From 27 Sep 2024 to 06 Oct 2024

06 Oct 2024

22:24 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #733 (Closed): Design and documentation)
Kittisak Isarapongporn
22:22 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
22:22 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
22:22 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
22:21 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn
22:18 A.N.I. LOGISTICS, LTD. 4.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Meeting about describe and assign to K.Pairoj Kittisak Isarapongporn
22:20 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
22:20 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Setting and check Asprova Kittisak Isarapongporn
22:20 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Setting and check Asprova Kittisak Isarapongporn
21:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
3d printer Konlawat Saechee
21:05 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
3d printer Konlawat Saechee
21:04 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
3d printer Konlawat Saechee

05 Oct 2024

17:37 HAMADEN MEXICO S.A.DE C.V 6.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add setup information of user manual. Taweesak Prumvised
17:36 TOMAS TECH CO., LTD. 2.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Daily meeting / Review spec document meeting. Taweesak Prumvised
17:07 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Page Production Schedule Type Injection And Press,Created New Page Outbound Material Build Pr... Ronnagon Kongsuwan
17:04 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Import Production Schedule Type Injection And Type Press (backend) Ronnagon Kongsuwan
16:59 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:32 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
16:30 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn
16:30 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn

04 Oct 2024

22:56 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound rework/rework ng : create & test api Soraya Norasing
22:56 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Inbound rework/rework ng : modify function on android Soraya Norasing
22:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
meeting with K.oil about issue i-reporter, meeting with customer ASI about schedule project, support user ASI about c... Soraya Norasing
22:51 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #622 (In Progress): For internal meeting and other)
Meeting Asprova system at NTPT, Support user ASI about printer Soraya Norasing
17:08 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
17:03 HAMADEN MEXICO S.A.DE C.V 4.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Edit users manual. Taweesak Prumvised
16:54 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
16:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #734 (Closed): PICS - Handy Terminal - Test confirmation )
[Task] LAT - PICS - Handy Terminal - Test confirmation 5/5 Thanthima Phaengkham
16:41 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #734 (Closed): PICS - Handy Terminal - Test confirmation )
[Task] LAT - PICS - Handy Terminal - Test confirmation 4/5 Thanthima Phaengkham
16:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #734 (Closed): PICS - Handy Terminal - Test confirmation )
[Task] LAT - PICS - Handy Terminal - Test confirmation 3/5 Thanthima Phaengkham
16:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #734 (Closed): PICS - Handy Terminal - Test confirmation )
[Task] LAT - PICS - Handy Terminal - Test confirmation 2/5 Thanthima Phaengkham
16:40 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #734 (Closed): PICS - Handy Terminal - Test confirmation )
[Task] LAT - PICS - Handy Terminal - Test confirmation 1/5 Thanthima Phaengkham
16:41 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn
16:40 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Receive process Priroj Neamjarn
16:33 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Learning i-Reporter. Taweesak Prumvised
08:24 JTEKT AUTOMOTIVE (THAILAND) CO.,LTD. 10.50 hours (Project progress work #737 (Closed): [ Installation & Support ] Installation and wiring andon project)
Support installation server pc rack Nattapong Sukcharoen

03 Oct 2024

16:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:56 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
-Receive process Priroj Neamjarn
16:55 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
-Receive process Priroj Neamjarn
16:29 HAMADEN MEXICO S.A.DE C.V 4.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Add users manual1/1. Taweesak Prumvised
16:29 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Modify fontend page Inbound production schedule, Inbound production schedule detail and creat... Ronnagon Kongsuwan
16:27 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed Modify page Bom and Crusher ratio page and trigger production use material cut fifo Ronnagon Kongsuwan
16:25 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed schedule production type injection and type press in page schedule import Ronnagon Kongsuwan
16:28 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #740 (In Progress): [Development] Mobile android device and api development.)
Daily meeting / Review spec document. Taweesak Prumvised
13:29 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Create i-Reporter form Panthita Roekdee
13:26 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
(02/10)Support i-Reporter NTPT(meeting with K.So and NTPT teams), Create i-Reporter form Panthita Roekdee

02 Oct 2024

17:06 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 5.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Modify the system according to user needs. Priroj Neamjarn
17:06 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 5.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Modify the system according to user needs. Priroj Neamjarn
17:04 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Prepare an Android project Priroj Neamjarn
17:04 A.N.I. LOGISTICS, LTD. 8.00 hours (Project progress work #739 (Closed): [Development] CKD process system phase4 )
Prepare an Android project Priroj Neamjarn
16:57 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:50 THAI METALTECH CO., LTD. 7.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Edit pokayoke function 1/1 Taweesak Prumvised
16:49 HAMADEN MEXICO S.A.DE C.V 1.00 hour (Project progress work #694 (Closed): [Development] Software design and development)
Add effect button overall page. Taweesak Prumvised
16:25 AH BRAKE (THAILAND) CO., LTD. 8.00 hours (Project progress work #738 (Closed): [ Wring & Assembly ] Control cabinet)
Assembly Control Main PLC Nattapong Sukcharoen

01 Oct 2024

17:00 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:53 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Change directory .csv file and refactor code overall pages. Taweesak Prumvised
16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Installation at Thai Stanley Electric Public Company Limited Priroj Neamjarn
16:42 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Installation at Thai Stanley Electric Public Company Limited Priroj Neamjarn
13:24 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT, Create i-Reporter form Panthita Roekdee
10:15 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #736 (New): Installation Anti virus Norton 360)
Install Anti virus Norton 360 all PC of Tomastech Arunwit Isarapongporn
10:08 ACME INDUSTRY CO.,LTD. 8.00 hours (Project progress work #603 (Closed): Support )
Online support about modify BOM&Planning Arunwit Isarapongporn
10:05 MAX(THAILAND)CO.,LTD. 4.00 hours (Parent project #582 (Closed): [PJ210031]Bus dispatch system Specifications)
Modify application about bus dispatch system Arunwit Isarapongporn
10:04 RICOH MANUFACTURING (THAILAND) LTD. 4.00 hours (Project progress work #274 (Closed): Sales for pegasus ricoh staff)
Internal meeting about OCR printer Arunwit Isarapongporn
10:00 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
Installation&On-site support Arunwit Isarapongporn
10:00 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
Modify&Test Handy terminal app Arunwit Isarapongporn
10:00 ACME INDUSTRY CO.,LTD. 8.00 hours (Parent project #704 (Closed): [PJ240038] Handy terminal app)
Modify&Test Handy terminal app Arunwit Isarapongporn

30 Sep 2024

23:42 TOMAS TECH CO., LTD. 1.00 hour (Project progress work #622 (In Progress): For internal meeting and other)
Soraya Norasing
23:41 YAMATO ELECTRIC (THAILAND) CO., LTD. 7.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Soraya Norasing
23:40 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
meeting with K.nack/K.nueng. edit function use location, edit function schedule outbound Soraya Norasing
23:39 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Stock management Soraya Norasing
23:39 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #593 (Closed): [Coding] Warehouse management system handyterminal Java)
Outbound schedule Soraya Norasing
17:26 HAMADEN MEXICO S.A.DE C.V 5.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Ajust command support kyence PLC. Taweesak Prumvised
17:26 THAI METALTECH CO., LTD. 3.00 hours (Project progress work #604 (Closed): [Coding] Warehouse management system handyterminal Java Phase01)
Change condition of SDI function. Taweesak Prumvised
16:55 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #735 (Closed): PICS handy terminal Document.)
Make Document HT Software. Kamol Anekchatnuntakool
16:30 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT(Meeting with K.So), Create i-Reporter form Panthita Roekdee
16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Adjust application follow Denso team. Priroj Neamjarn
16:24 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Adjust application follow Denso team. Priroj Neamjarn
07:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 8/36 Thanthima Phaengkham
07:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 7/36 Thanthima Phaengkham
07:50 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #493 (Closed): REPO - Version upgrade development support)
[Task] LAT - REPO - Conversion and Documents Creation 6/36 Thanthima Phaengkham
07:49 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC- Conversion and Documents Creation 8/36 Thanthima Phaengkham
07:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC- Conversion and Documents Creation 7/36 Thanthima Phaengkham
07:48 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #486 (Closed): CYLC - Operation test confirmation/Specification creation)
[Task] LAT - CYLC- Conversion and Documents Creation 6/36 Thanthima Phaengkham
07:47 LOGISTICS ALLIANCE (THAILAND) CO.,LTD. 8.00 hours (Project progress work #491 (Closed): PICS - Version upgrade development support)
[Task] LAT - PICS- Conversion and Documents Creation 38/37 Thanthima Phaengkham
01:26 NTPT COMPANY LIMITED. 4.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
01:25 NTPT COMPANY LIMITED. 6.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
01:19 NTPT COMPANY LIMITED. 8.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
01:19 NTPT COMPANY LIMITED. 3.00 hours (Project progress work #673 (In Progress): [Settings] Asprova implementation)
Kittisak Isarapongporn
01:23 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #608 (Closed): [Documentation] Get requirements of project)
Kittisak Isarapongporn
01:22 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 2.00 hours (Project progress work #733 (Closed): Design and documentation)
Kittisak Isarapongporn
01:18 A.N.I. LOGISTICS, LTD. 5.00 hours (Project progress work #713 (Closed): [Documentation] CKD Phase4 - Get requirements of project)
Kittisak Isarapongporn

27 Sep 2024

20:11 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Developed and completed added location column ng in database, website and modify bom Ronnagon Kongsuwan
20:10 YAMATO ELECTRIC (THAILAND) CO., LTD. 4.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Meeting Inbound Production, Outbound Shiping, Bom Ronnagon Kongsuwan
16:14 YAMATO ELECTRIC (THAILAND) CO., LTD. 8.00 hours (Project progress work #594 (Closed): [Coding] Warehouse management system handyterminal PHP web)
Completed Test and fixbug Inbound Item Material (Po Remain) with haddy. Ronnagon Kongsuwan
17:13 TOMAS TECH CO., LTD. 8.00 hours (Sales support #684 (Closed): HAMASHO AMR Concept)
HAMASHO meeting at mokara about AMR Konlawat Saechee
17:09 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #670 (Closed): Demo LEGO)
3d printer Konlawat Saechee
17:03 TOMAS TECH CO., LTD. 4.00 hours (Project progress work #670 (Closed): Demo LEGO)
LEGO Learning 3D Printer Konlawat Saechee
17:07 ADVICS MANUFACTURING (THAILAND) CO., LTD. 8.00 hours (Problem-Bug #716 (Closed): PLC data clear error)
PLC debug programing about data clear Konlawat Saechee
17:06 TOMAS TECH CO., LTD. 8.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
Aluminum frame design Konlawat Saechee
17:02 TOMAS TECH CO., LTD. 4.00 hours (Sales support #711 (Closed): LAZADA Barcode reader systems)
3D design Konlawat Saechee
17:04 TOMAS TECH CO., LTD. 8.00 hours (Sales support #710 (Closed): Demo Keyence 4 Set)
3D Drawing Konlawat Saechee
16:50 NIDEC TECHNO MOTOR (THAILAND) CO., LTD. 8.00 hours (Project progress work #721 (Closed): Modify PC Software.)
Revise and Update to Customer for Test PC Software. Kamol Anekchatnuntakool
16:38 HAMADEN MEXICO S.A.DE C.V 8.00 hours (Project progress work #694 (Closed): [Development] Software design and development)
Testing send data to kyence PLC Taweesak Prumvised
16:16 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Adjust Add Report Priroj Neamjarn
16:16 DENSO INNOVATIVE MANUFACTURING SOLUTION ASIA CO., LTD 8.00 hours (Project progress work #607 (Closed): [Coding] Web app Daily check project C#, HTML, CSS and JS)
Adjust Add Report Priroj Neamjarn
15:49 TOMAS TECH CO., LTD. 8.00 hours (Project progress work #714 (New): For internal meeting and other)
Support i-Reporter NTPT, Create i-Reporter form Panthita Roekdee
 