oct 2024

23:55 A.N.I. LOGISTICS, LTD. 2.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
23:55 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
23:54 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #671 (In Progress): [Meeting] Interview and other)
Meeting about calling system and smartwatch system source code Kittisak Isarapongporn
23:50 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 4.00 hours (Project progress work #658 (Closed): Documents and design)
Kittisak Isarapongporn
21:58 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop Linkage Data API function create and document Nattaporn Chaiya
17:03 THAI METALTECH CO., LTD. 4.00 hours (Project progress work #741 (Closed): Fixed function after training.)
Test and fixed lotsize. Taweesak Prumvised
17:01 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:44 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:43 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:42 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:40 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #746 (Closed): ANDON DASH BOARD DESIGN AND PROGRAMMING)
Teeradon Yuensakul
16:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
08:56 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 26/36 Thanthima Phaengkham
08:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 25/36 Thanthima Phaengkham
08:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 24/36 Thanthima Phaengkham
08:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 23/36 Thanthima Phaengkham
08:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 22/36 Thanthima Phaengkham
08:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 21/36 Thanthima Phaengkham
08:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 20/36 Thanthima Phaengkham
08:53 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 19/36 Thanthima Phaengkham
08:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 18/36 Thanthima Phaengkham
08:52 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 17/36 Thanthima Phaengkham
08:51 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 16/36 Thanthima Phaengkham
08:51 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 15/36 Thanthima Phaengkham
08:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 14/36 Thanthima Phaengkham
08:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 26/36 Thanthima Phaengkham
08:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 25/36 Thanthima Phaengkham
08:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 24/36 Thanthima Phaengkham
08:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 23/36 Thanthima Phaengkham
08:43 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 22/36 Thanthima Phaengkham
08:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 21/36 Thanthima Phaengkham
08:42 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 20/36 Thanthima Phaengkham
08:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 19/36 Thanthima Phaengkham
08:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 18/36 Thanthima Phaengkham
08:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 17/36 Thanthima Phaengkham
08:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 16/36 Thanthima Phaengkham
08:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 15/36 Thanthima Phaengkham
08:39 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #492 (Closed): CYLC - Version upgrade development support)
[Task] LAT - CYLC - Conversion and Documents Creation 14/36 Thanthima Phaengkham
08:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 18/30 Thanthima Phaengkham
08:37 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 17/30 Thanthima Phaengkham
08:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 16/30 Thanthima Phaengkham
08:36 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 15/30 Thanthima Phaengkham
08:35 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 14/30 Thanthima Phaengkham
08:34 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 13/30 Thanthima Phaengkham
08:34 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 12/30 Thanthima Phaengkham
08:33 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 11/30 Thanthima Phaengkham
08:33 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 10/30 Thanthima Phaengkham
08:32 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 9/30 Thanthima Phaengkham
08:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 8/30 Thanthima Phaengkham
08:31 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 7/30 Thanthima Phaengkham
08:30 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 6/30 Thanthima Phaengkham
08:33 TOMAS TECH CO., LTD. 8.00 hours (Sales support #745 (Closed): Pokayoke Inspection System-TOYOTA BOSHOKU SIAM METAL)
3D design Konlawat Saechee
08:28 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #670 (Closed): Demo LEGO)
3d printer Konlawat Saechee
08:27 TOMAS TECH CO., LTD. 4.00 hours (Sales support #744 (Closed): ATSUMITEC-Inspection station )
3D design Konlawat Saechee
08:26 TOMAS TECH CO., LTD. 8.00 hours (Sales support #744 (Closed): ATSUMITEC-Inspection station )
3D design Konlawat Saechee

09 Oct 2024

16:54 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:52 THAI METALTECH CO., LTD. 5.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Modify and Use function cut stock fifo in trigger and web pegasus. Ronnagon Kongsuwan
16:50 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Meeting with the user to fix functions after training, testing SDI functionality, and gathering additional requirements. Ronnagon Kongsuwan
16:49 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Created and completed Function Stored procedure Cut Stock by fifo. Ronnagon Kongsuwan
16:45 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #650 (Closed): [Coding] Warehouse management system Web App PHP Pegasus Phase1)
Testing and fixed outbound SDI Function with handy. Ronnagon Kongsuwan
16:47 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #743 (Closed): Development EDI system)
Develop layout system and login page Nattaporn Chaiya
16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 5/30 Thanthima Phaengkham
16:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 4/30 Thanthima Phaengkham
16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 3/30 Thanthima Phaengkham
16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 2/30 Thanthima Phaengkham
16:46 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #494 (Closed): STEP - Version upgrade development support)
[Task] LAT - STEP - Conversion and Documents Creation 1/30 Thanthima Phaengkham
16:45 TOMAS TECH CO., LTD. 6.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Add UI Screen all pages. Taweesak Prumvised
16:44 THAI METALTECH CO., LTD. 2.00 hours (Project progress work #741 (Closed): Fixed function after training.)
Add scan QRCode of schedule SDI page. Taweesak Prumvised
16:31 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
16:30 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Inner Packing process Priroj Neamjarn
00:35 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
1. Installation & onsite at NTPT, 2. meeting with NTMT about modify HT input, 3. meeting with K.sakda ASI about reque... Soraya Norasing
00:31 ASIAN STANLEY. INTERNATIONAL LIMITED. 8.00 hours (Project progress work #674 (Closed): [Installation]Process Control System phase2)
support usert PLCC about data machine wrong, support user CHIP classify process cannot gen lot no. and gen lot no. wrong Soraya Norasing

08 Oct 2024

21:05 TOYOTA BOSHOKU FILTRATION SYSTEM (THAILAND) CO., LTD. 8.00 hours (Project progress work #658 (Closed): Documents and design)
Update spec revision 4 Kittisak Isarapongporn
21:04 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Pick the USB dongle and check the Asprova functions about part and machine lock/unlock Kittisak Isarapongporn
21:03 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
17:20 THAI METALTECH CO., LTD. 8.00 hours (Project progress work #741 (Closed): Fixed function after training.)
Testing and fixed outbound SDI Function. Taweesak Prumvised
17:02 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:42 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn
16:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn

07 Oct 2024

18:06 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #741 (Closed): Fixed function after training.)
Test SDI Function. Taweesak Prumvised
18:03 TOMAS TECH CO., LTD. 5.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Created project and initial UI. Taweesak Prumvised
17:03 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn
16:39 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn

06 Oct 2024

22:24 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #733 (Closed): Design and documentation)
Kittisak Isarapongporn
22:22 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
22:22 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
22:22 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
22:21 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
22:18 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Meeting about describe and assign to K.Pairoj Kittisak Isarapongporn
22:20 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
22:20 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Setting and check Asprova Kittisak Isarapongporn
22:20 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Setting and check Asprova Kittisak Isarapongporn
21:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
3d printer Konlawat Saechee
21:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
3d printer Konlawat Saechee
21:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
3d printer Konlawat Saechee

05 Oct 2024

17:37 HAMADEN MEXICO S.A.DE C.V 6.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add setup information of user manual. Taweesak Prumvised
17:36 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Daily meeting / Review spec document meeting. Taweesak Prumvised
17:07 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Page Production Schedule Type Injection And Press,Created New Page Outbound Material Build Pr... Ronnagon Kongsuwan
17:04 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Import Production Schedule Type Injection And Type Press (backend) Ronnagon Kongsuwan
16:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:32 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
16:30 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn
16:30 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn

04 Oct 2024

22:56 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound rework/rework ng : create & test api Soraya Norasing
22:56 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound rework/rework ng : modify function on android Soraya Norasing
22:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
meeting with K.oil about issue i-reporter, meeting with customer ASI about schedule project, support user ASI about c... Soraya Norasing
22:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Meeting Asprova system at NTPT, Support user ASI about printer Soraya Norasing
17:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
17:03 HAMADEN MEXICO S.A.DE C.V 4.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Edit users manual. Taweesak Prumvised
16:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
16:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #734 (Closed): PICS - Handy Terminal - Test confirmation )
[Task] LAT - PICS - Handy Terminal - Test confirmation 5/5 Thanthima Phaengkham
16:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #734 (Closed): PICS - Handy Terminal - Test confirmation )
[Task] LAT - PICS - Handy Terminal - Test confirmation 4/5 Thanthima Phaengkham
16:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #734 (Closed): PICS - Handy Terminal - Test confirmation )
[Task] LAT - PICS - Handy Terminal - Test confirmation 3/5 Thanthima Phaengkham
16:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #734 (Closed): PICS - Handy Terminal - Test confirmation )
[Task] LAT - PICS - Handy Terminal - Test confirmation 2/5 Thanthima Phaengkham
16:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #734 (Closed): PICS - Handy Terminal - Test confirmation )
[Task] LAT - PICS - Handy Terminal - Test confirmation 1/5 Thanthima Phaengkham
16:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn
16:40 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn
16:33 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Learning i-Reporter. Taweesak Prumvised
08:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support installation server pc rack Nattapong Sukcharoen

03 Oct 2024

16:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:56 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
-Receive process Priroj Neamjarn
16:55 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
-Receive process Priroj Neamjarn
16:29 HAMADEN MEXICO S.A.DE C.V 4.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add users manual1/1. Taweesak Prumvised
16:29 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Modify fontend page Inbound production schedule, Inbound production schedule detail and creat... Ronnagon Kongsuwan
16:27 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Modify page Bom and Crusher ratio page and trigger production use material cut fifo Ronnagon Kongsuwan
16:25 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed schedule production type injection and type press in page schedule import Ronnagon Kongsuwan
16:28 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Daily meeting / Review spec document. Taweesak Prumvised
13:29 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
13:26 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(02/10)Support i-Reporter NTPT(meeting with K.So and NTPT teams), Create i-Reporter form Panthita Roekdee
 